Request for Proposal W52P1J-21-R-0005 Amendment 0001.pdf
PDF 50 KB Posted
- Attached to
- M782 Multi-Option Fuze for Artillery (MOFA)
- Solicitation number
- W52P1J-21-R-0005
About this file
This document is a continuation sheet for a Request for Proposal for the M782 Multi-Option Fuze for Artillery (MOFA). The Army is seeking 399 MOFA fuzes and associated components for First Article Testing, as well as long-term production quantities. Offerors must submit proposals by June 9, 2021, with a First Article Test Report due 545 days after delivery order award. The RFP includes requirements for quality assurance, measurement systems analysis, statistical process control, and corrective action procedures. Automated acceptance inspection equipment must have 99.8% reliability for critical characteristics. The Army will test First Article samples at Yuma Proving Ground and conduct lot acceptance testing on samples selected from each production lot. Awarded contractors must prepare ammunition data cards using the Worldwide Ammunition-data Repository Program and comply with standards for energetic materials description sheets, 2D barcoding, and supplemental product warranties.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0001 2021JUL01
W52P1J
ARMY CONTRACTING COMMAND - RI
ROCK ISLAND, IL 61299-8000
BLDGS 60 & 62
GEORGE R. LINGRIS
EMAIL: GEORGE.R.LINGRIS.CIV@MAIL.MIL
W52P1J-21-R-0005
2021JUN09
X
X
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 20
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: GEORGE R. LINGRIS
Buyer Office Symbol/Telephone Number: CCRI-AC/(309)782-3855
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
The purpose of Amendment 0001 to Request for Proposal W52P1J-21-R-0005 is to provide answers to the following questions that have been received by the U.S. Government:
Question 1 - Order Limitations Clause I-132 52.216-19 (b) (2) states Any order for a combination of items in excess of N/A. Will the Government be updating this section to define a specific quantity or will it be left as N/A?
Answer 1 - N/A has been replaced with 45,140 which is the total of the highest quantity listed for each of the three items.
Question 2 - Section H - Special Contract Requirements - Solicitation has no Section H was that intended?
Answer 2 - There are no special contract requirements in the RFP.
Question 3 - In Section E of the RFP Page 11, the Subsequent FAT will be required if out of production for more than 90 days but the
U.S. Government may tailor this SFAT as it deems appropriate. If the bidder assumes tailoring and bids less than the complete FAAT
(399 fuzes + components), but a complete FAAT is required, who is responsible for the additional quantities?
Answer 3 - Bids for subsequent First Article Test (FAT) should assume full FAT. Any tailoring will be negotiated at time of tailoring.
Initial FAT would account for the full facilitization of the production line, inspection equipment, and the supplies to ensure all processes and procedure are in place to support production in accordance with the contract.
Subsequent FAT assumes that initial FAT has already been executed, and should not include any additional facilitization, inspection equipment, and supplies are needed to support production other than the components in the MOFA TDP.
Question 4 - CDRL A011 states The FATR report shall be submitted 270 days after contract award but RFP page 5 states "First Article
Test (FAT) Report is due no later than 18 months (545 calendar days) after delivery order award as delineated in FAR 52.209-3. The
FAT samples are due 45 days prior to that date." Could the USG please clarify the RFP vs. the CDRL?
Answer 4 - The FAT Report CDRL has been revised to state 545 days.
Question 5 - Item I-138 on Page 46 in the RFP: Is the security / classification IV /4 only intended for the end item to use? What are the security requirements for lower level assembly?
Answer 5 - No. The requirements of DoD 5100.76-M Security Risk Category IV apply to the end item and all lower level assemblies that contain AA&E.
Question 6 - Our interpretation is that FAT and LAT shipment will be FOB origin with GBL per RFP pages 20 and 21 para 9.b and 11.a.
Does the USG concur with this?
Answer 6 - FAT and LAT shipments shall be FOB Origin.
Question 7 - DFARS 252.204.7021 is listed as 'included' in this solicitation. Is there more information which can be provided about this clause such as what CMMC level is required?
Answer 7 - Clause 252.204.7021 has been removed from the RFP.
Question 8 - Can the USG give us some insight into the USG ordering plan for this procurement?
Answer 8 - This is an indefinite delivery indefinite quantity contract. The only guarantee is the minimum guarantee as specified in the RFP.
Question 9 - CDRL A017 Quality Audit Site Visit Schedule states to notify the customer 15 days prior to an audit but in section E of the RFP item 2 it states to notify the customer 30 days prior to an audit, which one is correct? Also in the same section of the
RFP it references CDRL A018 but we believe it should reference CDRL A017, do you agree?
