Att_0015_PERFORMANCE_QUESTIONNAIRE.pdf
PDF 561 KB Posted
- Attached to
- NMS Draft Solicitation Announcement
- Solicitation number
- W56HZV15R0139
About this file
Draft
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFT
--------------------------------------------------------------------------------- UNCLASSIFIED --------------------------------------------------------------------------------- ------------------------------------------ DISTRIBUTION A: Approved for public release, distribution is unlimited-------------------------------------------
ATTACHMENT 0015
PAST PERFORMANCE QUESTIONNAIRE
AFGHAN NATIONAL MAINTENANCE STRATEGY
W56HZV-15-R-0139
1. GENERAL INSTRUCTIONS:
This information, when filled in, shall be treated as Source Selection Sensitive in accordance with FAR 3.104-3 and shall not be disclosed to anyone outside the Government Source Selection Team. Upon completion of this questionnaire, please forward it electronically to email address: usarmy.detroit.acc.mbx.wrn-nms-program@mail.mil.
2. DESCRIPTION OF THE CURRENT SOLICITATION:
This action procures training and mentoring to the Afghan National Defense Security Forces (ANDSF) at the management and maintainer levels in maintenance, supply chain management and warehouse supply support.
This effort also will provide Contractor Logistics Support (CLS) to the ANDSF, which includes maintenance, supply chain management and parts support for vehicles and ground equipment. Further, the contractor shall provide necessary security and basic life support services for its personnel during performance of this effort as United States (U.S.) and Coalition forces draw down.
Background: Currently, the ANDSF does not effectively manage accountability of its vehicles and ground equipment, nor does it have the necessary training and experience required to effectively and independently maintain and sustain its vehicles and ground equipment. Therefore, the ANDSF relies heavily on contractor and Coalition support to manage its maintenance, sustainment and supply systems. The planned effort provides targeted training at the management and maintainer levels to establish an ANDSF organic maintenance, sustainment, and supply capability. The services procured under this contract supplement and develop the ANSDF organic logistics support throughout the country to prevent an irreversible degradation in the operational capability of the ANDSF and reduce the risk of complete operational failure due to unavailability of vehicles and equipment.
3. INFORMATION ABOUT YOUR CONTRACT AND YOUR ADMINISTRATIVE ROLE:
a. Contractor:
b. Contract Number:
c. Contract Type (Firm Fixed Price; Cost Reimbursement; T&M):
d. Original Contract Value:
e. Current (final) Contract Value:
PAST PERFORMANCE QUESTIONNAIRE
AFGHAN NATIONAL MAINTENANCE STRATEGY
W56HZV-15-R-0139
--------------------------------------------------------------------------------- UNCLASSIFIED --------------------------------------------------------------------------------- ------------------------------------------ DISTRIBUTION A: Approved for public release, distribution is unlimited-------------------------------------------
f. Please mark with the tasks performed under your contract:
Past Performance Area
Provided training and mentoring on maintenance (L.4.1.1)
Provided training and mentoring on supply chain management (L.4.1.1)
Provided training and mentoring on warehouse support (L.4.1.1)
Provided Contractor Logistics Support (CLS) maintenance for vehicles and ground equipment (L.4.1.2)
Provided CLS warehouse support for vehicles and ground equipment (L.4.1.2).
Provided CLS supply chain management for vehicles and ground equipment (L.4.1.2).
The deployment and management of at least 50 individuals to Southwest Asia over a period of performance of at least one year (L.4.1.3).
