Attachment 0019 - LLRC Design Proposal Format.doc

DOC document 62 KB Posted

Attached to
FMTV A2 Production Effort Federal contract opportunity
Solicitation number
W56HZV16R0024
Issued by
Department of the Army Materiel Command Contracting Command Detroit Arsenal

About this file

Attachment 0019

View the file

Other files for this federal contract opportunity

Other files attached to FMTV A2 Production Effort, newest first.
File Type Posted
Conformed_RFP_through_Amd_0008.pdf PDF
W56HZV16R0024-0008.pdf PDF
Conformed_RFP_through_AMD_0007.pdf PDF
W56HZV16R0024-0007.pdf PDF
Attachment_0052_-_Vehicle_Dynamics_Data_Sheet_(30_Mar_2016).xlsx XLSX spreadsheet
Questions_and_Answers_Reference_Number_65.pdf PDF
W56HZV-16-R-0024_Conformed_Copy_through_Amendment_6.pdf PDF
Questions_and_Answers_Reference_Numbers_63-64.pdf PDF
Attachment_0067_-_Test_Summary_Report__(24_Jan_2017).pptx PPTX presentation
Attachment_0027_-_Government_Furnished_Property_and_Equipment_(10_February_2017).xlsx XLSX spreadsheet
W56HZV16R0024-0006.pdf PDF
Questions_and_Answers_Reference_Numbers_61-62.pdf PDF
Questions_and_Answers_Reference_Numbers_56-60.pdf PDF
Questions_and_Answers_Reference_Numbers_49-55.pdf PDF
Attachment_0046_-_Performance_Requirements_Matrix_(20_Dec_2016).xlsx XLSX spreadsheet
W56HZV16R0024-0004.pdf PDF
W56HZV16R0024-0003.pdf PDF
W56HZV16R0024-0002.pdf PDF
Attachment_0052_-_Vehicle_Dynamics_Data_Sheet_(16_Nov_2016).xlsx XLSX spreadsheet
Attachment_0046_-_Performance_Requirements_Matrix_(16_Nov_2016).xlsx XLSX spreadsheet
Attachment_0068_-_Use_and_NDA.docx DOCX document
W56HZV16R0024-0001.pdf PDF
Attachment 0020 - CDRS Search Request.pdf PDF
Attachment 0034 - CSDR Plan.pdf PDF
Attachment 0021 - Warranty SIC Parameter Requirements.docx DOCX document
Attachment 0014- Attribute Selection Worksheet.xlsx XLSX spreadsheet
Attachment 0035 - DD Form 254.pdf PDF
Attachment 0030 - Projected Net Classes.xlsx XLSX spreadsheet
Attachment 0052 - Vehicle Dynamics Data Sheets.xlsx XLSX spreadsheet
Attachment 0068 - Use and Non Disclosure Agreement.rtf RTF text file
Attachment 0051 - VCI Data.xlsx XLSX spreadsheet
Attachment 0046 - Performance Requirements Matrix.xlsx XLSX spreadsheet
Attachment 0032 - Overpaint Criteria.doc DOC document
Attachment 0017 - Incoming Transaction Format.doc DOC document
Attachment 0045 - TIR and FACAR Report Data.pdf PDF
Attachment 0049 - TDP BOM.xlsx XLSX spreadsheet
Attachment 0003 - TDP Option Selection Worksheet.docx DOCX document
Attachment 0053 - Failure Definition - Scoring Criteria.doc DOC document
Attachment 0061 - Hardware and Software List.xls XLS spreadsheet
Attachment 0067 - Test Summary Report.pptx PPTX presentation
Attachment 0013 - NMWR Candidate List.docx DOCX document
Attachment 0050 - Technical Maturity Rubric.docx DOCX document
Attachment 0026 - Draft FMTV Trailer De-Processing Checksheet.xls XLS spreadsheet
Attachment 0057 - Certification of Small Business Size and Socioeconomic Status for Subcontractors Not Registered In SAM.docx DOCX document
Attachment 0012 - Logistics Integrated Master Schedule.xlsx XLSX spreadsheet
Attachment 0005 - Windchill User Guide.pdf PDF
Attachment 0027 - Government Furnished Property and Equipment.xlsx XLSX spreadsheet
Attachment 0004 - PdM MTV Drawing and Modeling Standards and Best Practices.pdf PDF
Attachment 0028 - Lateral Transfer Request Form Template.xls XLS spreadsheet
Attachment 0055 - Vehicle Configuration Tables.xlsx XLSX spreadsheet
Show all 50

