Title: Replacement of Area Lighting System

Period of Performance: Completion w ithin 90 days after receiving the "Notice to Proceed"

This Acquisition is unrestricted. This is not a sealed bid. No public offering w ill be held.

There w ill be no site visit for this requirment. All of ferors interested in providing a proposal should email the Contract Specialist Rebecca Hamrick, rebecca.k.hamrick.civ@mail.mil, and Contracting Officer, Mary Harding at mary.j.harding8.civ@mail.mil for site pictures.

All proposals must be electronically submitted to the Contract Specialist and Contracting Officer by 12:00PM, Central European Time (CET), 21 September 2015.

REBECCA K HAMRICK 483-5552

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

12-Sep-2015

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______15 calendar days and complete it w ithin ________90 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES X NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________0 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________21 Sep 2015 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All of fers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

TCC-KAISERSLAUTERN

KLEBER KASERNE MANNHEIMER STRASSE 238

BLDG 3233

67657 KAISERSLAUTERN

GERMANY

W564KV

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

12:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W564KV-15-R-0024 31

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specified below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W564KV-15-R-0024

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Replacement of Area Lighting System

FFP

Contractor shall provide all labor, management, transportation, materials and equipment necessary to replace the Area Lighting System in accordance with the Statement of Work.

FOB: Destination

PURCHASE REQUEST NUMBER: 0010750183-0001

NET AMT

Section C - Descriptions and Specifications

STATEMENT OF WORK

1.1 LOCATION AND BACK GROUND

The site of work under this project is Har Karen, Negev Desert, Israel.

1.2 SCOPE OF WORK

The work to be performed under this contract consist of furnishing all labor, material and equipment and performing all work in strict accordance with application plans and specifications.

1.3 DESCRIPTION OF WORK

This contract is for the replacement of the Area Lighting System (ALS), work will be performed with limited interruption of the existing ALS functions and with limited interruptions of the normal site operations. The concept is to place a new pole as close as possible to the wooden pole being replaced, this allows for connecting the new pole to the same location in the ALS network. During the connection of the steel pole to the ALS it is acceptable to remove the wood pole from the ALS to permit utilization of the existing power conductors. Once the new steel pole is connected, then the wood pole can be disposed of. Underground cabling is not required unless the contractor damages the existing underground network or other cabling. Installation is to be complete within 90 days of execution. If additional time is need due to concrete curing it will be annotated in contractor proposal. The contractor will have a fluent English speaker on site, but may have a limited level English speaker on site if a fluent English speaker is readily available by phone.

Specifications:

1. Install 18 new poles rated for local wind max gusts and continuous wind load plus 20%. Poles must also be rated for local environment conditions such as but not limited to temperature, soil conditions, solar exposure and seismic activity.

2. Top of pole, including foundations, will be minimal of 8.2m, but no more than 8.5m from ground level.

3. The new poles will allow for the attachment of the existing ALS light fixture mounting cross arm at a point

0.6m from the top of the pole. Photos of cross arm are available upon request. Note the pole mounting brace is 12.8 cm diameter.

4. New poles will be placed as close as possible to existing wood poles, but not further then 2m centered.

5. Special care to avoid underground cables or water lines will be taken. This will require use of cable and or metal detection equipment.

6. In the case that the existing underground cabling is damaged by the contractor, the contractor will repair by way of proper COR approved splicing techniques.

7. The bond between the new steel pole and the existing grounding grid will be exothermically welded or bolted using appropriate bolts, clamps and or terminations that are required for connections between the copper ground cables. If mechanical bonding is used it must be exposed so that it may be inspected by the government.

8. Once the replacement pole is connected to the ALS grid the old wood pole will be removed.

9. Old wood poles can be ether cut off at ground level or pulled from ground if done so without effecting surrounding facilities or underground cables or pipes. Any damages and or filling/compacting of holes will be the responsibility of contractor.

10. Disposal of old wool poles will be the responsibility of contractor.

11. Steel poles and all mounting hardware will be corrosion resistant and or will be treated with appropriate corrosion inhibitors. Ground bonds will not be painted, but will be treated if need be.

12. Base/Foundation design and or materials. The base or foundation must be able to support pole or tower and be able to be inspected in that catastrophic failure or deterioration of pole can be identified and or mitigated.