2 20
W52P1J-21-R-0005
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Answer 9 - Section E of the RFP has been updated to state 15 days rather than 30 days. The reference to CDRL A018 in Section has been changed to CDRL A017.
Question 10 - Our interpretation is that CDRL A016 Failure Summary and Analysis Report is only required to document FAT and LAT failures. Does the USG concur?
Answer 10 - Correct. Plus any failures discovered during production that violate the specification.
Question 11 - We have experienced historic in process attrition for MMIC & associated assemblies go as high as 10% during factory testing. Please confirm that the MMIC GFM quantity will sufficient to cover required in factory attrition.
Answer 11 - Yes, there is sufficient quantity to support in process attrition during factory testing.
The U.S. Government will provide answers to contractor questions not addressed above in a forthcoming RFP amendment.
All other terms and conditions remain unchanged.
*** END OF NARRATIVE A0002 ***
3 20
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
1. First Article Test: Defined below are the different FATs that may be required throughout the life of any resulting contracts from this RFP. The definitions serve to further clarify the First Article Test clause in the contract.
Initial FAT: The initial FAT is the FAT awarded at the start of the contract. This FAT is in accordance with the complete FAT requirements in the TDP and contract. This FAT would account for the full facilitization of the production line, inspection equipment, and the supplies to ensure all processes and procedures are in place to support production in accordance with the contract. The U.S.
Government plans to award an initial FAT no more than once per contract for each item.
Subsequent First Article Test (SFAT): The SFAT is defined as the FAT awarded on a delivery order after an initial FAT is approved. A
SFAT will be required when an item has been out of production for more than 90 days or a change occurs in the manufacturing process, material used, source of supply, place of performance, or there has been a major change to the technical data, drawings or specifications. SFATs will typically be in accordance with the complete FAT requirements, however the U.S. Government may tailor this
SFAT as it deems appropriate. Determination will be made concerning the need for the subsequent first article test or portion thereof at the time of delivery order or following notification of change to the Contracting Officer. Component FATs are required to be part of the
SFAT if the component has been out of production for more than 90 days or a change occurs in the manufacturing process, material used, source of supply, place of performance, or there has been a major change to the technical data, drawings or specifications. The U.S.
Government plans to award a SFAT no more than once per item per delivery order.
Complete FAT: A Complete FAT shall consist of items and quantities in accordance with all item specifications, quality assurance provisions (QAPS), and drawings listed in the TDP. The contractor shall provide first article samples, test equipment, inspection results, test results, and conduct destructive FAT less Ballistic test. The U.S. Government will conduct the ballistic testing and the contractor shall submit samples in accordance with specifications. The contractor shall conduct the FAT at the manufacturing site of the specific item or component. The FAT will be performed by the contractor and witnessed by the U.S. Government. The U.S. Government shall be invited to witness production of FAT samples or start up units during the FAT and verify dimensional measurements on samples. FATs shall be performed in accordance with 52.209-4511, First Article Test (U.S. Government Testing), 52.209-4512, First Article Test
(Contractor Testing), and FAR 52.209-4 (First Article Approval Government Testing Alternate I). The contractor shall provide a First
Article Qualification Test Plan and Procedures in accordance with the contract. Upon the completion of the FAT, the contractor is responsible for providing a FAT Report in accordance with the contract. Ballistic testing will be conducted at a designated U.S.
Government facility. Initial ballistic testing will be funded by the U.S. Government; however, all subsequent testing due to failure will be borne by the contractor as applicable. Reporting and analysis of the ballistic testing will be conducted by the U.S. Government.
Acceptance of the FAT will be provided by the Contracting Officer upon review of FAT Report, inspection data and ballistic data.
2. Annual QMS Audits:
The contractor shall develop and maintain a plan in its Quality Management System (QMS) for quality system audits (including vendor/suppliers) to verify compliance to contract requirements. The plan shall include a schedule for the conduct of these audits and provisions for the U.S. Government to participate as part of the audit team; audit schedules and audit reports shall be provided to the
U.S. Government IAW CDRL A017. The contractor shall notify the U.S. Government 15 days prior to any subcontractor/vendor audit so that the U.S. Government may participate at its discretion.
At any time during this contract effort the U.S. Government reserves the right to independently audit or examine the contractors and any sub-contractors Quality Management System and Records for Compliance to all contractual quality requirements. The contractor shall ensure the necessary provisions are placed in all sub-contractor/vendor purchase orders/contracts to grant the U.S. Government access to perform these audits. The contractor shall provide personnel and facilities to support the above audits. The U.S. Government will notify the contractor 30 days prior to conducting an audit.
