W56HZV17R9997-0012 - RFP Amendment Copy for Completion

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

*** SEE SF30 CONTINUATION SHEET FOR MODIFICATION DETAILS***

1. CONTRACT ID CODE PAGE OF PAGES

J 1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Jul-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W56HZV-17-R-9997

X 9B. DATED (SEE ITEM 11)

15-Jun-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Jul-2017

CODE

ARMY CONTRACTING COMMAND - WARREN (DTA)

6501 E. 11 MILE RD

WARREN MI 48397-500

W56HZV 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W56HZV-17-R-9997

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by reference:

52.229-3 Federal, State And Local Taxes FEB 2013

The following have been added by full text:

RFP AMENDMENT 0012

The purpose of Amendment 0012 is, as follows:

1. To update Attachment F with all of the final answers to submitted questions.

2. To incorporate FAR Clause 52.229-3.

3. To provide the request for proposal (RFP) modification 0012 and conformed copy with all attachments and technical exhibits for contractor review, acknowledgement, completion, and submission.

SECTION SF 1449 - CONTINUATION SHEET

The following have been modified:

ATTACHMENT F

US Army Women’s Museum Center for Military History

Answers to Questions

1. Asking if you are familiar with whether this solicitation will include window treatments (draperies, blinds, shades).

Answer: The gallery does not have any windows.

2. Is the fabrication Contractor to supply the flooring in the exhibit spaces?

Answer: The contractor would only supply the flooring if it was part of the exhibit. That is scenic in nature. Say the dirt and boards at the bottom of a world war one trench.

3. Is a payment schedule planned based on the cinc’s or shall we propose a payment schedule in our proposal? The responses have been confusing.

Answer: Payments are based on the CLINS.

4. Is the existing building contractor supplying track and fixtures I the new gallery?

Answer: Design of the track lighting system will be by the contractor. The track and fixtures will be purchased and installed by the government based on those designs.

5. Is the contractor responsible for removing and existing floor carpet and other flooring in the existing portion of the museum?

Answer: No. That will be done by the museum.

6. Is the Contractor responsible for providing and installing the floor carpeting throughout the 10,000 sq ft of the museum?

Answer: The contractor is only responsible for floor treatments that are part of a scenic effect such as dirt and boards at the bottom of a WWI trench. The remainder of the floor covering would be done by the museum.

7. Is the contractor responsible for removing the existing light track and fixtures in the existing museum?

Answer: No. That will be done by the museum.

8. Is the contractor responsible for providing and install new track and light fixtures for ambient lighting throughout the museum?

Answer: No. That will be purchased and installed by the museum. The contractor is only responsible for designing the system.

9. If so who is responsible for hard wiring the new lighting and control switches?

Answer: N/A

10. Please specify the quality of the diorama mannequins.

Answer: The mannequins in the dioramas should be of Life Formations, quality. The conservation forms should be Doorman.

11. Please specify the level of detail and nature of the model of the Women’s Army Corp Compound at Long Binh, Vietnam.

Answer: This item has been dropped.

12. What size monitor will be required for the “rotunda” presentation area?

Answer: This will need to be determined during the design.

13. Will any of the monitors in the museum need to be 4K resolution?

Answer: No

14. In the Children’s Learning Area description, Page 12 Item 8, there is a requirement for reproduction uniforms and weapons. Are these provided by the Government or are they to be supplied by the contractor?

Answer: The reproduction uniforms and weapons will be provided by the Government.

15. Payment Terms – can you please confirm that you are flexible in the payment terms and that we will be able to collect payments for the project tied to a Schedule of Values, broken out by month?

Will this be acceptable?

Answer: Payments will be done by contract line item (CLIN).

16. Is it acceptable to secure all fixtures to the concrete floor, by drilling holes for bolts, etc.

Answer: Yes

17. Is the lighting for both the new and existing galleries included in our scope of work? If so, has the Architect specified lighting for the new space, and is it to be used in the existing space? If included in the scope of work for this contract, please provide the lighting specs.

Answer: Contractor will be responsible for the design of the track lighting system. The purchase and installation will be the responsibility of the Army.

18. Please confirm that the Architect is providing all adequate power to the space for all lighting, signal, and AV equipment in the new space, and that there is no electrical work required in our space of work for this contract.

Answer: There is ample lighting tracks and circuits in the old space. Likewise, there is more than enough circuits, amperage, junction boxes etc to handle any lighting requirements in the new gallery space. There are 9 junction boxes in the ceiling each with their own circuit. There are 16 outlets wired/ready to use on 3 of the gallery walls-- 4 outlets to 1 circuit. There is no electrical work required by the contractor.

All lighting and electrical work within the exhibit components designed and fabricated by the contractor will be supplied and installed by the contractor. Example: If you build a case with lighting in it and it is hard wired. You supply the case complete with the lighting and an electrical cable from the lights to an electrical box in your case. The army will pull the cable from the existing electrical system and do the connection in the electrical box you have provided.

19. Re: Current Hours of Operation – Monday – Friday 8-5, and the time required to obtain Visitor passes in order to have access to the site for installation, can you make any exceptions with these hours of access to the site for the exhibit installation, and/or lessen the requirement for issuing contractor visitor passes?