13. Direct burial of an appropriate portion of pole can be an option if longevity and detection of pending failure of pole can be adequately illustrated.

14. Additional conditions:

a. Four wood ALS poles have fallen, these and any other additional fallen ALS wood poles will be treated the same as a pole still standing. Disposal remains the responsibility of contractor.

b. Two ALS existing wood poles also support low voltage cable less than 4cm in diameter. During the removal of these two poles the contractor will carefully remove the support of cable and assist in the attachment of the cable to the replacement pole. The contractor will only give lift support for the attachment of the low voltage cable to the new steel pole. No materials or design is required. Photos available upon request.

c. Three existing ALS poles are in or next to concrete. Two replacement poles are able to be placed just off the concrete. One pole will need to be replaced in concrete. Photos available upon request.

15. The contractor will provide and install a 4 pole Manual Transfer Switch (MTS) inline and ahead of the 100 amp main breaker of the 400vac 50 Hz compound area main panel located just inside the US access control point. The MTS will be in a weatherized dust and drip proof outdoor metal enclosure to be mounted to the side of the existing compound area main panel. The operation of the MTS can be performed without opening of the MTS enclosure. The MTS will facilitate the connection of a backup generator to be installed and connected by others. While the contractor is not the installer of the backup generator or the cabling to the backup generator, the new MTS will allow for the connection of a 5x50mm2 power cable and the MTS enclosure will have the cable access gland for the later installation of a 5x50 mm2 power cable. See attached one line diagram.

16. The contractor will transfer over the light fixtures of the remaining standing ALS pole (14 currently) with mounting cross arms to new ALS poles. Photos available upon request.

17. The contractor will transfer over the cross arms of the 4 fallen ALS poles to the new The ALS poles.

18. The contractor will install new light fixture replacements for the 4 fallen ALS poles. New light fixtures will be the same or as close as possible to the existing light fixtures. Photos available upon request.

19. The contractor will install a new connection and light fixture breaker pole panel on each ALS pole on each pole.

a. Panel cabinet will have and be installed to a minimal of IP54 enclosure rating.

b. The panel cabinet will have an IP54 panel cover that allows easy of access to light fixture circuit breakers but does not expose power connection bus when opened.

c. All cables in will be at the bottom or low on the sides of cabinet and use cable glands that will maintain IP 54 rating of cabinet.

d. Each pole panel will have a connection bus to allow for a 5 wire 16mm2 (3 phases, Neutral and a ground) power feed in and 5 wire 16mm2 ( 3 phases, Neutral and a ground) power feed out and tap to support for 4 each C16 two pole breaker. One for each light fixture. Photos available upon request. The configuration will have two phases having one light fixture and one will have two light fixtures. The phase with two light fixtures will be rotated between light poles. Thus giving relative phase balance for each ALS circuit.

e. New pole panel will be mounted 1 to 1.5 m above ground level, but can be mounted lower if existing power cable is to short.

f. The contractor will install a 2.5mm2 single phase circuit from new pole panel up the pole to each light fixture. 2.5 mm2 cables will be rated for full exposure.

g. The contractor will connect in the existing 5 wire 16mm2 light circuit power cable. This connection will have one in a one out except for the last pole on that circuit.

h. There may be one ALS pole panel that may have a requirement for one 5x16mm2 cable in and two 5x16mm2 cable out.

20. The ALS has three separate 32 amp circuits. ALS connection currently connected to and on existing wood poles can be transferred to replacement steel poles by section.

21. All 16mm2 cables in and out of pole panel cabinets will be protected by conduit in and out till at lease ground level.

22. The cabling between pole panel cabinet and the light fixtures will be protected in conduit to the level of the fixture cross arm.

23. The locations for the new pole sites will be tested with a cable and or metal detection equipment to verify the absence of ether cables of other below surface facilities and then the site will be approved by Site Command staff with coordination with tenant site organizations.

24. The acceptance testing will be in accordance with IEC and host nation, but at a minimal will include loop impedance tests of line, neutral and ground circuits, insulation test of all conductors after insulation, but before connection to light fixtures and installed functional test of light fixtures. These tests will be documented as well as with type and calibration dates noted for test devices. All tests will be performed in the presence of a United States Government representative.