3. CRITICAL CHARACTERISTICS CONTROL
(a) The contractors processes shall be designed with the objective of preventing the creation or occurrence of non-conforming critical characteristics (see paragraphs d & e). The contractor shall establish, document and maintain a product specific, critical characteristics control (CCC) plan that shall be submitted to and approved by the Procuring Contracting Officer (PCO) IAW DD Form 1423.
The CCC plan shall include or reference all procedures, work and handling instructions and process controls relating to any critical characteristics. Mistake Proofing techniques of the material handling and inspection systems shall be a part of the CCC Plan. Guidance for developing this plan and submitting Critical Plans of Action (CPOA) (paragraph g) can be found at http://www.ardec.army.mil/organizations/QESA/ .
(b) The contractor shall assure its critical processes are robust in design, capable and under control, with the objective of not generating any critical non-conformances. The contractor shall calculate, document, clearly identify, and have a schedule that routinely assess the reliability and effectiveness of its critical processes to prevent generating critical non-conformances as identified in the
CCC Plan.
(c) An inspection and verification system shall be employed that will verify the robustness of all critical processes. The contractor shall calculate, document, clearly identify, and have a schedule that routinely assess the reliability and effectiveness of its inspection and verification system to detect and prevent critical non-conformance escapes as identified in the CCC Plan. The Government
4 20
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
expects that a contractor will allow zero critical escapes. To demonstrate its critical escape risk the contractor will utilize the nonconformance escape risk goal provided below.
(1) Unless otherwise specified immediately below, the calculated critical non-conformance escape risk is 1 in a million (.000001) items delivered. Or:
Alternate calculated Critical Non-conformance Escape risk: N/A
Unless otherwise approved by the PCO, the non-conformance escape risk is the sum of the individual characteristic escape rates. The probability of escape for a single characteristic shall be calculated by multiplying the non-conformance rate(s) entering the inspection system(s) by the error rate of the inspection system(s). These escape rates are then summed and shall not exceed the tolerable critical non-conformance escape risk.
(2) Within 45 days after award, the contractor can elect to submit a phased-in approach on how the non-conformance escape risk will be achieved over a period of time not to exceed 180 days from the date of first article approval, or from initiation of production when first article is not required. Submission will require approval by the Government and is subject to a technical review and analysis.
Allowance for a phased-in approach will then become a part of the contract. Disapproval of the contractors submission does not relieve the contractor of its obligation to comply with the terms of this requirement.
(3) Based on the maximum error rate defined for the inspection system, the contractor shall develop a test procedure to demonstrate the error rate. As part of the test plan the contractor shall include sufficient test quantities to assure 90% statistical confidence in the resultant rates unless otherwise approved by the PCO. Once established, the contractor shall have a documented schedule to routinely monitor the non-conformance and inspection system error rates to assure they do not exceed the maximum rates allotted.
(d) As a result of previous practices, the governments technical data may refer to Critical I, Critical II, and Special characteristics.
The use of the term critical characteristics within this section includes Critical I, Critical II and Special characteristics and the use of the term critical nonconformances includes those nonconformances pertaining to Critical I, Critical II and Special characteristics. Unless otherwise stated in Section C, these characteristics shall be subject to all requirements of this section.
(e) In addition to critical characteristics defined in the governments technical data (drawings, specifications, etc.), the contractor shall also identify and document in its contractor developed technical data all known material, component, subassembly and assembly characteristics whose non-conformances would likely result in hazardous or unsafe conditions for individuals using, maintaining or depending upon the product. All additional critical characteristics identified by the contractor shall comply with the critical characteristic requirements of the technical data package, supplemented herein. The Critical Item Characteristic List (CICL) review process shall be included in the CCC Plan. The contractors additional critical characteristics shall be classified in accordance with guidance located at http://www.ardec.army.mil/organizations/QESA/ and shall be submitted to and approved by the PCO prior to production (see DD Form 1423).
(f) In the event that a critical non-conformance is found anywhere in the production process, the contractor, as part of its CCC Plan, shall have procedures in place to ensure:
(1) The non-conformance is positively identified and segregated to ensure that nonconforming product does not inadvertently remain in or reenter the production process. This control shall be accomplished without affecting or impairing subsequent non-conformance analysis. Final disposition of non-conforming product shall be documented and audited for traceability.
(2) The operation that produced the non-conforming component or assembly and any other operations incorporating suspect components or assemblies are immediately stopped. (See para h. for exceptions)
(3) The government (PCO) is immediately notified of the critical non-conformance (electronic mail)(See DD Form 1423).
