This document contains two Contract Data Requirements Lists (CDRLs) for the Weather Operational Effects Application contract opportunity. The CDRLs require the contractor to deliver a Training Package and System Safety Assessment Report.

The Training Package CDRL requires the contractor to submit an initial training package no later than 15 days after receipt of order, following DI-ILSS-80872 requirements and contractor format. Revised submissions are due 15 days after government comments. Updated packages are due with each major release and will be submitted electronically to the Space and Missile Systems Center.

The System Safety Assessment Report CDRL requires compliance with MIL-STD-882 and submission to the Space and Missile Systems Center. The related solicitation is from the Department of the Army for the Weather Operational Effects program, issued by the Army Contracting Command at Aberdeen Proving Ground. Pricing and response dates are not specified.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER MGMT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Weather Operational Effects Application W56KGY-24-R-0001 TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

F001 Training Materials Training Package

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-ILSS-80872 SOW Para: 3.1.3, 3.2.3, 3.8, 3.9.2 SFAE-IEW-DC

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

LT ASREQ SEE BLOCK 16 b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

A ASREQ SEE BLOCK 16 Reg Repr o

16. REMARKS:

BLOCK 4: In addition to reporting requirement of DI-ILSS-80872, Contractor format acceptable.

BLOCK 10/11/12: Training Package shall be submitted NLT 15 days after receipt of order.

BLOCK 13: Revised submission shall be 15 days after receipt of Government comments. The contractor shall deliver an updated Training Package with each major release.

SFAE-IEW-DC

* ELECTRONIC

SUBMITTAL

SEE BLOCK 16

15. TOTAL 2

G. PREPARED BY

Andrew E. Kim PM IS&A – Intel Apps APM

H. DATE

10 Oct 2023

I. APPROVED BY J. DATE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER MGMT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Weather Operational Effects Application W56KGY-24-R-0001 TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

F002 System Safety Safety Assessment Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

MIL-STD-882 SOW Para: 3.18 SFAE-IEW-DC

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

LT ASREQ SEE BLOCK 16 b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

A ASREQ SEE BLOCK 16 Reg Repr o

16. REMARKS:

BLOCK 4: In addition to reporting requirement of DI-ILSS-80872, Contractor format acceptable.

BLOCK 10/11/12: Training Package shall be submitted NLT 15 days after receipt of order.

BLOCK 13: Revised submission shall be 15 days after receipt of Government comments. The contractor shall deliver an updated Training Package with each major release.

SFAE-IEW-DC

* ELECTRONIC

SUBMITTAL

SEE BLOCK 16

15. TOTAL 2

G. PREPARED BY

Andrew E. Kim PM IS&A – Intel Apps APM

H. DATE

10 Oct 2023

I. APPROVED BY J. DATE

File details come from the government source that posted it. Updated .