Estimates of Required Resources

a. 33 meters of conduit for 5X16mm2 cable with mounting braces. (Protections for existing power cable between ground and new pole panels.

b. 540 meters of 3X2.5mm2 light fixture circuits between pole panels and fixtures.

c. 135 meters of conduit for four each runs of 3x2.5mm2 with mounting braces (protection for b.

above)

d. 18 new pole panels in IP54 enclosures

i. With two each 5X16mm2 power cables and four each 2.5mm2 single phase circuit buses

ii. 4 two pole C16 mini breakers

iii. Limited breaker access cover.

e. 33 each cable glands for 5X16mm2 power cables

f. 72 each cable glands for 3x2.5 mm2 cables (item b above)

g. 16 each replacement light fixtures. (see data plate photo)

1.4 HOURS OF WORK: Normal hours of work shall be between 0700 and 1700, Sunday through Thursday.

Only for special conditions existing during the contract will work be permitted during nights, Fridays and Saturdays, or holidays. The contractor must submit for approval to the Contracting Officer a written request to work other than normal duty hours.

1.5 COORDINATION

The Contractor shall coordinate his work operations with Contracting Officer Representative. No work shall proceed without proper coordination with the Government Representative. Prior to completion of the project, the Contractor shall notify the Government Representative in time to allow the scheduling of a date for final inspection.

1.6 PERFORMANCE OF WORK

Work shall be accomplished in an efficient manner to minimize the time frame required to complete the project. All work including punch list items and cleanup must be completed and accepted by the contracting officer within the contract time period. Care shall be exercised to prevent damage to government property in or near the work sites.

Dust and/or debris shall be positively controlled at all times. Any damages to government property shall be repaired or replaced by the Contractor at his expense and within the time period of the project.

1.7 SAFETY REQUIREMENTS

The Contractor is advised that he will be expected to comply with all OSHA and Host National Standards

1.8 DISCONNECTION OF UTILITIES

The Contracting Officer shall be notified in writing at least five working days prior to any disconnection of utilities.

At no time during the performance of this contract shall the Contractor disrupt any utilities without prior written approval of the Contracting Officer.

Utility outages, effecting areas larger than the area of work currently under the Contractor’s control, shall not be permitted except when the work would be impossible to safely perform.

1.9 ACCIDENT REPORTS

The Contractor shall promptly report all accidents resulting in property damage and/or personal injury or death directly to the Government Representative.

1.10 CONTRACTOR FURNISHED MATERIAL AND/OR EQUIPMENT

The Contractor shall be responsible for furnishing all material and/or equipment required to perform all work outlined in this contract unless specifically stated as government furnished material or equipment.

1.11 STORAGE AND PROTECTION OF MATERIALS

It shall be the responsibility of the contractor to furnish storage for and protection of all materials and equipment used in conjunction with this project until the project is accepted by the Government. The Government will furnish an open unprotected area (such as in parking lot) where the contractor can store materials upon approval from Government representative. Any materials delivered to the site by other than the Contractor will not be accepted by Government personnel.

1.12 HEALTH REQUIREMENTS

The Contractor shall be responsible for insuring the healthy work place for his employees and surrounding government employees. The Contractor shall conduct a walk through inspection of the work site to determine if any hazardous chemicals are present and if necessary perform testing to verify the presence of hazardous compounds. If hazardous compounds are present, the Contractor shall be responsible for eliminating them prior to start of work.

The Contractor shall comply with the Construction Standards (29 CFR 1926) and General Industry Standards (29

CFR 1910).

1.13 ENVIRONMENTAL PROTECTION

The Contractor shall be responsible for complying with all environmental protection regulations. Any hazardous materials used by the Contractor in performing this contract shall be properly packaged and stored in a sealed container to avoid spills, and shall be promptly removed off post upon completion of the contract. All spills of hazardous materials shall be reported immediately to the Contracting Officer and shall be cleaned up immediately by the contractor at his own expense in accordance with local policy. The Government shall have the right to sample and test any equipment which spills fluid within the installation. If determined necessary by the Government Environmental Safety Team then the contaminated area shall be excavated, refilled, repaired and restored to the original conditions by the Contractor. Clean up wastes shall be disposed of by the Contractor as hazardous wastes in accordance with local policies.

