CDRL_A003_Final_Inspection_Report.pdf

PDF 84 KB Posted

Attached to
Commercial Vehicles Federal contract opportunity
Solicitation number
W56HZV-17-R-0092
Issued by
Department of the Army Materiel Command Contracting Command Detroit Arsenal

About this file

Exhibit D CDRL A003 Final Inspection

View the file

Other files for this federal contract opportunity

Other files attached to Commercial Vehicles, newest first.
File Type Posted
W56HZV17R0092-0004.pdf PDF
W56HZV-17-R-0092_0004.pdf PDF
W56HZV17R0092-0001.pdf PDF
Attachment_0005_Critical_Components_List-Toyota_LCSUV.pdf PDF
Attachment_0010_TIQ_ToyotaLCAmb.doc DOC document
W56HZV17R0092.pdf PDF
CDRL_A001_Photographs.pdf PDF
Attachment_0006_Critical_Components_List-Toyota_Ambulance.xlsx.pdf PDF
CDRL_A004_First_Production_Final_Report.pdf PDF
CDRL_A002_Minutes_and_Agendas.pdf PDF
Attachment_0009_TIQToyotaLCSUV.doc DOC document
Attachment_0011_TIQToyotaLCMob.doc DOC document
Attachment_0001_Pricing_Matrix.xlsx XLSX spreadsheet
Attachment_0008_TIQ_ToyotaLCPU.doc DOC document
Attachment_0004_Critical_Components_List-Toyota_LCPU.XLSX.pdf PDF
Attachment_0007_Critical_Components_List-Toyota_LCMob.xlsx.pdf PDF
Single_Platform_Multiple_Variant_RFI_2017.xlsx XLSX spreadsheet
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

1_DATA_ITEM_NO: A003
2_TITLE_OF_DATA_ITEM: Final Inspection Report (FIR)
3_SUBTITLE: N/A
4_AUTHORITY_Data_Acquisit: DI-NDTI-80809B
5_CONTRACT_REFERENCE: E.2.2.1, E.2.2.1.1, E.2.2.2, E.2.3.1
6_REQUIRING_OFFICE: AMSTA-MSS-D
7_DID_250_REQ: LT
8_APP_CODE: A
DIST_STATEMENT: C
10_FREQUENCY: See Block 16
11_AS_OF_DATE: See Block 16
12_DATE_OF_FIRST_SUBMISSI: 60 DARO
13_DATE_OF_SUBSEQUENT_SUB: See Block 16
addressee1: Joe Leitheiser
draft1: 1
reg1: 1
repro1:
addressee2: PCO
draft2:
reg2: 1
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 1
total_repro: 0
16_REMARKS: FIRs shall be submitted electronically to the Government for review and approval of the content.

The contractor shall submit each variant-specific FIR for each variant being produced.

The initial submission of the draft FIRs shall be at the Start of Work Meeting. The Government will review and approve or reject the FIR content. If rejected, the Government will provide reasons for rejection. The contractor shall address all rejection issues and resubmit electronically for approval until the Government approves each FIR.

Following Government approval, the contractor shall submit any subsequent modifications to the FIRs to the Government for approval in accordance with initial submission approval process.

A copy of each completed FIR shall be submitted to the Government following the inspection and acceptance of each vehicle.

17_PRICE_GROUP:
ESTIMATED_TOTAL_PRICE:
G_PREPARED_BY: Joe Leitheiser
H_DATE: August 2017
1_APPROVED_BY:
J_DATE:
Page: 1
reg38t: 2
A_CONTRACT_LINE_ITEM_NO: TBD
B_EXHIBIT:
TDP:
TM:
OTHER: X
DSYSTEMITEM: Toyotas
E_CONTRACTPR_NO: W56HZV17CXXXX
FCONTRACTOR: TBD
16_REMARKS_Continued:
Page2:
of_pages: 1
Reset:

File details come from the government source that posted it.