0010750183-0001 Replace Lighting Sys

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Replacement of Area Lighting System in Har Karen, Israel

The closing date of this RFP (due date of proposals) is extended to 5:00 p.m. Central European Time (CET) on 23 September 2015 due to changes made to the solicitation.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 19

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Sep-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W564KV-15-R-0024

X 9B. DATED (SEE ITEM 11)

12-Sep-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Sep-2015

CODE

TCC-KAISERSLAUTERN

KLEBER KASERNE MANNHEIMER STRASSE 238

BLDG 3233

67657 KAISERSLAUTERN

GERMANY

W564KV 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W564KV-15-R-0024

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The offer guarantee has changed from is required to is not required.

The required response date/time has changed from 21-Sep-2015 12:00 PM to 23-Sep-

2015 05:00 PM.

The Issued By organization has changed from

TCC-KAISERSLAUTERN

KO DIRECTORATE OF CONTRACTING

UNIT 23156

09054 APO

UNITED STATES (THE)

to

TCC-KAISERSLAUTERN

KLEBER KASERNE MANNHEIMER STRASSE 238

BLDG 3233

67657 KAISERSLAUTERN

GERMANY

The offeror acceptance period has increased by 30 from 60 to 90.

The number of offeror copies required has increased by 1 from 0 to 1.

The performance period code has changed from Mandatory to Negotiable.

The required performance has changed from Title: Replacement of Area Lighting SystemPeriod of Performance: Completion within 90 days after receiving the "Notice to Proceed"This Acquisition is unrestricted. This is not a sealed bid. No public offering w ill be held.There will be no site visit for this requirment. All offerors interested in providing a proposal should email the Contract Specialist Rebecca Hamrick, rebecca.k.hamrick.civ@mail.mil, and Contracting Officer, Mary Harding at mary.j.harding8.civ@mail.mil for site pictures. All proposals must be electronically submitted to the Contract Specialist and Contracting Officer by 12:00PM, Central European Time (CET), 21 September 2015. to Title: Replacement of Area Lighting System in Har Karen, IsraelPeriod of Performance: Contract completion within 90 days after receiving the "Notice to Proceed".This Acquisition is unrestricted. This is not a sealed bid.

No public offering will be held. There will be no site visit for this requirement. All offerors interested in providing a proposal should email the Contract Specialist Rebecca Hamrick, rebecca.k.hamrick.civ@mail.mil, and Contracting Officer, Mary Harding at mary.j.harding8.civ@mail.mil for site pictures. All proposals must be electronically submitted to the Contract Specialist and Contracting Officer by 5:00PM, Central European Time (CET), 23 September 2015..

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from:

Contractor shall provide all labor, management, transportation, materials andequipment necessary to replace the Area Lighting System in accordance with the Statement of Work.

To:

Contractor shall provide all labor, materials, tools, equipment, management, transportation, quality control, supervision and associated services necessary to replace the Area Lighting System in accordance with the Statement of Work herein. Price offer should be in Israeli Shekels..

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

STATEMENT OF WORK

1.1 LOCATION AND BACK GROUND

The site of work for this project is Har Karen, Negev Desert, Israel.

1.2 SCOPE OF WORK

The work to be performed under this construction contract consists of furnishing all labor, material, equipment, tools, quality control, supervision, transportation and associated services necessary to perform and complete the requirements herein, in strict compliance with the specifications stated below.

1.3 DESCRIPTION OF WORK

This contract is for the replacement of the Area Lighting System (ALS). Work will be performed with limited interruption of the existing ALS functions and with limited interruptions of normal site operations. The objective is to place a new pole as close as possible to the wooden pole being replaced; this will allow for connecting the new pole to the same location in the ALS network. During the connection of the steel pole to the ALS, it is acceptable to remove the wood pole from the ALS to permit utilization of the existing power conductors. Once the new steel pole is connected, then the wood pole can be disposed of. Underground cabling is not required unless the contractor damages the existing underground network or other cabling. Installation is to be complete within 90 days of execution. If additional time is need due to concrete curing it will be annotated in contractor proposal. The contractor will have a fluent English speaker on site, but may have a limited level English speaker on site if a fluent English speaker is readily available by phone.

Specifications:

1. Install 18 new poles rated for local wind max gusts and continuous wind load plus 20%. Poles must also be rated for local environment conditions such as but not limited to temperature, soil conditions, solar exposure and seismic activity.