1.14 HAZARDOUS WASTES HANDLING

The Contractor shall not store any hazardous waste in this installation without obtaining prior permission and related instructions from the Contacting Officer. Hazardous wastes shall be moved off post and disposed as they are generated. In no case shall the wastes remain on the installation after completion of this work. It is the Contractor’s responsibility to comply with local regulations concerning hazardous waste generation, storage, treatment and disposal.

1.15 SIGNAGE

The contractor shall post signs to indicate conditions and restriction in and around the work site. Signs shall be posted and visibility from all approaches to the work site.

1.16 POINT OF CONTACT

Name: To be determined upon award Job Title:

Contact info:

1.17 Contractors Proposals at a minimum will give details of the following:

a. Replacement pole type (steel poles, fiberglass, mini towers and even treated wood as long as use meets requirements of load bearing, durability and longevity).

b. Base/Foundation design and or materials. The base or foundation must be able to support pole or tower and be able to be inspected in that catastrophic failure or deterioration of pole can be identified and or mitigated.

c. Details on the manufactures installation requirements and recommendations. Any local code requirements will be presented and addressed if requirements are not covered in the IEC or manufacture's guidance.

d. Pole to foundation mounting.

e. Details and relative calculations and/or manufacture’s data on how the new pole and installations techniques will meet local wind load.

f. Ground Bonding.

g. Removal of old wood poles and broken ALS equipment.

h. Details of corrosion resistance, inhibitors or other treatments.

i. List of new materials to be purchased to replace broken materials on existing ALS.

j. Time table.

k. Performance methodology.

l. Drawing: The contractor will show a drawing of the standard pole wiring configuration from the

5x16mm2 existing power connection to the light fixtures. The drawing should clearly show the 5X16mm2 connection and feed thru bus, the distribution connection and light circuit pole mounted panel box and the circuits up the pole to include light fixture connections.

Section I - Contract Clauses

CLAUSES

ANTITERRORISM 5152.209-4000

5152.209-4000 DOD LEVEL I ANTITERRORISM (AT) STANDARDS (FEB 2009)

(a) Pursuant to Department of Defense Instruction Number 2000.16, “DoD Antiterrorism (AT) Standards,” dated October 2, 2006, each contractor employee requiring access to a Federally-controlled installation, facility and/or Federally-controlled information system(s) shall complete Level I AT Awareness Training on an annual basis and receive a certificate of completion. The training is accessible from any computer and is available at https://atlevel1.dtic.mil/at/. The contractor is responsible for ensuring that all applicable employees have completed antiterrorism awareness training and shall certify that their workforce has completed the training through the submission of completion certificate(s) to the Contracting Officer and the Contracting Officer’s Representative (if appointed) within five working days after contract award or prior to access to a Federally-controlled installation or information system.

(b) In the event that the automated system at https://atlevel1.dtic.mil/at/ is not available (e.g., server problems), Level I AT Awareness Training can be provided by a qualified instructor. However, if the training is not completed online, the Level I AT Awareness Instructor qualification must be coordinated with the Installation Antiterrorism Officer (or Installation Security equivalent) and the resultant name(s) of approved instructors shall be provided the contracting officer or designee along with all associated cost or schedule impacts to the contract.

(c) Antiterrorism performance (Level I AT Awareness Training attendance and compliance) may be documented as a performance metric under the resultant contract, and be part of past performance information in support of future source selections.

(End of clause)

LEGAL HOLIDAYS

The following Federal legal holidays are observed by this installation:

New Year's Day 1 January Martin Luther King's Birthday Third Monday in January President's Day Third Monday in February Memorial Day Last Monday in May Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December

MAGNITUDE OF PROJECT

The magnitude of this project is:

( ) Less than $25,000 ( ) Between $25,000 and $100,000.

( X ) Between $100,000 and $250,000.

( ) Between $250,000 and $500,000.

( ) Between $500,000 and $1,000,000.

( ) Between $1,000,000 and $5,000,000.

( ) Between $5,000,000 and $10,000,000.

( ) More than $10,000,000.