FMTV A2 Production Effort has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LLRC DESIGN PROPOSAL FORMAT

Develop Long Life Reusable Containers (LLRC) for the _____

1.0 PURPOSE

The ___ Assembly (part number ____) requires the development, validation, and documentation of a new reusable shipping and storage container due to its unique dimensions and Government requirements described within this document. Upon completion of the efforts described within this document, the new reusable shipment and storage container will be implemented for the spare and repair part packaging, handling, storage, and transportability requirements of the ___ Assembly. The container will be designed to accommodate the ___ Assembly only. The Government requirements of the container are contained in SAE ARP 1967B with the exceptions listed in Appendix A of this document.

2.0 REUSABLE CONTAINER DEVELOPMENT

The LLRC vendor shall provide a reusable container for the ___ Assembly (part number ___) in accordance with SAE ARP 1967B. Exceptions from this practice are noted in Appendix A. The effort includes cost for development, design prototype construction, validation, and completion of the technical data package for competitive procurement.

This container shall only be fabricated from steel, aluminum or composite material and must be Chemical Agent Resistant Coatings (CARC) finished as defined in SAE ARP 1967B. The use of wood in the design and fabrication of this reusable container is forbidden except for the container skids. This container should, as required, incorporate energy absorbing systems, dehumidification systems, and other special features to ensure protection of the item. This container should be capable of being repaired and/or retrofitted to prolong container service life or modified to adapt reusable container for shipment of the items other than for which it was originally intended. TB 9-289, Technical Bulletin for the Reconditioning of Type I and Type II Reusable Metal Containers, shall be used as a guide.

The container size shall be of the minimum, consistent with the size of the contents and the performance requirements of SAE ARP 1967B. During the life of the container, it will experience multi-model transportation (truck, rail, air, and ocean) so size considerations shall include all modes of transportation.

3.0 DEVELOPMENT PROCESS

· _______ will solicit LLRC vendors with Request For Quote (RFQ).

· LLRC vendors to submit an itemized proposal with line item pricing to include, but not limited to, the following items:

1. Produce Design Concept (drawing package or 3-D model) for Approval.

2. Host the Design Review.

3. Construct the Prototype Container.

4. Develop and Submit Test Plan for Approval.

5. Validation of Container for Approval.

6. Develop and Deliver Technical Data Package for Approval.

· ______ to select LLRC vendors and award a purchase order.

· LLRC vendor to provide design concept to _____

· Design review and acceptance.

· ___ to authorize LLRC vendor to build prototype.

· LLRC vendor to submit test plan to _____ for acceptance.

· LLRC vendor to validate/test the prototype and receive acceptance from __

· LLRC vendor to develop technical data package and submit to _____ for acceptance.

4.0 VALIDATION

Upon receiving _____ approval of the reusable container design test report, the LLRC vendor shall provide a complete Technical Data Package (TDP) for the reusable shipping and storage container. The TDP shall include engineering drawings and associated lists in sufficient detail to provide for a competitive procurement. _____ will supply Army part numbers and/or drawing numbers for the new parts and drawings. Engineering drawings shall comply with ASME-Y14.100 2000 and ASME-Y14.5M 1984. Configuration management data shall comply with MIL-HDBK-61. Electronic drawing file format shall be PRT, IGES, and PDF.