2. Top of pole, including foundations, will be minimal of 8.2m, but no more than 8.5m from ground level.

3. The new poles will allow for the attachment of the existing ALS light fixture mounting cross arm at a point

0.6m from the top of the pole. Photos of cross arm are available upon request. Note the pole mounting brace is 12.8 cm diameter.

4. New poles will be placed as close as possible to existing wood poles, but not further then 2m centered.

5. Special care to avoid underground cables or water lines will be taken. This will require use of cable and or metal detection equipment.

6. In the case that the existing underground cabling is damaged by the contractor, the contractor will repair it by way of proper COR-approved splicing techniques.

7. The bond between the new steel pole and the existing grounding grid will be exothermically welded or bolted using appropriate bolts, clamps and or terminations that are required for connections between the copper ground cables. If mechanical bonding is used it must be exposed so that it may be inspected by the government.

8. Once the replacement pole is connected to the ALS grid the old wood pole will be removed.

9. Old wood poles can be ether cut off at ground level or pulled from ground if done so without effecting surrounding facilities or underground cables or pipes. Any damages and or filling/compacting of holes will be the responsibility of contractor.

10. Disposal of old wool poles will be the responsibility of contractor.

11. Steel poles and all mounting hardware will be corrosion resistant and or will be treated with appropriate corrosion inhibitors. Ground bonds will not be painted, but will be treated if need be.

12. Base/Foundation design and or materials. The base or foundation must be able to support pole or tower and be able to be inspected in that catastrophic failure or deterioration of pole can be identified and or mitigated.

13. Direct burial of an appropriate portion of pole can be an option if longevity and detection of pending failure of pole can be adequately illustrated.

14. Additional conditions:

a. Four wood ALS poles have fallen. These and any other additional fallen ALS wood poles will be treated the same as a pole still standing. Disposal remains the responsibility of contractor.

b. Two ALS existing wood poles also support low voltage cable less than 4cm in diameter. During the removal of these two poles the contractor will carefully remove the support of cable and assist in the attachment of the cable to the replacement pole. The contractor will only give lift support for the attachment of the low voltage cable to the new steel pole. No materials or design is required. Photos available upon request.

c. Three existing ALS poles are in or next to concrete. Two replacement poles are able to be placed just off the concrete. One pole will need to be replaced in concrete. Photos available upon request.

15. The contractor will provide and install a 4 pole Manual Transfer Switch (MTS) inline and ahead of the 100 amp main breaker of the 400vac 50 Hz compound area main panel located just inside the US access control point. The MTS will be in a weatherized dust and drip proof outdoor metal enclosure to be mounted to the side of the existing compound area main panel. The operation of the MTS can be performed without opening of the MTS enclosure. The MTS will facilitate the connection of a backup generator to be installed and connected by others. While the contractor is not the installer of the backup generator or the cabling to the backup generator, the new MTS will allow for the connection of a 5x50mm2 power cable and the MTS enclosure will have the cable access gland for the later installation of a 5x50 mm2 power cable. See attached one line diagram.

16. The contractor will transfer over the light fixtures of the remaining standing ALS pole (14 currently) with mounting cross arms to new ALS poles. Photos available upon request.

17. The contractor will transfer over the cross arms of the 4 fallen ALS poles to the new The ALS poles.

18. The contractor will install new light fixture replacements for the 4 fallen ALS poles. New light fixtures will be the same or as close as possible to the existing light fixtures. Photos available upon request.

19. The contractor will install a new connection and light fixture breaker pole panel on each ALS pole on each pole.

a. Panel cabinet will have and be installed to a minimal of IP54 enclosure rating.

b. The panel cabinet will have an IP54 panel cover that allows easy of access to light fixture circuit breakers but does not expose power connection bus when opened.

c. All cables in will be at the bottom or low on the sides of cabinet and use cable glands that will maintain IP 54 rating of cabinet.

d. Each pole panel will have a connection bus to allow for a 5 wire 16mm2 (3 phases, Neutral and a ground) power feed in and 5 wire 16mm2 ( 3 phases, Neutral and a ground) power feed out and tap to support for 4 each C16 two pole breaker. One for each light fixture. Photos available upon request. The configuration will have two phases having one light fixture and one will have two light fixtures. The phase with two light fixtures will be rotated between light poles. Thus giving relative phase balance for each ALS circuit.

e. New pole panel will be mounted 1 to 1.5 m above ground level, but can be mounted lower if existing power cable is to short.

f. The contractor will install a 2.5mm2 single phase circuit from new pole panel up the pole to each light fixture. 2.5 mm2 cables will be rated for full exposure.

g. The contractor will connect in the existing 5 wire 16mm2 light circuit power cable. This connection will have one in a one out except for the last pole on that circuit.

h. There may be one ALS pole panel that may have a requirement for one 5x16mm2 cable in and two 5x16mm2 cable out.

