MSV(L)_DRAFT_-_Production_Schedule.pdf

PDF 536 KB Posted

Attached to
Maneuver Support Vessel (Light) MSV-L Federal contract opportunity
Solicitation number
W56HZV15R0187
Issued by
Department of the Army Materiel Command Contracting Command Detroit Arsenal

View the file

Other files for this federal contract opportunity

Other files attached to Maneuver Support Vessel (Light) MSV-L, newest first.
File Type Posted
RFI_Q&As_02Dec2016.pdf PDF
Interested_Potential_Subcontractors_MSV(L)_26JULY16.pdf PDF
Interested_Potential_Subcontractors_MSV(L)_26JULY16.pdf PDF
Interested_Potential_Subcontractors_MSV(L)_20JULY16.pdf PDF
Interested_Potential_Prime_Contractors_MSV(L)_22JUNE16.pdf PDF
RFI_Maneuver_Support_Vessel_(MSV)_Light_(2016).pdf PDF
MSV(L)_DRAFT_-_SOW_Attachment_List.pdf PDF
MSV(L)_DRAFT_-_CDRL_List.pdf PDF
MSV(L)_DRAFT_-_Statement_of_Work_(SOW).pdf PDF
RFI_Maneuver_Support_Vessel_(MSV)_Light_(2016).pdf PDF
MSV(L)_DRAFT_-_CDRLs__A001_-_A100.pdf PDF
MSV(L)_DRAFT_-_Payload_Data_Table.pdf PDF
Industry_Day_Q As.pdf PDF
Instructions_for_Interested_Potential_PRIME_Contractors-MSV(L).xlsx XLSX spreadsheet
Instructions_for_Interested_Potential_SubC-MSV(L).xlsx XLSX spreadsheet
Industry_Day_Agenda.pdf PDF
NoticeMSV(L)-Revised_ATPD-Classified_Annex-Nov2015.docx DOCX document
Notice-MSV-L-FOUO-Instructions.docx DOCX document
DD_254_Continuation_Sheets_W56HZV-15-R-0187.pdf PDF
DD_254_MSV(L)_Solicitation_W56HZV-15-R-0187.pdf PDF
QA-MSVL-28Oct15.pdf PDF
Army_Watercraft_Systems_(AWS)_Industry_Day_Announcement.pdf PDF
NoticeMSV(L)-RFI-Sept2015.docx DOCX document
MSV(L)SpeedRFIQuestions-Aug2015.docx DOCX document
RFI-MSV-L.doc DOC document
NoticeMSV-L.docx DOCX document
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Draft Program Schedule

EMD Production Schedule

FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27

MSV(L) 0 0 1 0 2 2 4 6 8 8 6

LRIP vessels for PVT/FAT/Logistics

• Developmental

• User Test

• FRP

• Fielding starts

One Prototype for test

One (1) Prototype; four (4) LRIPs; 32 Production = 37 total Performance gates throughout acquisition

Production Schedule reflects AAO = 36 APO = 28 vessels

MSV(L) DRAFT - Production Schedule

MS B MS C

DRAFT

File details come from the government source that posted it. Updated .