52.215-1 ADDENDUM

INSTRUCTIONS TO OFFERORS

A. Proposal Submittal and Inquiries.

1. Proposals shall be submitted electronically and prior to the closing date and time identified on the SF 1442.

2. The point of contact responsible for answering all inquiries is the Contracting Officer via the Contract

Specialist. Address all questions or concerns to the Contract Specialist, Rebecca Hamrick, rebecca.k.hamrick.civ@mail.mil and Contracting Officer, Mary Harding, mary.j.harding8.civ@mail.mil. All questions regarding this solicitation shall be submitted in writing via email.

B. General Instructions

1. Offers will be evaluated using the criteria under “Basis for Award.” and in accordance with FAR Part 13, Simplified Acquisition Procedures. Noncompliance with the Request for Proposal (RFP) requirements may hamper the Government's ability to properly evaluate the proposal and may result in elimination of the proposal from further consideration for contract award.

2. The Offer. The submission of the documentation specified below will constitute the Offeror's acceptance of the terms and conditions of the RFP, concurrence with the Statement of Work, and contract type.

C. Proposal Preparation Instructions – Proposal Content

1. Proposal Content: Solicitation, Offer and Award - The SF 1442 shall be submitted fully completed. The offeror is cautioned that the SF 1442 must contain an original signature in block 20 of the form. The contractor shall acknowledge any amendments to the RFP in accordance with the instructions on the SF 1442. The offeror shall provide the name, title and telephone number of the company/division point of contact regarding decisions made with respect to your proposal and who can obligate your company contractually.

Mission Capability: Mission Capability shall be clear, concise, and include sufficient detail for effective evaluation and for substantiating the validity of stated claims in the Offeror’s proposal. The proposal should not simply rephrase or restate the Government's requirements, but rather shall provide convincing rationale to address how the offeror intends to meet these requirements. Statements that the offeror understands, can, or will comply with the Statement of Work (SOW) (including referenced publications, technical data, etc.); statements paraphrasing the SOW or parts thereof (including applicable publications, technical data, etc.); and phrases such as “standard procedures will be employed” or “well known techniques will be used,” etc., will be considered unacceptable.

Proposals at a minimum will give details of the following as discussed in the SOW, section 1.17:

a. Replacement pole type (steel poles, fiberglass, mini towers and even treated wood as long as use meets requirements of load bearing, durability and longevity).

b. Base/Foundation design and or materials. The base or foundation must be able to support pole or tower and be able to be inspected in that catastrophic failure or deterioration of pole can be identified and or mitigated.

c. Details on the manufactures installation requirements and recommendations. Any local code requirements will be presented and addressed if requirements are not covered in the IEC or manufacture's guidance.

d. Pole to foundation mounting.

e. Details and relative calculations and/or manufacture’s data on how the new pole and installations techniques will meet local wind load.

f. Ground Bonding.

g. Removal of old wood poles and broken ALS equipment.

h. Details of corrosion resistance, inhibitors or other treatments.

i. List of new materials to be purchased to replace broken materials on existing ALS.

j. Time table.

k. Performance methodology.

l. Drawing: The contractor will show a drawing of the standard pole wiring configuration from the 5x16mm2 existing power connection to the light fixtures. The drawing should clearly show the

5X16mm2 connection and feed thru bus, the distribution connection and light circuit pole mounted panel box and the circuits up the pole to include light fixture connections.

2. Past Performance: The Past Performance evaluation will be accomplished by reviewing aspects of an

Offeror's recent and relevant Past Performance within the last 3 years. The offeror shall include documentation regarding their relevant past performance as it directly relates to the work being procured under this solicitation.

BASIS OF AWARD-EVALUATION

A. Basis for Award

1. This acquisition will be evaluated as Lowest Price Technically Acceptable (LPTA).

B. Award for all of the work

1. The Government intends to award one (1) contract as a result of this solicitation.

C. Evaluation Criteria

1. Evaluation criteria consist of factors. The proposals will be evaluated under three (3) evaluation factors:

Mission Capability, Past Performance, and Price.

Factor 1: Mission Capability Factor 2: Past Performance Factor 3: Price

a. Factor 1 - Mission Capability. The Mission Capability evaluation provides an assessment of the offeror’s capability to satisfy the Government’s requirements. The offeror’s proposal shall demonstrate a clear understanding of the nature and scope of the work specified in the SOW.