5.0 ITEMS PROVIDED BY ______

Upon purchase order acceptance, _____ will provide the LLRC vendor with one ___ Assembly (part number ___), drawings, and other relevant information. ___ will pay shipping cost for shipping the item to the LLRC vendor. The LLRC vendor will pay shipping cost for returning the item together with the prototype LLRC to ____.

6.0 ITEMS PROVIDED BY LLRC VENDOR

Upon purchase order acceptance, the LLRC vendor will provide the following;

· Project Management (showing project cost and schedule).

· Design concept/report (drawing package or 3-D model).

· Prototype container.

· Validation testing plan, perform testing, and validation test report including instrument record data.

· Technical Data Package (TDP).

7.0 DATES

Included in the proposal shall be a detailed schedule. The schedule shall include, but is not limited to, the following dates:

· Provide design concept and host design concept review.

· Completion of prototype, validation testing plan, and perform testing.

· Validation test report and records are due 30 days after validation.

· Completion of TDP provided to ___.

8.0 ___ TECHNICAL CONTACT

Appendix A Revisions and Exceptions to SAE ARP 1967B The below listed paragraphs are exceptions to SAE ARP 1976B as requested by the U.S. Army Tank Automotive Command (TACOM) and shall be included with the container development/design effort. The exceptions listed apply to the specific paragraph noted and do not flow down to the sub-paragraphs in each section.

3.1.2 – N/A. This paragraph is not applicable to this requirement.

3.3.1.3 – Replace paragraph with the following:

Vibration and Shock Isolation: The container shall be designed so as to prevent damage to the item resulting from the tests of section 4. Elastomeric isolators shall have a transmissibility of no more than 5 to 1, and transmit no more than 15 G’s to the item during drop testing. If consistent with the shock requirements and other design considerations, the resonant frequency of the loaded suspended system in the major translational modes of vibration shall be above 7.0 Hz.

3.3.1.3.1 – Replace paragraph with the following:

Elastomeric Isolators: If elastomeric isolators are used each isolator shall be marked with its date of manufacture. The date shall be visible when the mount is installed. Elastomeric isolators shall meet the requirements of A-A-52486. Elastomeric isolators shall not exceed 18 months old when first installed.

3.3.2 – The last sentence does not apply.

3.3.3.2.2 – Replace the first sentence with:

All sealing surfaces shall be such to ensure sealing under performance requirements of this specification at 20 kPa (3.0 psig) positive pressure.

3.3.3.2.3 – Replace paragraph with the following:

The time required to open the container, remove the item, reinstall the item and to close the container for shipment shall not exceed two man hours.

3.3.4.2 – N/A. This paragraph is not applicable to this requirement.

3.3.5.2- Replace the first two sentences with:

The container shall incorporate 30-40-50 percent relative humidity indicator conforming to AS26860.

3.3.5.3 – N/A. This paragraph is not applicable to this requirement.

3.3.5.5 – N/A. This paragraph is not applicable to this requirement.

3.3.5.6 – N/A. This paragraph is not applicable to this requirement.

3.3.5.9 – N/A. This paragraph is not applicable to this requirement.

3.7.2- Replace paragraph with the following:

Color: Unless otherwise specified (see Section 6) the interior and exterior of the containers shall be primed and painted.

3.7.3 - Replace paragraph with the following:

Chemical Agent Resistant Coating (CARC): When specified (see Section 6) containers requiring CARC shall be in accordance with MIL-C-53072. All steel surfaces, except threaded and other working surfaces, shall be finished IAW the requirements of TACOM drawing 12369003. All aluminum alloy surfaces, except threaded and other working surfaces, shall be finished IAW the requirements of TACOM drawing 12369001. In addition to the marking requirements of 3.9, “CARC” shall be marked in 25 mm (1 in) letters in an area as near as practicable to the nameplate. Topcoat conforming to the requirements of TACOM drawing 12369003 or TACOM drawing 12369001, as applicable, color black (37030 or 37083), shall be used for all marking.

