Attachment 0009 - Solicitation Tables_1 November 2023.pdf

PDF 254 KB Posted

Attached to
PM IS&A Intel Apps - Weather Operational Effects (WxOE) Solicitation
Solicitation number
W56KGY24R0001
Issued by

About this file

This document contains tables outlining the requirements and evaluation criteria for a solicitation seeking proposals for Project VISTA Innovative Technology. Offerors must submit proposal materials in Microsoft Word, Excel, PowerPoint and PDF formats within specified page count limits for factors including an executive summary, technical approach, price, and past performance. The technical factor will be evaluated on a color-coded adjectival rating scale from Blue (Outstanding) to Red (Unacceptable). The Project VISTA subfactor uses definitions of Meets and Does Not Meet (Neutral). Price will be evaluated using a total evaluated price worksheet. Past performance relevancy and confidence assessments will use defined adjectival ratings. The solicitation number is W56KGY24R0001 for PM IS&A Intel Apps - Weather Operational Effects (WxOE) issued by the Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 0009 – Solicitation Tables

Table 1. Requirements for Submission of Proposal Materials

Volume Title File Name

MS

Word Versio n

MS

Excel

Versio n

MS

Power Point Versio n

PDF

Versio n

Doc Not Require d

Maximu m Page Count

I Executive Summary

Proposal Summary

“PROP_SYN” X* - - X* - 10

Commercial

Item Assertions

“COMM_ITEM_ASSERT” X* - - X* - N/a

Glossary of

Abbreviations and Acronyms

“GLOSSERY” X* - - X* - N/a

Award Documents/

Certifications/ Representatio ns

“AWARDDOC_CERT_REP” X* X* - X* - N/a

Data

Assertions

“DATA_ASSERT” - X

- - - N/a

II Technical Factor (when applicable)

Project VISTA Innovative Technology

“PROJ_VISTA”- X* - - X* - 10

III Price Factor

TEP

Worksheet

“TOTAL_EVAL_PRICE” - X

- N/a

IV Past Performan ce

Past Performance

Record “PAST_PERF” X* - - X* - N/a

* Selection one (1) of the multiple versions offered.

** If the Offeror has both plan types, please submit both.

*** Page Count refers to MS PowerPoint slide count.

NOTE: Pages and slides that exceed the required maximum limitations will not be evaluated.

Additional pages and slides over the maximum allowed will be removed or not read and will not be evaluated by the Government.

Table 2. Technical Adjectival Rating

Table 3. Technical Risk Ratings

Color Rating

Adjectival Rating Description

Blue Outstanding Proposal demonstrates an exceptional approach and understanding of the requirements, contains multiple strengths and/or at least one significant strength.

Purple Good Proposal demonstrates a thorough approach and understanding of the requirements and contains at least one strength or significant strength.

Green Acceptable Proposal demonstrates an adequate approach and understanding of the requirements.

Yellow Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements.

Red Unacceptable Proposal does not meet requirements of the solicitation and, thus, contains one or more deficiencies and is unawardable, and/or risk of performance is unacceptably high.

Adjectival Rating Definition

Low Proposal may contain weakness/weaknesses which have low potential to cause disruption of schedule, increased cost, or degradation of performance. Normal contractor emphasis and normal Government monitoring will likely be able to overcome any difficulties.

Moderate Proposal contains a significant weakness or combination of weaknesses which may have a moderate potential to cause disruption of schedule, increased cost, or degradation of

Table 4. Project VISTA Innovative Technology Rating

Table 5. Past Performance Relevancy Ratings Adjectival Rating Definition

Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

Table 6. Past Performance Assessment Ratings

Satisfactory Confidence

Based on the Offeror’s recent/relevant performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort.

performance. Special contractor emphasis and close Government monitoring will likely be able to overcome any difficulties

High

Proposal contains a significant weakness or combination of weaknesses which is likely to have high potential to cause significant disruption of schedule, increased cost, or degradation of performance. Special contractor emphasis and close Government monitoring will unlikely be able to overcome any difficulties.

Unacceptable Proposal contains a deficiency or a combination of significant weaknesses that causes an unacceptable level of risk of unsuccessful performance.

Rating Definition

Meets Proposal contains Project VISTA Innovative Technology

Does Not Meet (Neutral)

Proposal does not contain Project VISTA Innovative Technology.

The Offeror will not be evaluated favorably or unfavorably on the Project VISTA Innovative Technology subfactor.

Neutral

No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonable assigned.

The offeror may not be evaluation favorable or unfavorable on the factor of past performance.

Limited Confidence Based on the Offeror’s recent/relevant performance record, the Government has low expectation that the Offeror will successfully perform the required effort.

No Confidence Based on the Offerors recent/relevant performance record, the Government has no expectation that the Offeror will successfully perform the required effort.

File details come from the government source that posted it. Updated .