Mission Capability Acceptable: Proposal clearly meets the minimum requirements of the solicitation.

Unacceptable: Proposal does not clearly meet the minimum requirements of the solicitation.

b. Factor 2 - Past Performance. The Past Performance evaluation will assess the Offeror’s probability of meeting the solicitation’s requirements as indicated by the recency and relevancy of the previous contracts/ projects.

To be recent, the effort must be ongoing or must have been performed during the past 3 years from the date of issuance of this solicitation. To be relevant, the effort must be similar in nature of work, size, and complexity.

Past Performance Acceptable: Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown.

Unacceptable: Based on the offeror’s performance record, the Government has no reasonable expectation that the offeror will be able to successfully perform the required effort.

c. Factor 3 - Price. Price will not be scored or rated.

Definitions.

Reasonableness. A price is reasonable if, in its nature and amount, it does not exceed that which would be incurred by a prudent person in the conduct of competitive business.

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management JUL 2013 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards

JUL 2013

52.204-13 System for Award Management Maintenance JUL 2013

52.204-19 Incorporation by Reference of Representations and Certifications.

DEC 2014

52.209-2 Prohibition on Contracting with Inverted Domestic Corporations--Representation

DEC 2014

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment

AUG 2013

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations

DEC 2014

52.213-4 Terms and Conditions--Simplified Acquisitions (Other Than Commercial Items)

MAY 2015

52.222-50 Combating Trafficking in Persons MAR 2015 52.223-18 Encouraging Contractor Policies To Ban Text Messaging

While Driving

AUG 2011

52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.225-14 Inconsistency Between English Version And Translation Of

Contract

FEB 2000

52.225-20 Prohibition on Conducting Restricted Business Operations in Sudan--Certification

AUG 2009

52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-- Representation and Certifications.

DEC 2012

52.228-3 Worker's Compensation Insurance (Defense Base Act) JUL 2014 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-18 Availability Of Funds APR 1984 52.232-27 Prompt Payment for Construction Contracts MAY 2014 52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

JUL 2013

52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-2 Differing Site Conditions APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

APR 1984

52.236-10 Operations and Storage Areas APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984 52.236-15 Schedules for Construction Contracts APR 1984 52.236-26 Preconstruction Conference FEB 1995 52.236-28 Preparation of Proposals--Construction OCT 1997 52.242-14 Suspension of Work APR 1984 52.243-5 Changes and Changed Conditions APR 1984 52.246-12 Inspection of Construction AUG 1996 52.249-1 Termination For Convenience Of The Government (Fixed

Price) (Short Form)

APR 1984

52.249-10 Default (Fixed-Price Construction) APR 1984 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013

252.203-7005 Representation Relating to Compensation of Former DoD Officials

NOV 2011

252.204-7000 Disclosure Of Information AUG 2013 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Alt A System for Award Management Alternate A FEB 2014 252.204-7006 Billing Instructions OCT 2005 252.204-7012 Safeguarding of Unclassified Controlled Technical

Information

NOV 2013

252.222-7002 Compliance With Local Labor Laws (Overseas) JUN 1997 252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or

Hazardous Materials

SEP 2014

252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.225-7031 Secondary Arab Boycott Of Israel JUN 2005 252.225-7041 Correspondence in English JUN 1997 252.225-7042 Authorization to Perform APR 2003 252.225-7048 Export-Controlled Items JUN 2013 252.229-7000 Invoices Exclusive of Taxes or Duties JUN 1997 252.232-7008 Assignment of Claims (Overseas) JUN 1997 252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.244-7000 Subcontracts for Commercial Items JUN 2013 252.246-7003 Notification of Potential Safety Issues JUN 2013 252.246-7004 Safety of Facilities, Infrastructure, and Equipment for

Military Operations

OCT 2010

252.247-7023 Transportation of Supplies by Sea APR 2014

CLAUSES INCORPORATED BY FULL TEXT

52.202-1 DEFINITIONS (NOV 2013)

When a solicitation provision or contract clause uses a word or term that is defined in the Federal Acquisition Regulation (FAR), the word or term has the same meaning as the definition in FAR 2.101 in effect at the time the solicitation was issued, unless--

(a) The solicitation, or amended solicitation, provides a different definition;

(b) The contracting parties agree to a different definition;

(c) The part, subpart, or section of the FAR where the provision or clause is prescribed provides a different meaning;

or

(d) The word or term is defined in FAR Part 31, for use in the cost principles and procedures.

