Exhibit C_C001-C002 CDRLS - STR AND SFCR_10 October 2023.pdf

PDF 249 KB Posted

Attached to
PM IS&A Intel Apps - Weather Operational Effects (WxOE) Solicitation
Solicitation number
W56KGY24R0001
Issued by

About this file

This document contains two Contract Data Requirements Lists (CDRLs) for the Weather Operational Effects Application contract opportunity. The CDRLs require the delivery of scientific and technical reports and software/firmware change requests. The reports must address work described in the Statement of Work and be submitted electronically in Microsoft Office formats. Change requests are due as required. The contracting agency is the Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground. The solicitation number is W56KGY24R0001 and it seeks a contractor to provide weather operational effects capabilities.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

C001 C TDP TM OTHER MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Weather Operational Effects Application W56KGY-24-R-0001 TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

C001 Scientific and Technical Reports Field Support Technical Manual

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MISC-80711A SOW Para 3.1.3, 3.2.3, 3.8, 3.9.2 SFAE-IEW-DC

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

LT ASREQ 140 DAYS XDADO b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

A N/A SEE BLOCK 16 Reg Repr o

16. REMARKS:

BLOCK 4: In addition to the requirement of DI-MISC 80711A, the contractor shall include all the information required by the SOW. Contractor format acceptable.

BLOCK 12: Deliverables shall be complete, stand-alone, and address all the concerns in PWS paragraphs shown in Block 5. Deliverables shall be submitted and exchanged electronically, in Microsoft ® Office product suite or in searchable digital formats.

BLOCK 13: The contractor shall deliver documents with each major release.

SFAE-IEW-DC

ACC-APG (CCAP-CCC)

*ELECTRONIC SUBMITTAL

15. TOTAL 3

G. PREPARED BY

Andrew E. Kim PM IS&A – Intel Apps APM

H. DATE

10 Oct 2023

I. APPROVED BY J. DATE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

C002 C TDP TM OTHERMISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Weather Operational Effects Application W56KGY-24-R-0001 TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

C002 Software/Firmware Change Request

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MISC-81807 SOW Para 3.11.2, 3.13.2 SFAE-IEW-DC

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

LT ASREQ ASREQ b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

A N/A ASREQ Reg Repr o

16. REMARKS: SFAE-IEW-DC

ACC-APG (CCAP-CCC)

*ELECTRONIC SUBMITTAL

SEE BLOCK 16

15. TOTAL 3

G. PREPARED BY

Andrew E. Kim PM IS&A – Intel Apps APM

H. DATE

10 Oct 2023

I. APPROVED BY J. DATE

File details come from the government source that posted it. Updated .