Management included the following (L.4.1.3):
SPOT
JPAS
CVS
LOAs
AKO
CRC
AFGHAN NATIONAL MAINTENANCE STRATEGY
W56HZV-15-R-0139
--------------------------------------------------------------------------------- UNCLASSIFIED --------------------------------------------------------------------------------- ------------------------------------------ DISTRIBUTION A: Approved for public release, distribution is unlimited-------------------------------------------
g. Was this contract competitively awarded? .. Yes No
h. Was this a follow-on contract? .................. Yes No
i. Period of Performance:
j. Place of Performance:
k. Your Title (e.g. PCO, ACO, COR, etc) and period of involvement with the contract:
Title Period of Involvement
--------------------------------------------------------------------------------- UNCLASSIFIED --------------------------------------------------------------------------------- ------------------------------------------ DISTRIBUTION A: Approved for public release, distribution is unlimited-------------------------------------------
4. QUESTIONS:
4.1 Technical Performance
4.1.1. To what extent did the service provider satisfy requirements to provide training and mentoring on maintenance [Solicitation W56HZV-15-R-0139 Section L Paragraph L.4.1.1.2(a) and Section C Paragraph 3.1]
Please check one answer.
Excellent Performance - Objectives/requirements essentially always achieved or exceeded, with inconsequential exceptions
Good Performance - Objectives/requirements achieved with only rare exceptions, and the exceptions had minor consequences
Adequate Performance - Objectives/requirements generally achieved with occasional exceptions and, in almost all cases, exceptions had minor consequences
Marginal Performance - Objectives/requirements were frequently not fully achieved, often with significant consequences
Poor Performance - Objectives/requirements were not achieved, with significant consequences Too Soon to Tell Not Applicable
Comments:
4.1.1. To what extent did the service provider satisfy requirements to provide training and mentoring on supply chain management [Solicitation W56HZV-15-R-0139 Section L Paragraph L.4.1.1.2(a) and Section C Paragraph 3.1.
Please check one answer.
Excellent Performance - Objectives/requirements essentially always achieved or exceeded, with inconsequential exceptions
Good Performance - Objectives/requirements achieved with only rare exceptions, and the exceptions had minor consequences
Adequate Performance - Objectives/requirements generally achieved with occasional exceptions and, in almost all cases, exceptions had minor consequences
Marginal Performance - Objectives/requirements were frequently not fully achieved, often with significant consequences
Poor Performance - Objectives/requirements were not achieved, with significant consequences Too Soon to Tell
--------------------------------------------------------------------------------- UNCLASSIFIED --------------------------------------------------------------------------------- ------------------------------------------ DISTRIBUTION A: Approved for public release, distribution is unlimited-------------------------------------------
4.1.1. To what extent did the service provider satisfy requirements to provide training and mentoring on warehouse support? [Solicitation W56HZV-15-R-0139 Section L Paragraph L.4.1.1.2(a) and Section C Paragraph 3.1].
Please check one answer.
Excellent Performance - Objectives/requirements essentially always achieved or exceeded, with inconsequential exceptions
Good Performance - Objectives/requirements achieved with only rare exceptions, and the exceptions had minor consequences
Adequate Performance - Objectives/requirements generally achieved with occasional exceptions and, in almost all cases, exceptions had minor consequences
Marginal Performance - Objectives/requirements were frequently not fully achieved, often with significant consequences
Poor Performance - Objectives/requirements were not achieved, with significant consequences Too Soon to Tell
4.1.2. To what extent did the service provider satisfy requirements to provide Contractor Logistics Support (CLS) maintenance for vehicles and ground equipment [Solicitation W56HZV-15-R-0139 Section L Paragraph L.4.1.1.2(b) and Section C Paragraph 3.2]
Please check one answer.
Excellent Performance - Objectives/requirements essentially always achieved or exceeded, with inconsequential exceptions
Good Performance - Objectives/requirements achieved with only rare exceptions, and the exceptions had minor consequences
Adequate Performance - Objectives/requirements generally achieved with occasional exceptions and, in almost all cases, exceptions had minor consequences
Marginal Performance - Objectives/requirements were frequently not fully achieved, often with significant consequences
Poor Performance - Objectives/requirements were not achieved, with significant consequences Too Soon to Tell
--------------------------------------------------------------------------------- UNCLASSIFIED --------------------------------------------------------------------------------- ------------------------------------------ DISTRIBUTION A: Approved for public release, distribution is unlimited-------------------------------------------
4.1.2. To what extent did the service provider satisfy requirements to provide Contractor Logistics Support (CLS) supply chain management for vehicles and ground equipment? [Solicitation W56HZV-15-R-0139 Section L Paragraph L.4.1.1.2(b) and Section C Paragraph 3.2]
Please check one answer.
Excellent Performance - Objectives/requirements essentially always achieved or exceeded, with inconsequential exceptions
Good Performance - Objectives/requirements achieved with only rare exceptions, and the exceptions had minor consequences
Adequate Performance - Objectives/requirements generally achieved with occasional exceptions and, in almost all cases, exceptions had minor consequences
Marginal Performance - Objectives/requirements were frequently not fully achieved, often with significant consequences
Poor Performance - Objectives/requirements were not achieved, with significant consequences Too Soon to Tell
4.1.2. To what extent did the service provider satisfy requirements to provide Contractor Logistics Support (CLS) warehouse support for vehicles and ground equipment? [Solicitation W56HZV-15-R-0139 Section L Paragraph L.4.1.1.2(b) and Section C Paragraph 3.2]
Please check one answer.
Excellent Performance - Objectives/requirements essentially always achieved or exceeded, with inconsequential exceptions
Good Performance - Objectives/requirements achieved with only rare exceptions, and the exceptions had minor consequences
Adequate Performance - Objectives/requirements generally achieved with occasional exceptions and, in almost all cases, exceptions had minor consequences
Marginal Performance - Objectives/requirements were frequently not fully achieved, often with significant consequences
Poor Performance - Objectives/requirements were not achieved, with significant consequences Too Soon to Tell
--------------------------------------------------------------------------------- UNCLASSIFIED --------------------------------------------------------------------------------- ------------------------------------------ DISTRIBUTION A: Approved for public release, distribution is unlimited-------------------------------------------
4.1.3. To what extent did the service provider perform a service contract in Afghanistan that required simultaneous deployment and management of at least 50 individuals over a period of performance of at least one year? For this solicitation, 'management' includes utilization of SPOT, JPAS, CVS, LOAs, AKO and CRC in the planning and deployment of personnel. [Solicitation W56HZV-15-R-0139 Section L Paragraph L.4.1.1.2(c)]
Please check one answer.
Excellent Performance - Objectives/requirements essentially always achieved or exceeded, with inconsequential exceptions
Good Performance - Objectives/requirements achieved with only rare exceptions, and the exceptions had minor consequences
Adequate Performance - Objectives/requirements generally achieved with occasional exceptions and, in almost all cases, exceptions had minor consequences
Marginal Performance - Objectives/requirements were frequently not fully achieved, often with significant consequences
Poor Performance - Objectives/requirements were not achieved, with significant consequences Too Soon to Tell
4.2 Schedule Performance
1. To what extent did the service provider meet required performance schedules on an overall basis?
Please check one answer.
Excellent Performance - Objectives/requirements essentially always achieved or exceeded, with inconsequential exceptions
Good Performance - Objectives/requirements achieved with only rare exceptions, and the exceptions had minor consequences
Adequate Performance - Objectives/requirements generally achieved with occasional exceptions and, in almost all cases, exceptions had minor consequences
Marginal Performance - Objectives/requirements were frequently not fully achieved, often with significant consequences
Poor Performance - Objectives/requirements were not achieved, with significant consequences Too Soon to Tell
--------------------------------------------------------------------------------- UNCLASSIFIED --------------------------------------------------------------------------------- ------------------------------------------ DISTRIBUTION A: Approved for public release, distribution is unlimited-------------------------------------------
4.3 Cost Performance
1. To what extent did the contractor stay within cost estimates?
Please check one answer.
Excellent Performance - Objectives/requirements essentially always achieved or exceeded, with inconsequential exceptions
Good Performance - Objectives/requirements achieved with only rare exceptions, and the exceptions had minor consequences
Adequate Performance - Objectives/requirements generally achieved with occasional exceptions and, in almost all cases, exceptions had minor consequences
Marginal Performance - Objectives/requirements were frequently not fully achieved, often with significant consequences
Poor Performance - Objectives/requirements were not achieved, with significant consequences Too Soon to Tell
File details come from the government source that posted it. Updated .