3.7.4 – N/A. This paragraph is not applicable to this requirement.

3.8.2- Replace the last sentence with:

Shock loads transmitted to the item shall not exceed 15 G’s. To demonstrate this requirement, longitudinal, vertical and lateral accelerations shall be measured by accelerometers mounted as close as possible to the center of gravity of the item. Permanent recordings of the accelerometer readings shall be made on a device having a range from one to 100 cycles per second (CPS).

3.9- Replace paragraph with the following:

Markings: When specified (see Section 6) for containers requiring CARC, markings shall be clearly visible using topcoat conforming to the requirements of TACOM drawing 12369003 or TACOM drawing 12369001, as applicable, color black (37030 or 37083). The following markings shall be applied to all containers at the locations and in the sizes indicated unless impractical, in which case markings may be reduced or increased in proportion to the size of the container.

3.9 a. – Replace paragraph with the following:

Adjacent to the container cover lifting rings, eyes or lugs in 45 to 51mm (1.0 inch) letters:

LIFT HERE

3.9 b. – Replace 45 to 51mm (1.75 to 2.0 inches) with (1.0 inch).

3.9 c. – Replace (1.0 inch) with (0.5 inch).

3.9 d. – Replace (1.0 inch) with (0.5 inch).

3.9 e. – Replace (1.0 inch) with (0.5 inch).

3.9 f. – Replace paragraph with the following:

At the loaded center of balance at fork lift entries, a vertical line 1.52 mm (6.0 in) long and 25 mm (1.0 in) wide with the marking adjacent in 25 (1.0 in) letters:

LOADED CENTER OF BALANCE

3.9 g. – N/A. This paragraph is not applicable to this requirement.

3.9 h. – Replace (In four places on the shell) with (In two places on the sides of the shell).

3.9 i. – N/A. This paragraph is not applicable to this requirement.

3.9 l. – Replace (1.0 inch) with (0.5 inch).

3.9 m. – N/A. This paragraph is not applicable to this requirement.

3.9 n. – N/A. This paragraph is not applicable to this requirement.

3.11 Replace paragraph with the following:

Each container will be accompanied by an installation instructions bonded to the outer wall of the container cover. The instruction will be waterproof. Instructions will include a step-by-step procedure for installing and removing the contained item, including units of desiccant required. Torque values and torque sequence for mounting and closure hardware will be shown on the installation instructions when applicable.

4.5.3 – Replace paragraph with the following:

Drop Test: Each container will be subjected to the following drop tests at ambient temperatures.

4.5.3.1- Replace paragraph with the following:

Edgewise Drop Test: The loaded container shall be supported at one end of its base on a wood sill nominally six inches high, placed perpendicular to the skids. The opposite end of the container shall be raised and allowed to fall freely from heights of 6, 12, 18, 24, 30 and 36 inches successively to a concrete or similarly hard surface. Two drops shall be made from the 36 inch height. This test shall be applied to the other end of the container. If the size of the container and the location of the center of gravity are such that drop tests cannot be made from all of the prescribed heights, the greatest attainable height shall be repeated for a total of six drops.

4.5.3.2- Replace paragraph with the following:

Cornerwise Drop Test: The loaded container shall be supported at one corner of its base on a block nominally six inches high. A block nominally 12 inches high shall be placed under the other corner of the same end of the container. The opposite end of the container shall be raised and allowed to fall freely from heights of 6, 12, 18, 24, 30 and 36 inches successively (as measured from the lower of the two corners) to a concrete or similarly hard surface. Two drops shall be made from the 36 inch height. If the size of the container and the center of gravity are such that drop tests cannot be performed from all of the prescribed heights, the greatest attainable height shall be repeated for a total of six drops. This test shall be applied to diagonally opposite corners on each end of the container. If during the testing, the blocks shift more than six inches from the end of the skids, the blocks shall be repositioned at the ends of the skids.

4.5.3.3- N/A. This paragraph is not applicable to this requirement.

4.5.3.4 - Replace paragraph with the following:

Flatwise Drop Test: The container shall be raised in its normal storage position and allowed to fall freely from heights of 6 and 12 inches to land flat on a concrete or similarly hard surface. Container, 5 cubic feet to 25 cubic feet exterior volume, shall be dropped four times at each height. Containers 25 to 50 cubic feet shall be dropped twice from each height. Containers over 50 cubic feet shall be dropped once from each height.

4.5.4- Replace paragraph with the following:

Tipover Test: One of the following tests, whichever is applicable, shall be applied.

Roll-Over Test: This test applies to containers having a gross weight under 1,500 lbs. The container in normal storage position shall be rolled slowly sideways until it falls freely onto its side on a concrete or similarly hard surface. This procedure shall be repeated with a fall from one side to the top, from the top to the other side, and from the other side to the base. This test shall be applied to vertical cylindrical containers. In vertical cylindrical containers the component is mounted from one end with its longitudinal axis perpendicular to the base of the container.

Tip-Over Test: This test applies to containers having a width less than ¼ of the height and large containers with a gross weight over 1,500 lbs. The container in normal storage position on a hard level surface shall be slowly tipped to the one side until it falls freely to the ground. The container shall then be slowly tipped until it is back in the normal storage position. This test shall then be repeated to the other side of the container.

4.5.5 – N/A. This paragraph is not applicable to this requirement.

4.5.6 – Replace paragraph with the following:

Pendulum Impact Test: The container shall be suspended as a pendulum from four chains or cables (two chains or cables shall be used for cylindrical containers with two hoisting devices). The chains or cables shall be of sufficient length to provide a minimum distance of 16 feet from bottom of the container to point of suspension. The impact bumper shall be stationary and vertically flat and may be faced with a minimum nominal two inch thickness hardwood impact surface. The bumper impact surface shall be at least six inches high. The suspended container shall clear the floor or ground surface by two or three inches while swinging. The ends of the skids shall be the point of impact. The suspended container shall be pulled back perpendicularly from the bumper until a height of 18 inches or more than the floor clearance is reached. This measurement shall be taken vertically between a measuring reference point on the container and the floor or ground. The container shall be released to swing freely in a perpendicular line to strike the bumper. One impact shall be made on each end of the container.

4.5.7.1- Replace paragraph with the following:

Superimposed Load Resistance: One of the following tests, whichever is the greater load, shall be applied.

Concentrated Load Resistance: A simulated load equal to twice the weight of the container with its designated contents shall be stacked on top of the container. If the stacked height of three containers does not equal 16 feet, add additional weight until it stimulates containers stacked to a minimum height of 16 feet. Containers shall not be pressurized during this test. Measurements shall be taken to determine if permanent deformation has taken place.

Distributed Load Resistance: A load of 175 pounds per square feet shall be evenly distributed on the top surface of the container. This test shall not be applied to areas with curved or dome shaped cross-section. Containers shall not be pressurized during this test. Measurements shall be taken to determine if permanent deformation has taken place.

4.5.8.1 – Replace paragraph with the following:

Hoisting Test: The loaded container shall be suspended for at least two minutes clear of the ground (or other supports) by one of the hoisting provisions. The hoisting provision shall be capable of withstanding this test without failure or visible permanent deformation. This test shall be applied separately to each individual hoisting eye, ring, lug or bracket. Stationary hoisting devices shall not be positioned to extend beyond the maximum dimensions of the container. The same requirement applies to retractable hoisting devices when not in use.

4.5.8.3.2. – N/A. This paragraph is not applicable to this requirement.

Distribution A – Unlimited: Distribution Approved for Public Release

File details come from the government source that posted it. Updated .