52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 238210.

(2) The small business size standard is N/A.

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204-7 is not included in this solicitation, and the offeror is currently registered in System for Award Management (SAM), and has completed the Representations and Certifications section of SAM electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:

( ) Paragraph (d) applies.

( ) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c) (1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.

(iii) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.

(iv) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(v) 52.209-2; Prohibition on Contracting with Inverted Domestic Corporations--Representation.

(vi) 52.209-5; Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(vii) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.

(viii) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(ix) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.

(x) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.

(xi) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xii) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xiii) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.

(xiv) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

(xv) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA- designated items.

(xvi) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.

(xvii) 52.225-4, Buy American--Free Trade Agreements--Israeli Trade Act Certificate. (Basic, Alternates I, II, and III.) This provision applies to solicitations containing the clause at 52.225- 3.

(A) If the acquisition value is less than $25,000, the basic provision applies.

(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.

(C) If the acquisition value is $50,000 or more but is less than $79,507, the provision with its Alternate II applies.

(D) If the acquisition value is $79,507 or more but is less than $100,000, the provision with its Alternate III applies.

(xviii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.

(xix) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan--Certification. This provision applies to all solicitations.

(xx) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran—Representation and Certification. This provision applies to all solicitations.

(xxi) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.

(2) The following certifications are applicable as indicated by the Contracting Officer:

[Contracting Officer check as appropriate.]

(i) 52.204-17, Ownership or Control of Offeror.

X (ii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.

(iii) 52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Certification.

(iv) 52.222-52 Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Certification.

(v) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA- Designated Products (Alternate I only).

(vi) 52.227-6, Royalty Information.

(A) Basic.

(B) Alternate I.

(vii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.

(d) The offeror has completed the annual representations and certifications electronically via the SAM website accessed through https://www.acquisition.gov. After reviewing the SAM database information, the offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [offeror to insert changes, identifying change by clause number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.

FAR Clause Title Date Change

Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on SAM.

(End of provision)

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 90 days. The time stated for completion shall include final cleanup of the premises.

52.215-1 INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (JAN 2004)

(a) Definitions. As used in this provision--

“Discussions” are negotiations that occur after establishment of the competitive range that may, at the Contracting Officer's discretion, result in the offeror being allowed to revise its proposal.

“In writing or written” means any worded or numbered expression which can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.

“Proposal modification” is a change made to a proposal before the solicitation's closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.

“Proposal revision” is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.

“Time”, if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.

(b) Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).

(c) Submission, modification, revision, and withdrawal of proposals. (1) Unless other methods (e.g., electronic commerce or facsimile) are permitted in the solicitation, proposals and modifications to proposals shall be submitted in paper media in sealed envelopes or packages (i) addressed to the office specified in the solicitation, and (ii) showing the time and date specified for receipt, the solicitation number, and the name and address of the offeror.

Offerors using commercial carriers should ensure that the proposal is marked on the outermost wrapper with the information in paragraphs (c)(1)(i) and (c)(1)(ii) of this provision.

(2) The first page of the proposal must show--

(i) The solicitation number;

(ii) The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);

(iii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;

(iv) Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror's behalf with the Government in connection with this solicitation; and

(v) Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office.

(3) Submission, modification, or revision, of proposals.

(i) Offerors are responsible for submitting proposals, and any modifications, or revisions, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that proposal or revision is due.

(ii)(A) Any proposal, modification, or revision received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and--

(1) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals; or

(2) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt of offers; or

(3) It is the only proposal received.

(B) However, a late modification of an otherwise successful proposal that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.

(iii) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the proposal wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.

(iv) If an emergency or unanticipated event interrupts normal Government processes so that proposals cannot be received at the office designated for receipt of proposals by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation, the time specified for receipt of proposals will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.

(v) Proposals may be withdrawn by written notice received at any time before award. Oral proposals in response to oral solicitations may be withdrawn orally.