Answer: Access to the museum outside of published hours can be accommodated with prior coordination. Additionally, Contractors, Vendors and Volunteers are eligible for longer term passes to access the installation with sponsorship from the COR. Visit www.lee.army.mil/access or call the VCC at (804) 734-5053 during operating hours for more information.

20. Please provide details on the casework fabrication and what level of conservation is required (National Park Service Conservation Standards – Level 1, 2, 3, or 4?). Can you specify the level of climate/humidity/temperature control required inside of the case environments?

Answer: Conservation is not part of the contractor’s scope. All conservation work will be the responsibility of the government. The cases do not need to be sealed. No humidity or temperature control is necessary.

21. If we are awarded this project, are we exempt from sales tax?

22. Is the A/V hardware excluded from the “Buy America Act”?

23.Do any of the artifacts need to be conserved? If so, will the contractor be responsible for conservation prior to mounting? Same question for the uniform artifacts.

Answer: All conservation work shall be done by the army.

24. How will flooring be handled? Who's scope is it in?

Answer: The only flooring that falls in the scope of work for this contract is if any scenic effects are done. An example would be a WWI trench you walk through with boards and dirt. The rest of the floor treatments will be specified in your design but purchase and installed by the army.

25. Lighting: In order to accurately price room-based lighting and avoid duplicative systems, it would be helpful to understand what the current plans are for the new addition as well as existing building electrical infrastructure.

Answer: The contractor is responsible for the design of the lighting system. The purchase and its installation will be the responsibility of the army. There is ample lighting tracks and circuits in the old gallery space. Likewise, there is more than enough circuits, amperage, junction boxes etc to handle any lighting requirements in the new gallery space. There are 9 junction boxes in the ceiling each with their own circuit. There are 16 outlets wired/ready to use on 3 of the gallery walls-- 4 outlets to 1 circuit.

26. To that end is it possible to obtain a PDF copy of the electrical plans for the new work in order for us to accurately bid this? These would be from the architect or engineer of record on the current project and would/might include:

Reflected ceiling plan or lighting plan

Power riser diagrams

Panel schedules

Answer: All of the detailed plans (power riser diagrams, panel schedules etc) for the new and old space from the architect and builder are available. These will be provided at the kick off meeting.

27. Considering the size and scope of this proposal, and the design requirements, would the US ARMY WOMEN'S MUSEUM allow for a three-week extension to the RFP deadline so that we can submit a realistic proposal given all the elements discovered during the walk-through phase?

Answer: No. We would not like to see an extension.

28. The bid document stipulates that the Offeror must be in compliance with the NAICS code 541410 (which has a gross earnings cap of $7.5m). How can the US ARMY WOMEN'S museum award something worth half of that cap amount to a company under $7.5m? (Companies are just going to give the work to larger fabrication firms). Would the US ARMY WOMEN'S MUSEUM allow for an easement in this coding requirement for smaller companies seeking to partner in the design/fabrication effort?

Answer: As was already posted in Amendment 0004 to solicitation, the Government does not intend to change the NAICS code for this requirement.

29. In light of the on-going install of electrical wiring...will there be circuits set aside for AV needs, dimmer needs, etc?

Answer: Yes there is. There is ample lighting tracks and circuits in the old space. Likewise, there is more than enough circuits, amperage, junction boxes etc to handle any lighting requirements in the new gallery space. There are 9 junction boxes in the ceiling each with their own circuit. There are 16 outlets wired/ready to use on 3 of the gallery walls-- 4 outlets to 1 circuit. (Additionally there are 4 LAN lines wired in too.)

30. Will any of the casework or vitrines be reused from the 5000 sq. ft. gallery to alleviate costs so more resources can go towards the diorama's?

Answer: No all of the exhibit components will be new. Nothing will be used from existing exhibits.

31. What level of conservation is required by the Museum with artifacts and uniforms?

Answer: All conservation will be done by the museum. The contractor is not responsible for any conservation work.

32. Will artifacts requiring special/complicated mounting be allowed off-site at vendor's facility?

Answer: No. All work with artifacts will need to take place at the museum.

LIST OF DOCUMENTS AND EXHIBITS

LIST of EXHIBITS AND ATTACHMENTS

List of

Addenda Title Date Number of Pages

Technical Exhibit 1 Deliverables Schedule – CDRL A001-A013 4/05/2017 3

Technical Exhibit 2 AWM Lighting Infrastructure – New Gallery 6/22/2017 1

Technical Exhibit 3 AWM Lighting Infrastructure – Old Gallery 6/22/2017 1

Technical Exhibit 4 USAWM Combined Gallery Spaces 2017 7/05/2017 1

Attachment A Past Performance Questionnaire 4/24/2017 5

Attachment B Answers to Contractor Questions 6/21/2017 3

Attachment C Answers to Further Contractor Questions 6/22/2017 1

Attachment D Answers to Further Questions 6/23/2017 1

Attachment E More Questions With Answers 6/29/2017 4

Attachment F Answers to Contractor Final Questions 7/06/2017 2

7/10/2017 2

(End of Summary of Changes)