(4) Any suspect material is identified, segregated and suspended from any further processing and shipment.
(5) An investigation is conducted to determine the root cause of the non-conformance and the required corrective actions. An evaluation shall also be conducted with regard to suspect material to ensure that no additional critical non-conformances are present. A report of this investigation shall be submitted to the government (See DD Form 1423). The use of the DID report shall not delay notification to the government as required in f(3) above.
(6) A request to restart manufacturing or to use any suspect material associated with the critical non-conformance is submitted to the government (see DD Form 1423). Restart of production shall not occur until authorized by the PCO, unless previously addressed in the approved CCC Plan. The Government will respond to a restart request within 3 working days. All objective evidence of the investigations to date shall be available for review at the time of restart. Suspect material shall not be used without PCO approval.
(7) The procuring activity reserves the right to refuse acceptance of any suspect material until the root cause or reasonably likely cause of the critical non-conformance has been identified, corrective action has been fully implemented and sufficient evidence has been provided to exclude non-conforming material from the conforming population.
5 20
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(g) The contractor may develop alternative plans and provisions, collectively referred to as a Critical Plan of Action (CPOA), relative to government or contractor identified critical characteristics. All CPOAs are independent and shall be evaluated by the government for this contract. The CPOA and any subsequent revisions submitted IAW DD Form 1423 require PCO approval prior to implementation. Unless otherwise specified at time of approval, contractor shall review and evaluate CPOAs for currency and process improvements at least on an annual basis and submit results to the PCO. Unless otherwise approved by the PCO, each critical characteristic shall require a separate
CPOA. If the CPOA includes other documents by reference they shall be submitted upon request. Guidance for the development of a CPOA can be found in the referenced guidance located at paragraph a of this section.
(h) The contractor may continue production with an approved CPOA provided that the critical non-conformance is consistent with the failure mode(s) and rates established in the CPOA. Failure to meet all CPOA requirements will require the contractor to revert back to paragraph f requirements.
(i) If a critical non-conformance is discovered beyond its designated inspection point and prior to Government acceptance the contractor shall take actions specified in paragraph f above. If a critical non-conformance is discovered after Government acceptance the
Government has the right to invoke the requirements of paragraph f with respect to the contractors remaining production under this contract.
4. MIL-STD-1916
The Department of Defense (DoD) Preferred Methods for this Acceptance of Product, MIL-STD-1916, shall be used for this procurement action. All references to MIL-STD-105, MIL-STD-414, MIL-STD-1235, and ANSI Z1.4 appearing in the Technical Data Package (TDP) are replaced by MIL-STD-1916. Verification Levels (VL) shall replace AQLs and shall be VL IV for major characteristics and VL II for minor characteristics.
5. STATISTICAL PROCESS CONTROL
Part I General Statistical Process Control Requirements
(a) In addition to the quality requirements of the technical data package, the Contractor shall implement Statistical Process Control
(SPC) in accordance with a government accepted SPC Program Plan. Control chart techniques shall be in accordance with the American
National Standards Institute (ANSI) B1, B2 and B3. Alternate SPC charting methods may be proposed and submitted to the Government for review.
(b) The SPC Program Plan developed by the contractor shall consist of a general plan and a detailed plan. The plans shall be structured as delineated on the Data Item Description referenced in the DD Form 1423. The general and the detailed plans shall be submitted to the government for review per DD Form 1423 requirements. Notification by the Government of acceptance or nonacceptance of the plans shall be provided in accordance with the timeframes specified on the DD Form 1423. Once a general plan for a facility has been approved by this Command, the approval remains in effect for subsequent contracts as long as the contractual requirements remain substantially unchanged from contract to contract. Therefore, resubmission of a previously accepted general SPC plan is not required if current SPC contract requirements and Data Item Description (DID) requirements are fulfilled. If this Command has previously accepted the general
SPC plan under essentially the same SPC contractual requirements, so indicate by providing the Contracting Officer with the following information:
Date of Acceptance ______________
Contract Number(s) ______________
(c) The contractor is responsible for updating the general plan to current SPC contractual requirements. If errors or omissions are encountered in a previously accepted SPC general plan, opportunities for improvement will be identified by the Government, and corrective action shall be accomplished by the contractor.
(d) A milestone schedule will be submitted for those facilities who do not have, or have never had, a fully implemented SPC program and will not have a fully operational SPC program once production is initiated. The milestones shall provide a time phased schedule of all efforts planned relative to implementation of an SPC program acceptable to the Government. A milestone schedule shall include implementation start and complete dates for those SPC subjects addressed in the Statistical Process Control requirement located in Part
II of this section. The milestone schedule shall only include those actions that cannot be accomplished prior to first article or the initiation of production, if a first article is not required. Milestones shall be developed for each commodity identified for SPC application. Milestones shall be submitted through the Government Quality Assurance Representative to the Contracting Officer for review and acceptance. Any deviations from the accepted milestones, to include justification for such deviations, shall be resubmitted through the same channels for review. The Government reserves the right to disapprove any changes to the previously accepted milestones.
Notification by the Government of the acceptance or nonacceptance of the milestones shall be furnished to the Contractor by the
Contracting Officer.
(e) The Contractor shall review all process and operation parameters for possible application of SPC techniques. This review shall
6 20
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
include processes and operations under the control of the prime contractor and those under the control of subcontractor or vendor facilities. A written justification shall be included in the detailed plan for each process and operation parameter that controls or influences characteristics identified as critical, special, or major which have been deemed impractical for the application of SPC techniques. A pamphlet on application of SPC for short production runs is available through the Contracting Officer.
(f) Statistical evidence in the form of control charts shall be prepared and maintained for each process or operation parameter identified in the detailed plan. These charts shall identify all corrective actions taken on statistical signal. During production runs, control charts shall be maintained in such a manner to assure product is traceable to the control charts. At the conclusion of the production run, a collection of charts traceable to the product, shall be maintained for a minimum of 3 years. The control charts shall be provided to the Government for review at any time upon request.
(g) When the process or operation parameter under control has demonstrated both stability and capability, the Contractor may request, in writing, through Administrative Contracting Officer (ACO) and Contracting Officer (CO) channels to the Product Assurance and Test
Directorate, that acceptance inspection or testing performed in accordance with contract requirements be reduced or eliminated. Upon approval by the CO, acceptance shall then be based upon the accepted SPC plan, procedures, practices and the control charts.
(h) The Government will not consider requests for reduction or elimination of 100% acceptance inspection and testing of if any one of the following conditions exist:
(1) The existing process currently utilizes a fully automated, cost effective, and sufficiently reliable method of 100% acceptance inspection or testing for an attribute-type critical parameter or characteristic.
(2) The Contractor utilizes attribute SPC control chart methods for the critical parameter or characteristic.
(3) The critical parameter or characteristic is a first order, single point safety failure mode (nonconformance of the critical parameter or characteristic in and of itself would cause a catastrophic failure).
(i) The Government will only consider reduction or elimination of the 100% acceptance inspection or test requirement for other critical parameters or characteristics if either of the following conditions are met:
(1) The process is in a state of statistical control utilizing variable control chart methods for the critical parameter or characteristic under control and the process performance index (Cpk) is at least 2.0. The Contractor shall maintain objective quality evidence through periodic audits that the process performance index is being maintained for each production delivery.
(2) The critical parameter or characteristic is conclusively shown to be completely controlled by one or more process or operation parameters earlier in the process, and those parameters are in a state of statistical control utilizing variable data, and the product of the probability of the conformance for each earlier parameter associated to the critical characteristic is better than or equal to a value equivalent to that provided by a Cpk of at least 2.0. The Contractor shall maintain objective quality evidence through periodic audits that the process performance indexes are being maintained for each production delivery.
(j) For characteristics other than critical, requests for reduction or elimination of acceptance inspection and testing shall be considered when the process performance index is greater than or equal to a Cpk of 1.33 for variables data. Requests shall be considered for attributes data when the percent beyond the specification limits is less than or equal to .003 (Cpk=1.33).
(k) Process or operation parameters under reduced or eliminated inspection or testing that undergo a break in production less than 6 months in length, may continue to operate under reduced or eliminated inspection or testing provided there has been no degradation below a Cpk of 1.33 (2.0 for criticals). Any break in production greater than 6 months shall require resubmission of the request for reduction or elimination of inspection or testing through the same channels cited in paragraph (g) above.
(1) Not used.
(m) Immediately following a change to a process or operation parameter under reduced or eliminated inspection, the process capability
(Cp) or process performance indexes (Cpk) shall be recalculated and documented for variable data; the grand average fraction defective shall be recalculated for attribute data. If any of these values have deteriorated, immediate notification shall be made to the
Government along with the associated documentation. Return to original inspection and test requirements may be imposed as stipulated in paragraph n below.
(n) The Government reserves the right to withdraw authorization to reduce or eliminate final acceptance inspection or testing and direct the Contractor to return to original contract inspection or test procedures at any indication of loss of process control or deterioration of quality.
