Q and A- W564KV-24-R-0048.pdf

PDF 137 KB Posted

Attached to
Appliance Repair Services for US Army Garrisons in Germany
Solicitation number
W564KV-24-R-0048
Issued by

About this file

This document contains Questions and Answers regarding Solicitation #W564KV-24-R-0048 for Appliance Repair Services for US Army Garrisons in Germany. The solicitation requires the contractor to have ISO 9001:2015 certification, maintain repair parts in service vehicles to avoid return visits, and perform on-site repairs. Regarding past performance, the government cannot eliminate this requirement as it is part of the technical experience evaluation. The historical workload data provided covers the timeframe of October 2020 through May 2023 and includes both Army Family Housing (AFH) and Unaccompanied Personnel Housing (UPH) repairs. The repairs can range from simple tasks to extensive repairs. The solicitation has a proposal due date of September 20, 2024 at 12:00 PM Central European Summer Time and is being issued by the Department of the Army Materiel Command Army Contracting Command.

View the file

Other files

File Type Posted
PWS Attachment 14 Installations in Germany.xlsx XLSX spreadsheet
W564KV-24-R-0048 Amendment 0001.pdf PDF
PWS Attachment 01 Maximum Quantity WORKLOAD DATA GE.xlsx XLSX spreadsheet
PWS Attachment 02 HISTORICAL WORKLOAD DATA.xlsx XLSX spreadsheet
PWS Attachment 21 Issued Appliances - FHM and UHM GE.xlsx XLSX spreadsheet
PWS Attachment 06 Appropriation Classes.docx DOCX document
PWS Attachment 22 Daily Status Report.xls XLS spreadsheet
PWS Attachment 17 Listing of Service Codes and Repair Codes.docx DOCX document
PWS ATTACHMENT 03 MEL 2023.pdf PDF
W564KV-24-R-0048.pdf PDF
PWS Attachment 05 NAK.docx DOCX document
PWS Attachment 10 Parts for Cannibalization.xlsx XLSX spreadsheet
PWS Attachment 13 Emergency Phone Register GE.xlsx XLSX spreadsheet
PWS Attachment 18 eMH Barcode Label Sample.pdf PDF
PWS Attachment 15 Common Standard Item Parts.xlsx XLSX spreadsheet
PWS Attachment 21 Issued Appliances - FHM and UHM GE.xlsx XLSX spreadsheet
PWS ATTACHMENT 02 HISTORICAL WORKLOAD DATA.xlsx XLSX spreadsheet
PWS Attachment 04 Tools and Test Equipment in Service Vehicles.docx DOCX document
PWS Attachment 11 QASP APPLIANCE REPAIR CONTRACT GE.docx DOCX document
PWS Attachment 14 Installations in Germany and POCs.xlsx XLSX spreadsheet
PWS Attachment 12 Total Number of Appliances per Garrison GE.xlsx XLSX spreadsheet
PWS Attachment 20 Sample Work Order Report.xlsx XLSX spreadsheet
PWS ATTACHMENT 01 ESTIMATED WORKLOAD DATA GE.xlsx XLSX spreadsheet
PWS Attachment 07 Customer Questionnaire Card.xlsx XLSX spreadsheet
PWS Attachment 08 Gross Negligence letter.pdf PDF
PWS Attachment 16 Work Order Sample.pdf PDF
PWS Attachment 19 Age of appliances per Garrison in GE.xlsx XLSX spreadsheet
PWS Attachment 09 MLFB Listing.xlsx XLSX spreadsheet
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers

Solicitation #W564KV-24-R-0048

4 September 2024

1. Question: Regarding past performance, we do not have the exact past performance requested in our company, however, we plan to use our network of technicians and repair companies to perform in this job. We have supplied IMCOM E with spare parts for their needs in the past. We have bid on this project in the past. Is there any way to eliminate this requirement as it would prevent us from bidding on this requirement?

Answer: No. The U.S. Government cannot eliminate this requirement as it’s part of the Technical Factor-Technical Experience as referenced in the addendum to provision 52.212-2 in the solicitation.

2. Question: Regarding certifications, our ISO 9001:2015 certificate was valid until 06 OCT 2023, is this certificate still acceptable for you? The methods and structures developed to get this certification are still in use, therefore we have skipped to redo it for now as it would not develop our company any further rather than just being a financial burden. If necessary and in case of an award, we will redo the certification and submit a new and valid ISO certificate.

Answer: There’s no requirement to submit the ISO 9001:2015 certificate before contract award. See PWS para. 1.5.2 which states “The contractor shall be responsible for internal Quality Control (QC) that ensures satisfactory performance of this contract. The contractor shall maintain an ISO 9001:2015 certification for the duration of the contract.

The contractor shall provide this certificate to the KO, Quality Assurance (QA) Specialist and the COR within five (5) working days after contract award (Deliverable A002).”

3. Question: Attachment 2 shows the historical workload, but apparently only for 1 year for AFH. Can we please get the Historical Workload of the last 4 years with AFH and

UPH?

Answer: The number of repairs is an average of actual repairs during the timeframe of October 20 thru May 2023. The number of repairs contains both AFH and UPH.

4. Question: Regarding attachment #2, can we have a list of what type of work falls under the heading “repairs at customer “? Please elaborate further on what actually has been performed at the customers home.

Answer: According to PWS paragraphs 5.72, 5.73 and 5.7.4, “ The contractor shall complete all repairs, as much as possible on site during the first visit at the customer’s home or at troop buildings, to include safety checks. At all times, the contractor shall have the needed repair parts in the service vehicle, there should be no return visit at the customer due to lack of repair parts. Deficiencies will be tracked through the PRS checklist.”

The repairs vary from 5 min jobs (cleaning lint filters, emptying condensers, etc.) to extensive repairs (drum bearing, heating element, motor exchange, etc.).

File details come from the government source that posted it. Updated .