This document contains an amendment to a solicitation for the replacement of natural gas lines and gauges at Pine Bluff Arsenal in Pine Bluff, Arkansas. The U.S. Army Contracting Command - Rock Island issued the two-step sealed bid solicitation seeking a firm fixed price contract as a 100% small business set aside. The amendment provides answers to questions from industry regarding technical requirements such as the placement of service regulators, whether lift and lay or filling of abandoned lines will be required, and the power supply for smart meters. No changes were made to the response deadlines for the technical proposals in step one of 28 May 2021 or the price bid deadline in step two of 21 June 2021. The points of contact are identified for any additional questions.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Answ er Questions
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-May-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W52P1J21B3000
X 9B. DATED (SEE ITEM 11)
30-Apr-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-May-2021
CODE
ARMY CONTRACTING COMMAND - ROCK ISLAND
3055 RODMAN AVENUE
ROCK ISLAND IL 61299-8000
W52P1J 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W52P1J21B3000
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
QUESTIONS AND ANSWERS 02
1. The purpose of Amendment 0002 is to answer questions received for industry.
43 Original Question: Can all service regulators be located on the meter settings?
43 Original Answer: Can you be more specific?
43 New/Added Info/Question: Services have regulators to cut the pressure from 45 psig to either 2 psig or 7” water column for the “domestic” use. PBA does not indicate a standard of where service regulators are placed. Federal regulations require regulators protected from damage. The safest, and aligned with industry would be to place the regulation at the meter setting in lieu of the tap location by streets/walkways.
43 New Answer: Service regulators can be placed at meter settings.
48 Original Question: Do any areas require lift and lay?
48 Original Answer: Can you be more specific?
48 New/Added Info/Question: In the industry there are times where the utility operators do not wish to leave the abandoned facility in the ground due to specific concerns they may have. In those events, the facility is dug up, removed and a new line is placed.
48 New Answer: Lift and lay will not be required by PBA.
56 Original Question: Where is the power supply for meter operations coming from?
56 Original Answer: Can you be more specific?
56 New/Added Info/Question: The literature provided for the smart meter requires electric. If the capabilities of the meter requiring electric are not being used by PBA, then no electric is required. If it will be used, then the bidders will need to know the specifics on the electric supply so it can be included in the technical approach and safety planning.
56 New Answer: PBA does not intend to utilize the smart capabilities at this time; therefore, no electric required.
60 Original Question: What is the procedure for abandoning facilities?
60 Original Answer: Can you be more specific?
60 New/Added Info/Question: When new gas plant facility is commissioned, some natural gas pipeline operators may go above 49 CFR 192.727 abandonment or deactivation of facilities with procedures to fill the line being abandoned with inert material. It is not required by regulation to do this, but if PBA wants the abandoned lines filled, that is a requirement for bidding purposes. If no specific requirements, 49 CFR
W52P1J21B3000
192.727would be followed for the abandonment or deactivation of facilities to ensure federal regulations are adhered to.
60 New Answer: No fill will be required for abandoned facilities, follow the normal procedure for abandonment.
2. The deadline for Technical Proposals (Step-One) remains unchanged at: 28 May 2021 @
2:00 PM CT
3. The POCs are Megan Kirby, Contract Specialist at Megan.m.kirby.civ@mail.mil and Elizabeth Zaharopoulos, Contracting Officer at Elizabeth.w.zaharopoulos.civ@mail.mil
The following have been deleted: