CDRL_A004_First_Production_Final_Report.pdf
PDF 84 KB Posted
- Attached to
- Commercial Vehicles Federal contract opportunity
- Solicitation number
- W56HZV-17-R-0092
About this file
Exhibit E CDRL A004 First Production Final Report
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W56HZV17R0092-0004.pdf | ||
| W56HZV-17-R-0092_0004.pdf | ||
| W56HZV17R0092-0001.pdf | ||
| Attachment_0005_Critical_Components_List-Toyota_LCSUV.pdf | ||
| Attachment_0010_TIQ_ToyotaLCAmb.doc | DOC document | |
| W56HZV17R0092.pdf | ||
| Attachment_0011_TIQToyotaLCMob.doc | DOC document | |
| Attachment_0001_Pricing_Matrix.xlsx | XLSX spreadsheet | |
| Attachment_0008_TIQ_ToyotaLCPU.doc | DOC document | |
| CDRL_A001_Photographs.pdf | ||
| Attachment_0006_Critical_Components_List-Toyota_Ambulance.xlsx.pdf | ||
| CDRL_A002_Minutes_and_Agendas.pdf | ||
| Attachment_0009_TIQToyotaLCSUV.doc | DOC document | |
| Attachment_0004_Critical_Components_List-Toyota_LCPU.XLSX.pdf | ||
| CDRL_A003_Final_Inspection_Report.pdf | ||
| Attachment_0007_Critical_Components_List-Toyota_LCMob.xlsx.pdf | ||
| Single_Platform_Multiple_Variant_RFI_2017.xlsx | XLSX spreadsheet |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
| 1_DATA_ITEM_NO: A004 |
| 2_TITLE_OF_DATA_ITEM: First Production Vehicle Final Report |
| 3_SUBTITLE: N/A |
| 4_AUTHORITY_Data_Acquisit: DI-NDTI-80809B |
| 5_CONTRACT_REFERENCE: E.3.3 |
| 6_REQUIRING_OFFICE: AMSTA-MSS-D |
| 7_DID_250_REQ: LT |
| 8_APP_CODE: A |
| DIST_STATEMENT: C |
| 10_FREQUENCY: See Block 16 |
| 11_AS_OF_DATE: See Block 16 |
| 12_DATE_OF_FIRST_SUBMISSI: See Block 16 |
| 13_DATE_OF_SUBSEQUENT_SUB: See Block 16 |
| addressee1: Joe Leitheiser |
| draft1: |
| reg1: 1 |
| repro1: |
| addressee2: PCO |
| draft2: |
| reg2: 1 |
| repro2: |
| addressee3: |
| draft3: |
| reg3: |
| repro3: |
| addressee4: |
| draft4: |
| reg4: |
| repro4: |
| addressee5: |
| draft5: |
| reg5: |
| repro5: |
| addressee6: |
| draft6: |
| reg6: |
| repro6: |
| addressee7: |
| draft7: |
| reg7: |
| repro7: |
| addressee8: |
| draft8: |
| reg8: |
| repro8: |
| addressee9: |
| draft9: |
| reg9: |
| repro9: |
| addressee10: |
| draft10: |
| reg10: |
| repro10: |
| addressee11: |
| draft11: |
| reg11: |
| repro11: |
| addressee12: |
| draft12: |
| reg12: |
| repro12: |
| addressee13: |
| draft13: |
| reg13: |
| repro13: |
| addressee14: |
| draft14: |
| reg14: |
| repro14: |
| addressee15: |
| draft15: |
| reg15: |
| repro15: |
| addressee16: |
| draft16: |
| reg16: |
| repro16: |
| addressee17: |
| draft17: |
| reg17: |
| repro17: |
| addressee18: |
| draft18: |
| reg18: |
| repro18: |
| addressee19: |
| draft19: |
| reg19: |
| repro19: |
| addressee20: |
| draft20: |
| reg20: |
| repro20: |
| addressee21: |
| draft21: |
| reg21: |
| repro21: |
| addressee22: |
| draft22: |
| reg22: |
| repro22: |
| addressee23: |
| draft23: |
| reg23: |
| repro23: |
| addressee24: |
| draft24: |
| reg24: |
| repro24: |
| addressee25: |
| draft25: |
| reg25: |
| repro25: |
| addressee26: |
| draft26: |
| reg26: |
| repro26: |
| addressee27: |
| draft27: |
| reg27: |
| repro27: |
| addressee28: |
| draft28: |
| reg28: |
| repro28: |
| addressee29: |
| draft29: |
| reg29: |
| repro29: |
| addressee30: |
| draft30: |
| reg30: |
| repro30: |
| addressee31: |
| draft31: |
| reg31: |
| repro31: |
| addressee32: |
| draft32: |
| reg32: |
| repro32: |
| addressee33: |
| draft33: |
| reg33: |
| repro33: |
| addressee34: |
| draft34: |
| reg34: |
| repro34: |
| addressee35: |
| draft35: |
| reg35: |
| repro35: |
| addressee36: |
| draft36: |
| reg36: |
| repro36: |
| addressee37: |
| draft37: |
| reg37: |
| repro37: |
| addressee38: |
| draft38: |
| reg38x: |
| repro38: |
| total_draft: 0 |
| total_repro: 0 |
| 16_REMARKS: The contractor shall submit the final report to the Government no less than 14 calendar days following the completion of the first production vehicle inspection and testing requirements. The report shall, at a minimum, include: |
1. Variant inspected and tested
2. Documented results of the TIQ review (see E.3.4.1)
3. Deficiencies and corrective actions from the TIQ review
4. A copy of the completed Final Inspection Report (FIR), including inspection, road test, and control test results. (see E.3.4.2)
5. Deficiencies and corrective actions from the FIR, road test, and control test.
6. Deficiencies and corrective actions from the variant-specific first production requirements, if applicable.
7. Plan and schedule to implement corrective actions from items 3, 5, and 6 into design and production to prevent re-occurrence, including implementation on other variants and at other facilities.
| 17_PRICE_GROUP: |
| ESTIMATED_TOTAL_PRICE: |
| G_PREPARED_BY: Joe Leitheiser |
| H_DATE: August 2017 |
| 1_APPROVED_BY: |
| J_DATE: |
| Page: 1 |
| reg38t: 2 |
| A_CONTRACT_LINE_ITEM_NO: A004 |
| B_EXHIBIT: |
| TDP: |
| TM: |
| OTHER: X |
| DSYSTEMITEM: Toyotas |
| E_CONTRACTPR_NO: W56HZV17CXXXX |
| FCONTRACTOR: TBD |
| 16_REMARKS_Continued: |
| Page2: |
| of_pages: 1 |
| Reset: |
File details come from the government source that posted it.