20. The ALS has three separate 32 amp circuits. ALS connection currently connected to and on existing wood poles can be transferred to replacement steel poles by section.

21. All 16mm2 cables in and out of pole panel cabinets will be protected by conduit in and out till at lease ground level.

22. The cabling between pole panel cabinet and the light fixtures will be protected in conduit to the level of the fixture cross arm.

23. The locations for the new pole sites will be tested with a cable and or metal detection equipment to verify the absence of ether cables of other below surface facilities and then the site will be approved by Site Command staff with coordination with tenant site organizations.

24. The acceptance testing will be in accordance with IEC and host nation, but at a minimal will include loop impedance tests of line, neutral and ground circuits, insulation test of all conductors after insulation, but before connection to light fixtures and installed functional test of light fixtures. These tests will be documented as well as with type and calibration dates noted for test devices. All tests will be performed in the presence of a United States Government representative.

Estimates of Required Resources

a. 33 meters of conduit for 5X16mm2 cable with mounting braces. (Protections for existing power cable between ground and new pole panels.

b. 540 meters of 3X2.5mm2 light fixture circuits between pole panels and fixtures.

c. 135 meters of conduit for four each runs of 3x2.5mm2 with mounting braces (protection for b.

above)

d. 18 new pole panels in IP54 enclosures

i. With two each 5X16mm2 power cables and four each 2.5mm2 single phase circuit buses

ii. 4 two pole C16 mini breakers

iii. Limited breaker access cover.

e. 33 each cable glands for 5X16mm2 power cables

f. 72 each cable glands for 3x2.5 mm2 cables (item b above)

g. 16 each replacement light fixtures. (see data plate photo)

1.4 HOURS OF WORK: Normal hours of work shall be between 0700 and 1700, Sunday through Thursday.

Only for special conditions existing during the contract will work be permitted during nights, Fridays and Saturdays, or holidays. The contractor must submit for approval to the Contracting Officer a written request to work other than normal duty hours.

1.5 COORDINATION

The Contractor shall coordinate his work operations with the Contracting Officer Representative (COR). No work shall proceed without proper coordination with the Government Representative. Prior to completion of the project, the Contractor shall notify the COR, in advance, in sufficient time to allow the scheduling of a date for Final Inspection.

1.6 PERFORMANCE OF WORK

Work shall be accomplished in an efficient manner to minimize the time frame required to complete the project. All work including punch list items and cleanup must be completed and accepted by the contracting officer within the contract time period. Care shall be exercised to prevent damage to government property in or near the work sites.

Dust and/or debris shall be positively controlled at all times. Any damages to government property shall be repaired or replaced by the Contractor at his expense and within the time period of the project.

1.7 SAFETY REQUIREMENTS

The Contractor should comply with the Host Nation's safety standards, regulation and law, as well as the U.S. Army Corps of Engineers EM-385-1-1 Safety and Health Requirements Manual found at http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1- 1_2008Sep_Consolidated_2011Aug.pdf.

1.8 DISCONNECTION OF UTILITIES

The Contracting Officer shall be notified in writing at least five (5) working days prior to any disconnection of utilities. At no time during the performance of this contract shall the Contractor disrupt any utilities without prior written approval of the Contracting Officer. Utility outages, effecting areas larger than the area of work currently under the Contractor’s control, shall not be permitted except when the work would be impossible to safely perform.

1.9 ACCIDENT REPORTS

The Contractor shall promptly report all accidents resulting in property damage and/or personal injury or death directly to the Government Representative.

1.10 CONTRACTOR FURNISHED MATERIAL AND/OR EQUIPMENT

The Contractor shall be responsible for furnishing all material and/or equipment required to perform all work outlined in this contract unless specifically stated as government furnished material or equipment.

1.11 STORAGE AND PROTECTION OF MATERIALS

It shall be the responsibility of the contractor to furnish storage for and protection of all materials and equipment used in conjunction with this project until the project is accepted by the Government. The Government will furnish an open unprotected area (such as in parking lot) where the contractor can store materials upon approval from Government representative. Any materials delivered to the site by other than the Contractor will not be accepted by Government personnel.

1.12 HEALTH REQUIREMENTS

The Contractor shall be responsible for insuring the healthy work place for his employees and surrounding government employees. The Contractor shall conduct a walk through inspection of the work site to determine if any hazardous chemicals are present and if necessary perform testing to verify the presence of hazardous compounds. If hazardous compounds are present, the Contractor shall be responsible for eliminating them prior to start of work.

The Contractor shall comply with Construction Standards (29 CFR 1926) and General Industry Standards (29 CFR 1910).

1.13 ENVIRONMENTAL PROTECTION

The Contractor shall be responsible for complying with all environmental protection regulations. Any hazardous materials used by the Contractor in performing this contract shall be properly packaged and stored in a sealed container to avoid spills, and shall be promptly removed off post upon completion of the contract. All spills of hazardous materials shall be reported immediately to the Contracting Officer and shall be cleaned up immediately by the contractor at his own expense in accordance with local policy. The Government shall have the right to sample and test any equipment which spills fluid within the installation. If determined necessary by the Government Environmental Safety Team then the contaminated area shall be excavated, refilled, repaired and restored to the original conditions by the Contractor. Clean up wastes shall be disposed of by the Contractor as hazardous wastes in accordance with local policies.

1.14 HAZARDOUS WASTES HANDLING

The Contractor shall not store any hazardous waste in or around the area of the site of installation without obtaining prior permission and related instructions from the Contacting Officer. Hazardous wastes shall be moved off post and disposed as they are generated. In no case shall the wastes remain on the installation after completion of this work. It is the Contractor’s responsibility to comply with local regulations concerning hazardous waste generation, storage, treatment, removal and disposal.

1.15 SIGNAGE

The contractor shall post signs to indicate conditions and restriction in and around the work site. Signs shall be posted and be visible from all approaches to the work site.

SECTION E - INSPECTION AND ACCEPTANCE

The following have been added by full text:

52.246-1 CONTRACTOR INSPECTION REQUIREMENTS (APR 1984)

The Contractor is responsible for performing or having performed all inspections and tests necessary to substantiate that the supplies or services furnished under this contract conform to contract requirements, including any applicable technical requirements for specified manufacturers' parts. This clause takes precedence over any Government inspection and testing required in the contract's specifications, except for specialized inspections or tests specified to be performed solely by the Government.

(End of clause)

52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)

(a) Definition. "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

(c) Government inspections and tests are for the sole benefit of the Government and do not--

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

(3) Constitute or imply acceptance; or

(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.

(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.

(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

(g) If the Contractor does not promptly replace or correct rejected work, the Government may (1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor or (2) terminate for default the Contractor's right to proceed.

(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.

SECTION H - SPECIAL CONTRACT REQUIREMENTS

ANTITERRORISM 5152.209-4000

5152.209-4000 DOD LEVEL I ANTITERRORISM (AT) STANDARDS (FEB 2009)

(a) Pursuant to Department of Defense Instruction Number 2000.16, “DoD Antiterrorism (AT) Standards,” dated October 2, 2006, each contractor employee requiring access to a Federally-controlled installation, facility and/or Federally-controlled information system(s) shall complete Level I AT Awareness Training on an annual basis and receive a certificate of completion. The training is accessible from any computer and is available at https://atlevel1.dtic.mil/at/. The contractor is responsible for ensuring that all applicable employees have completed antiterrorism awareness training and shall certify that their workforce has completed the training through the submission of completion certificate(s) to the Contracting Officer and the Contracting Officer’s Representative (if appointed) within five working days after contract award or prior to access to a Federally-controlled installation or information system.

(b) In the event that the automated system at https://atlevel1.dtic.mil/at/ is not available (e.g., server problems), Level I AT Awareness Training can be provided by a qualified instructor. However, if the training is not completed online, the Level I AT Awareness Instructor qualification must be coordinated with the Installation Antiterrorism Officer (or Installation Security equivalent) and the resultant name(s) of approved instructors shall be provided the contracting officer or designee along with all associated cost or schedule impacts to the contract.

(c) Antiterrorism performance (Level I AT Awareness Training attendance and compliance) may be documented as a performance metric under the resultant contract, and be part of past performance information in support of future source selections.

LEGAL HOLIDAYS

The following Federal legal holidays are observed by this installation:

New Year's Day 1 January Martin Luther King's Birthday Third Monday in January President's Day Third Monday in February Memorial Day Last Monday in May Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December

MAGNITUDE OF PROJECT

The magnitude of this project is:

( ) Less than $25,000 ( ) Between $25,000 and $100,000.

( X ) Between $100,000 and $250,000.

( ) Between $250,000 and $500,000.

( ) Between $500,000 and $1,000,000.

( ) Between $1,000,000 and $5,000,000.

( ) Between $5,000,000 and $10,000,000.

( ) More than $10,000,000.

This RFP may contain sensitive information. The prime contractor shall not distribute pertinent information, i.e., plans and specifications, to any individuals or subcontractor(s) over an electronic system without security measures in place.

SECTION I - CONTRACT CLAUSES

The following have been added by reference:

52.243-4 Changes JUN 2007

252.233-7001 CHOICE OF LAW (OVERSEAS) (JUNE 1997)

This contract shall be construed and interpreted in accordance with the substantive laws of the United States of America. By the execution of this contract, the Contractor expressly agrees to waive any rights to invoke the jurisdiction of local national courts where this contract is performed and agrees to accept the exclusive jurisdiction of the United States Armed Services Board of Contract Appeals and the United States Court of Federal Claims for hearing and determination of any and all disputes that may arise under the Disputes clause of this contract.

The following have been modified:

52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 238210.

(2) The small business size standard is N/A.

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204-7 is not included in this solicitation, and the offeror is currently registered in System for Award Management (SAM), and has completed the Representations and Certifications section of SAM electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:

( ) Paragraph (d) applies.

( ) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c) (1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.

(iii) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.

(iv) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(v) 52.209-2; Prohibition on Contracting with Inverted Domestic Corporations--Representation.

(vi) 52.209-5; Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(vii) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.

(viii) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(ix) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.

(x) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.

(xi) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xii) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xiii) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.

(xiv) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

(xv) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA- designated items.

(xvi) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.

(xvii) 52.225-4, Buy American--Free Trade Agreements--Israeli Trade Act Certificate. (Basic, Alternates I, II, and III.) This provision applies to solicitations containing the clause at 52.225- 3.

(A) If the acquisition value is less than $25,000, the basic provision applies.

(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.

(C) If the acquisition value is $50,000 or more but is less than $79,507, the provision with its Alternate II applies.

(D) If the acquisition value is $79,507 or more but is less than $100,000, the provision with its Alternate III applies.

(xviii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.

(xix) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan--Certification. This provision applies to all solicitations.

(xx) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran—Representation and Certification. This provision applies to all solicitations.

(xxi) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.

(2) The following certifications are applicable as indicated by the Contracting Officer:

[Contracting Officer check as appropriate.]

(i) 52.204-17, Ownership or Control of Offeror.

X (ii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.

(iii) 52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Certification.

(iv) 52.222-52 Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Certification.

(v) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA- Designated Products (Alternate I only).

(vi) 52.227-6, Royalty Information.

(A) Basic.

(B) Alternate I.

(vii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.

(d) The offeror has completed the annual representations and certifications electronically via the SAM website accessed through https://www.acquisition.gov. After reviewing the SAM database information, the offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [offeror to insert changes, identifying change by clause number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.

FAR Clause Title Date Change

Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on SAM.

(End of provision)

52.225-17 EVALUATION OF FOREIGN CURRENCY OFFERS (FEB 2000)

If the Government receives offers in more than one currency, the Government will evaluate offers by converting the foreign currency to United States currency using WWW.XE.COM in effect as follows:

(a) For acquisitions conducted using sealed bidding procedures, on the date of bid opening.

(b) For acquisitions conducted using negotiation procedures--

(1) On the date specified for receipt of offers, if award is based on initial offers; otherwise

(2) On the date specified for receipt of proposal revisions.

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil/

252.225-7043 ANTITERRORISM/FORCE PROTECTION POLICY FOR DEFENSE CONTRACTORS

OUTSIDE THE UNITED STATES (JUN 2015)

(a) Definition. United States, as used in this clause, means, the 50 States, the District of Columbia, and outlying areas.