Part II Detailed requirements pertaining to plan submittal
In accordance with DD Form 1423 and Part I of this section, the following supplemental information shall be considered and used when designing your general and detailed SPC plans.
7 20
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
1.0 General Management Plan
This section shall define managements SPC responsibilities and involvement and shall include managements commitment to continuous process improvement. The plan shall embrace a total commitment to quality and shall be capable of standing on its own merit.
1.1 Policy/Scope:
Describe the Contractors policy for applying SPC, including goals and management commitment to SPC.
1.2 Applicable Document:
List documents that are the basis for the contractors SPC program (i.e., ANSI standard, textbooks, Government documents).
1.3 SPC Management Structure:
Define the SPC management structure within the organization. Identify and include interrelationships of all departments involved in SPC
(i.e., Production, Quality, Engineering, Purchasing, etc.) Identify by job title or position all key personnel within departments involved in the application of SPC. Describe which functions are performed by key personnel and when these functions are performed
(i.e., include personnel responsible for performing inspections/audits, charting and interpreting data; personnel responsible for determining, initiating and implementing corrective action upon detecting assignable causes, etc.)
1.4 SPC Training:
Identify by job title or position the primary individual responsible for overseeing that SPC training is accomplished. Describe the qualification program required and in use for all personnel utilizing SPC techniques, including the qualification of trainers. Identify who is to be trained and the type, extent and length of such training (i.e., on-the-job, classroom, etc.). Identify when refresher training is required and how personnel using SPC techniques are monitored.
1.5 Manufacturing Controls:
Identify the criteria for performing SPC gage capability studies and describe how and when these studies are applied. Repeatability and accuracy of gages should be addressed.
1.6 Determination of SPC Use:
Describe how the process/operation parameters are determined appropriate for SPC application and explain what actions are taken if SPC is not deemed appropriate for critical, special and major process/operation parameters (i.e., Pareto analysis; analysis of characteristics with tight tolerances, etc.)
1.7 Process Stability and Capability:
a. Identify the criteria for performing process capability studies and describe how and when these studies are applied. Describe how the process capability index is calculated and include the frequency of these calculations. Describe what actions are taken as a result of each process capability study. Describe the contractors methodologies when process capability is for variable and attribute data. To determine a capable process, the process/operation parameters shall meet the following requirements:
(1) Variable Data. Process capability (Cp) shall be determined. Process performance index shall be greater than or equal to 1.33
(Cpk). For critical parameters/characteristics, the process performance index shall be greater than or equal to 2.0 (Cpk).
(2) Attribute Data: Process capability/performance shall be the percent beyond the upper/lower specification limit less than or equal to .003 percent (Cpk=1.33).
b. Describe what actions will be taken if process/operation is sub-marginal or marginal. (Cpk less than 1.33 or 2.0 for criticals) or grand average fraction defective is greater than .003 percent).
c. Include analysis of statistical distributions and define all formulas and symbology utilized.
1.8 Control Chart Policy:
a. Type of charts to be used (i.e., x bar/R x bar/S, etc.) and rationale for use; the criteria for selection of sample size, frequency of sampling and rational subgroups.
b. Procedures for establishing and updating control limits, including frequency of adjustments.
c. Criteria for determining out-of-control conditions (i.e., trends, points beyond control limits, etc.) and the corrective action taken; to include failure analysis when the process is unstable or when nonconforming product has resulted from unstable processes.
Illustrate out-of-control tests.
d. Describe the method of recording pertinent facts on control charts such as changes in raw materiel, machines, manufacturing methods and environment, and corrective actions taken and describe how control charts are traceable to the product.
1.9 Vendor/Subcontractor Purchase Controls:
Identify whether suppliers are required to utilize SPC and describe the extent the vendors policies and procedures are consistent with
8 20
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
in-house procedures of the prime contractor. Describe the following: methods utilized to determine that suppliers have adequate controls to assure defective product is not produced and delivered; the system utilized to audit suppliers, what will be audited and how often; what action will be taken when out-of-control conditions exist at subcontractor/vendor facilities.
1.10 SPC Audit System:
At a minimum, the contractors SPC Audit System shall consist of auditing compliance with the planned arrangements specified in the general and detailed SPC plans followed by a review and analysis of the outcome to include implementation of necessary corrective action.
1.11 SPC Records:
Identify various records to be used in support of SPC and describe their use. Identify retention periods.
2.0 Detailed Plan:
This section shall detail specific manufacturing process/operation parameters under control.
2.1 Control of Process/Operation Parameters or Characteristics:
a. Identify the following for each process/operation by name or characteristic under control:
(1) Identify process/operation by name or characteristic and provide rationale for selection; justification for non-selection if the parameter or characteristic is identified as critical, special and/or major.
(2) Describe how the characteristic is produced; the chain of events, type and number of machines involved, location of manufacturing facility, tolerances maintained, etc.
(3) Production and inspection machinery used. Include the production rate, number of shifts and length of shifts plus whether inspection is fully or semi-automatic or manual. If manual, identify the type of gages in use.
(4) Identify the type of charts to be maintained and whether the process/operation is performed in-house or subcontracted out;
identify facility/vendor where process/operation parameters are targeted for SPC.
2.2 Reduction or Elimination of Inspection/Test: The Procuring Contracting Officer (PCO) will accept submissions of requests for reduction or elimination of final acceptance inspection/testing when the SPC contract requirements are met. Each request shall contain and/or address the following: control charts documenting twenty (20) consecutive production shifts or more for the same process/operation parameter under control; type of control chart utilized; control chart limits and process average or grand average fraction defective (as applicable); definition of out-of-control condition and corrective actions taken during out-of-control conditions; specification and part number.
6. REWORK AND REPAIR OF NONCONFORMING MATERIAL
(a) Rework and Repair are defined as follows:
(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.
(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.
(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the
Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QARs disapproval.
(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, DD Form 1694, to the
Contracting Officer for review and written approval prior to implementation.
(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.
(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data
Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.
(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.
9 20
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
7. DESTRUCTIVE TESTING
(a) All costs for destructive testing by the Contractor and items destroyed by the Government are considered as being included in the contract unit price.
(b) Where destructive testing of items or components thereof is required by contract or specification, the number of items or components required to be destructively tested, whether destructively tested or not, shall be in addition to the quantity to the delivered to the
Government as set forth in the Contract Schedule.
(c) All pieces of the complete First Article shall be considered as destructively tested items unless specifically exempted by other provisions of this contract.
(d) The Contractor shall not reuse any components from items used in a destructive test during First Article, lot acceptance inprocess testing, unless specifically authorized by the Contracting Officer.
(e) The Government reserves the right to take title to all or any items or components described above. The Government may take title to all or any items or components upon notice to the Contractor. The items or components of items to which the Government takes title shall be shipped in accordance with the Contracting Officers instructions. Those items and components to which the Government does not obtain title shall be rendered inoperable and disposed of as scrap by the Contractor.
8. MEASUREMENT SYSTEM EVALUATION
(a) Definitions. This paragraph defines specific terms utilized throughout the rest of this section and in the accompanying Contract
Data Requirements List (CDRL) and Data Item Description (DID). This aids in clarifying the MSE requirements to Government and contractor personnel.
(1) Acceptance Inspection Equipment (AIE). All equipment (includes AAIE defined below), special and standard, including dimensional gages, measuring equipment, test fixtures, electronic and physical test equipment, and other test equipment used for examination and test of a product to determine conformance to the Technical Data Package (TDP) which may include drawings and specifications (e.g., Detail, Performance, Weapon specifications, and QAPs).
(2) Automated Acceptance Inspection Equipment (AAIE). AIE in which the inspection and acceptance determination of the product is performed, in whole or in part, in an automatic manner.
(3) Contractor Inspection Equipment. Government-approved equipment utilized by the contractor to perform examination and tests to assure conformance to contract requirements.
(4) Commercial Inspection Equipment. Industry-developed inspection equipment of universal application, without limitations to a specific part or item, which is advertised or cataloged as available to the trade or to the public on an unrestricted basis at an established price. Examples follow:
(i) Standard Test Equipment. Multiusage equipment that is specific to a function rather than to an item. It includes such items as hardness testers, tensile strength testers, meters, weighing devices, standard gear testers, ohmmeters, voltmeters, and oscilloscopes.
(ii) Standard Measuring Equipment (SME). Multipurpose equipment and standards used for performing measurements. It includes such items as micrometers, rulers, tapes, height gages, and protractors, etc. Standards include visual inspection equipment such as scratch and dig standards, surface finish comparator, color standards (FED-STD-595), etc.
(5) Nondestructive Testing. The development and application of technical methods to examine materials or components in ways that do not impair future usefulness and serviceability in order to detect, locate, measure and evaluate flaws; to assess integrity, properties and composition; and to measure geometrical characteristics. NDT includes Radiography/Radioscopic, Ultrasonic, Eddy Current, Magnetic
Particle, and Liquid Penetrant.
(6) Measurement System Analysis (MSA). Per ASTM E2782 (Standard Guide for MSA), paragraph 3.1.7, MSA is any of a number of specialized methods useful for studying a measurement system and its properties.