(b) Except as provided in paragraph (c) of this clause, the Contractor and its subcontractors, if performing or traveling outside the United States under this contract, shall--

(1) Affiliate with the Overseas Security Advisory Council, if the Contractor or subcontractor is a U.S. entity;

(2) Ensure that Contractor and subcontractor personnel who are U.S. nationals and are in-country on a non-transitory basis, register with the U.S. Embassy, and that Contractor and subcontractor personnel who are third country nationals comply with any security related requirements of the Embassy of their nationality;

(3) Provide, to Contractor and subcontractor personnel, antiterrorism/force protection awareness information commensurate with that which the Department of Defense (DoD) provides to its military and civilian personnel and their families, to the extent such information can be made available prior to travel outside the United States; and

(4) Obtain and comply with the most current antiterrorism/force protection guidance for Contractor and subcontractor personnel.

(c) The requirements of this clause do not apply to any subcontractor that is--

(1) A foreign government;

(2) A representative of a foreign government; or

(3) A foreign corporation wholly owned by a foreign government.

(d) Information and guidance pertaining to DoD antiterrorism/force protection can be obtained from HQDA-AT;

TELEPHONE, DSN 222-9832 OR COMMERCIAL (703)692-9832.

252.229-7001 TAX RELIEF (SEPT 2014)

(a) Prices set forth in this contract are exclusive of all taxes and duties from which the United States Government is exempt by virtue of tax agreements between the United States Government and the Contractor's government. The following taxes or duties have been excluded from the contract price:

NAME OF TAX: (Offeror Insert) __________ RATE (PERCENTAGE): (Offeror Insert) _______________

(b) The Contractor's invoice shall list separately the gross price, amount of tax deducted, and net price charged.

(c) When items manufactured to United States Government specifications are being acquired, the Contractor shall identify the materials or components intended to be imported in order to ensure that relief from import duties is obtained. If the Contractor intends to use imported products from inventories on hand, the price of which includes a factor for import duties, the Contractor shall ensure the United States Government's exemption from these taxes. The Contractor may obtain a refund of the import duties from its government or request the duty-free import of an amount of supplies or components corresponding to that used from inventory for this contract.

The following have been deleted:

52.215-1 ADDENDUM

CLAUSES

52.209-2 Prohibition on Contracting with Inverted Domestic

Corporations--Representation

DEC 2014

52.213-4 Terms and Conditions--Simplified Acquisitions (Other Than Commercial Items)

MAY 2015

52.225-20 Prohibition on Conducting Restricted Business Operations in Sudan--Certification

AUG 2009

52.236-28 Preparation of Proposals--Construction OCT 1997 52.246-12 Inspection of Construction AUG 1996 252.233-7001 Choice of Law (Overseas) JUN 1997

CCE-204-4005 CONVENTIONAL FORCES EUROPE (CFE) TREATY

VERIFICATION INSPECTION

MAR 2005

The following were previously included by reference and are now included by full text:

52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)

(a) The Contractor shall comply with agency personal identity verification procedures identified in the contract that implement Homeland Security Presidential Directive-12 (HSPD-12), Office of Management and Budget (OMB) guidance M-05-24, and Federal Information Processing Standards Publication (FIPS PUB) Number 201.

(b) The Contractor shall account for all forms of Government-provided identification issued to the Contractor employees in connection with performance under this contract. The Contractor shall return such identification to the issuing agency at the earliest of any of the following, unless otherwise determined by the Government:

(1) When no longer needed for contract performance.

(2) Upon completion of the Contractor employee's employment.

(3) Upon contract completion or termination.

(c) The Contracting Officer may delay final payment under a contract if the Contractor fails to comply with these requirements.

(d) The Contractor shall insert the substance of this clause, including this paragraph (d), in all subcontracts when the subcontractor`s employees are required to have routine physical access to a Federally-controlled facility and/or routine access to a Federally-controlled information system. It shall be the responsibility of the prime Contractor to return such identification to the issuing agency in accordance with the terms set forth in paragraph (b) of this section, unless otherwise approved in writing by the Contracting Officer.

(End of Clause)

252.222-7002 COMPLIANCE WITH LOCAL LABOR LAWS (OVERSEAS) (JUN 1997)

(a) The Contractor shall comply with all—

(1) Local laws, regulations, and labor union agreements governing work hours; and

(2) Labor regulations including collective bargaining agreements, workers' compensation, working conditions, fringe benefits, and labor standards or labor contract matters.

(b) The Contractor indemnifies and holds harmless the United States Government from all claims arising out of the requirements of this clause. This indemnity includes the Contractor's obligation to handle and settle, without cost to the United States Government, any claims or litigation concerning allegations that the Contractor or the United States Government, or both, have not fully complied with local labor laws or regulations relating to the performance of work required by this contract.

(c) Notwithstanding paragraph (b) of this clause, consistent with paragraphs 31.205-15(a) and 31.205-47(d) of the Federal Acquisition Regulation, the Contractor will be reimbursed for the costs of all fines, penalties, and reasonable litigation expenses incurred as a result of compliance with specific contract terms and conditions or written instructions from the Contracting officer.

The following were previously included by full text and are now included by reference:

252.236-7001 Contract Drawings, and Specifications AUG 2000

CCE-236-4003 NOTICE TO PROCEED MAR 2005

SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS

OFFEROR INFORMATION

Please complete and include this form with your Proposal.

Name of Company (Offeror)_______________________________________________________ Name of Joint Venture Partner (if applicable) Address_______________________________________________________________________ Office Tel #s____________________________________________________________________ Name of Point of Contact (POC) representing offeror/contractor in negotiations Email Address of POC____________________________________________________________ Phone #s of POC________________________________________________________________ Company Website (if applicable)___________________________________________________ Company Cage Code________________________________ Company DUNS #__________________________________

Tax ID # (if applicable)_________________________________________ Registered in WAWF ___________Yes ___________No Registered in SAM.gov __________Yes ___________No Date this form was completed___________________________________

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

INSTRUCTION TO OFFERORS

A. Proposal Submittal Requirements and Inquiries.

1. Proposals shall be submitted electronically and prior to the closing date and time identified on the SF 1442.

2. The Point of Contact responsible for answering all inquiries is the Contracting Officer via the Contract

Specialist. Address all questions or concerns to the Contract Specialist, Rebecca Hamrick, rebecca.k.hamrick.civ@mail.mil and Contracting Officer, Mary Harding, mary.j.harding8.civ@mail.mil. All questions regarding this solicitation shall be submitted in writing via email.

B. General Instructions

1. Offers will be evaluated using the criteria under “Basis for Award.” Noncompliance with the Request for Proposal (RFP) requirements may hamper the Government's ability to properly evaluate the proposal and may result in elimination of the proposal from further consideration for contract award.

2. The Offer. The submission of the documentation specified below will constitute the Offeror's acceptance of the terms and conditions of the RFP, concurrence with the Statement of Work, and contract type.

C. Proposal Preparation Instructions – Proposal Content

Factor 1- Mission Capability: The offeror shall provide Work Plan information on his approach to performing the requirements of the Statement of Work (SOW). Information provided should be clear, concise, and include sufficient detail for effective evaluation of the offeror’s proposal.

The offeror should provide details of how he intends to work the project, taking into account the following specifications and requirements of the SOW:

a. Replacement pole type (steel poles, fiberglass, mini towers and even treated wood as long as use meets requirements of load bearing, durability and longevity).

b. Base/Foundation design and or materials. The base or foundation must be able to support pole or tower and be able to be inspected in that catastrophic failure or deterioration of pole can be identified and or mitigated.

c. Details on the manufactures installation requirements and recommendations. Any local code requirements will be presented and addressed if requirements are not covered in the IEC or manufacture's guidance.

d. Pole to foundation mounting.

e. Details and relative calculations and/or manufacture’s data on how the new pole and installations techniques will meet local wind load.

f. Ground Bonding.

g. Removal of old wood poles and broken ALS equipment.

h. Details of corrosion resistance, inhibitors or other treatments.

i. List of new materials to be purchased to replace broken materials on existing ALS.

j. Time table - provide some type of construction schedule showing how long it will take to complete this project..

k. Drawing: The contractor will show a drawing of the standard pole wiring configuration from the 5x16mm2 existing power connection to the light fixtures. The drawing should clearly show the 5X16mm2 connection and feed thru bus, the distribution connection and light circuit pole mounted panel box and the circuits up the pole to include light fixture connections.

The proposal should not simply re-phrase or re-state the Government's requirements, but rather shall provide technical information that will demonstrate how the offeror intends to meet these requirements. Statements that the offeror understands, can, or will comply with the SOW; statements paraphrasing the SOW or parts thereof ; and, phrases such as “Standard procedures will be employed” or “Well-known techniques will be used,” etc., will be considered unacceptable.

Factor 2 - Technical Capability: The offeror shall provide a summary of his organization's experience and technical…

This is the start of the file's text. The full file is on GovTribe.