(b) Scope. This section establishes requirements for design, supply, performance, and maintenance of AIE used for product inspection and acceptance. In addition, this section establishes requirements for the preparation, submission, and approval of AIE documentation.
(c) AIE. The contractor shall provide all AIE necessary to ensure conformance of components and end-items to contract requirements.
AIE shall include inspection, measuring, and test equipment whether Government furnished or contractor furnished (including commercially acquired) along with the necessary specifications and procedures for their use (see ISO 10012, paragraph 6.2.1). The AIE shall not
10 20
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
create or conceal defects on the product being inspected. All AIE documentation shall contain sufficient information to permit evaluation of the AIEs ability to test, verify, and/or measure the applicable characteristics or parameters (see applicable DID referenced in DD Form 1423).
(d) AIE Designs & Government Furnished Gages. AIE designs are of two types Government designs (see (d)(1)) and contractor designs (see
(d)(2)). When applicable, Government designs or Government furnished gages are designated in the TDP/contract; responsibility for all other AIE is assigned to the contractor. The designs, associated inspection procedures, and theory of operation shall have the level of detail to demonstrate capability of the proposed AIE to perform the required inspection.
(1) Government AIE Designs. Government AIE designs may consist of detailed drawings necessary for the fabrication and use of the
AIE. Unless otherwise specified, the contractor may submit alternate or modified contractor designs of Government AIE designs.
(2) Contractor AIE Designs. Contractor AIE design drawings shall meet the requirements of ASME Y14.100, ASME Y14.5 and ASME Y14.43 and may include commercial inspection equipment. [Commercial inspection equipment is defined as shown in paragraph (a)(4) above. It shall be fully described by catalog listings or other means which provide sufficient information to permit identification and evaluation by the Government and may include illustrations and engineering data.] Designs shall be submitted for any special fixture(s) to be used. Unless otherwise specified, Gage Tolerancing Policy shall be in accordance with ASME Y14.43, Absolute Tolerancing (Pessimistic
Tolerancing).
(3) Visual Inspection. Visual inspection standards used for the acceptance/rejection of product shall be submitted for approval.
(e) AIE Package Submittals. The contractor shall prepare the AIE package submittal in accordance with the DID referenced in the applicable Contract Data Requirements List (CDRL DD Form 1423). In addition, the contractor shall adhere to the following requirements:
(1) Designs for Approval. Contractor designs and/or the submission for the use of Government designs shall be approved by the
Government. Partial submission of AIE designs is permissible in order to expedite the approval process; however, the response date for design review will be based on the date of the final complete submission of designs.
(2) Correspondence in English. The contractor shall ensure all AIE correspondence and documentation are submitted in English.
(3) Units of Measurement. The units of measurement within the AIE package submittal shall be consistent with the requirements of the Technical Data Package (TDP).
(4) AIE Flow Down. The contractor shall flow down AIE requirements to sub-contractors at any tier who are performing acceptance inspections.
(f) Characteristics for Inspection. AIE documentation for Critical, Special, and Major characteristic inspections shall be submitted to the Government for approval in accordance with (IAW) the CDRL (see DD Form 1423). AIE for Minor characteristic inspections shall be submitted to the Government for approval IAW CDRL (see DD Form 1423) and as required below:
(1) [X ] Listed Minor (characteristics displayed on specifications and/or drawings
(2) [ ] Government selected list (as attached or as provided herein):
(3) [ ] Not submitted
(g) Automated Acceptance Inspection Equipment. The AAIE shall accept only conforming material. All characteristics requiring AAIE per the TDP shall utilize inspection equipment with a minimum demonstrated reliability of 99.8% at a 90% confidence level to detect non-conforming material unless otherwise specified below.
(1) Reliability of ___99.8__% at a ___90__% Confidence Level for Critical/Special Characteristics
(2) Reliability of ____99.0_% at a __90___% Confidence Level for Major Characteristics
(3) For inspection of major and minor characteristics where contractor utilizes AAIE when it is not required by the TDP, the AAIE package shall be submitted to the Government for approval. If the Minor characteristic is not listed in paragraph (f)(2) or not required for submittal in paragraph (f)(3), then the AAIE requirements (e.g., verification, calibration, prove-out, etc.) of the inspection shall still be performed.
(4) All AAIE packages submitted to the Government for approval shall be in accordance with MIL-A-70625 (Automated Acceptance
Inspection Equipment Design, Testing and Approval of). Furthermore, the contractor shall be responsible for producing the acceptance and rejection verification standards/masters representative of the characteristics the AAIE is designed to inspect. The verification standards and frequency of use require Government approval prior to use.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .