W52P1J-21-B-3000-0001.pdf
PDF 405 KB Posted
- Attached to
- Natural Gas Line Replacement at PBA
- Solicitation number
- W52P1J21B3000
About this file
This document includes an amendment to a solicitation for a natural gas line replacement project at Pine Bluff Arsenal in Pine Bluff, Arkansas. The U.S. Army Contracting Command - Rock Island issued an invitation for bid seeking a firm fixed price contract to replace natural gas lines and gauges located at the arsenal in accordance with the attached scope of work. Interested vendors must register for a mandatory site visit by 6 May 2021 and submit any questions from the visit by 13 May 2021. Technical proposals for step one are due by 28 May 2021, with price bids for step two due by 21 June 2021 and bid opening scheduled for 22 June 2021. The solicitation is a 100% small business set aside, and it is anticipated that a single award will be made to the responsive, responsible bidder offering the lowest priced technically acceptable bid.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Answ er Questions from Site Visit
1. CONTRACT ID CODE PAGE OF PAGES
1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-May-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W52P1J21B3000
X 9B. DATED (SEE ITEM 11)
30-Apr-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-May-2021
CODE
ARMY CONTRACTING COMMAND - ROCK ISLAND
3055 RODMAN AVENUE
ROCK ISLAND IL 61299-8000
W52P1J 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W52P1J21B3000
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
QUESTIONS AND ANSWERS
1. The purpose of this Amendment is to answer questions received for industry.
Question Answer 1 Will we need to use tracer wire? If so, can you provide a spec on it?
See SOW items 5 and 9
2 Do bore casings have to be vented? See SOW item 12 3 Can directional boring be done in grass areas? See SOW item 7 4 Do all roadways or parking lots being bored have to be sleeved?
Yes
5 If roadway/parking lot bores must be sleeved, can SDR11 poly be used as a sleeve 2” pipe sizes larger? Or does it need to be sch 40 wrapped pipe?
Must use steel wrapped sch 40 pipe
6 Will concrete valve pads be required at tie-ins? No 7 Will gas markers be required on laterals like on existing gas main?
No
8 Will PBA provide BTU loads for new gas meters per buildings?
See SOW item 2
9 Who will be responsible for relighting? PBA 10 Per scope of work page 2, #18 Contractor shall replace existing gas meters with smart meters at the buildings identified in Appendix A per PBA standard installation and manufacturer’s recommendations. Per this Appendix, are these the only meters we are replacing?
Those are the only meters being replaced
11 When covering disturbed ground, is it the Government’s intent that grass seed can be used? Or is hydroseeding or sod required?
See SOW item 14
12 Will one call have access to base? See SOW item 3 13 If not, will contractors line locator be granted to suit the base needs for hooking up to existing lines and tracing them?
See SOW item 3
14 Will contractors be able to get water from base?
Overhead filling station north of tracks already hooked up and being used would be ideal, if not there, may contractor use fire hydrants?
Yes, water can be obtained on post if needed
15 It states in contract documents to dispose of all material on base in designated area. Concerning tailings from drilling and hydro vac, do we need to set up containment or dig a pit?
See SOW "Conditions: Disposal of Excess Removed Materials"
16 May we get a DWF version of prints (read only file for AutoCAD document)? If not, may we get a more detailed set of prints blowing up areas pertaining to work eliminating confusion and guessing on supplied PDF’s?
AutoCAD files will not be provided
17 With conditions of existing asphalt, may cold patch be used for replacing cuts in asphalt?
Cold patch can not be used
18 When core drilling roads and parking lots being drilled to identify existing buried utilities depths what type of plate and design of said plate would base like used to cover hole until filled and asphalt is patched?
Core drilling in pavements will not be permitted
19 May flow fill be used to fill in said holes for daylighting aforementioned core drills?
Core drilling in pavements will not be permitted
20 More detailed dwg’s would be nice for clearer understanding of tying in new to existing lines, will these be made available to contractor?
Detailed site maps cannot be provided until post-award
21 Do you need budgetary quotes at this time? I see the line sizes in Appendix A but without pressure and flow rates contractor would be forced to quote just a line size meter for budgetary purposes.
Budgetary quotes are not required at this time
22 Buildings with multiple line sizes listed would there be a meter at each line size?
Yes
23 SOW, bottom page 4, #3: Company has recently tested for and applied for Licensure as is defined below but we are a few weeks away from that being completed. Once we have that would it be enough to meet the requirement as listed above? Would our Subs then fall under us? Any input/direction you can provide would be very helpful. In the meantime, we will investigate the use of local contractors but Company is very serious about quality of work, safety, and timeliness and would feel more confident and secure with proven Subcontractors.
Page 4 item #3 requires the selected vendor to obtain all licenses and certifications required by applicable environmental agencies in order to ensure compliance of this project to federal, state, and local environmental laws and regulations. It will be the duty of the vendor to determine which, if any, licenses, certifications, and permits are required for the performance of this work.
All required licenses for the performance of this contract shall be provided prior to the start of construction.
24 Please provide the building number that corresponds to the building letters referenced in Appendix A.
Building numbers will only be provided post-award
25 Are parking lot areas permitted to be open cut? See SOW item 8
26 Are electrical conduit locations for parking lot site lighting known and will they be provided to the successful bidder?
See SOW item 3
27 If hard surfaces are required to be disturbed due to safe installation concerns, is there a standard drawing for hard surface repairs?
See SOW item 8
28 Are the footages shown in Attachment A estimates for both new main and new services?
See SOW "General Statement of Work"
29 If no external meters were found, but Attachment A indicates to replace the meter, is it to be assumed there is a meter on the inside of the building? If not, will a new meter setting need to be installed on the exterior of the building?
If no meter is present a new meter should be installed
30 Has the mainline been cleaned prior to placing in service with a pipeline inspection gauge (PIG)?
Yes
31 Has there been known contaminants in the mainline?
No
32 Is there a filter separator at the interconnect for the system?
No known filters on laterals
33 What is the maximum allowable operating pressure (MAOP)?
45 psi
34 Can other materials that meet codes and standards be substituted? In our experience, HDPE is reserved for anything greater than 60 psig. Is it acceptable to utilize PE pipe on anything under 60 psig?
See SOW item 6
35 Are any meters located inside buildings? No 36 Are any service line regulators located inside buildings?
No
37 If meters are to be relocated to meet current standards, will the piping downstream of the meter be required to be updated by the awardee?
Lines downstream of meter to be tied into building at existing location
38 Are the lines downstream of the meter outlet to be tested?
No
39 Prior to placing into service, if test on piping downstream of the meter fails, what are the next steps for the awardee?
N/A
40 Are the existing non-gas utilities mapped and can those maps be provided?
Maps will not be provided, see SOW item
41 Will the base map utilized in the PBA Master Plan Drawings be provided to the Awardee in AutoCAD format?
No
42 On Sheet 6 of 11, there is not a Building “P” identified, while it is identified in Attachment A.
Please clarify.
Building is listed in Appendix A in error.
Disregard Building P
43 Can all service regulators be located on the meter settings?
Can you be more specific?
44 Do you have a standard detail for meter protection?
No
45 Have all easements been obtained? See SOW item 2 46 Are all railroads Government owned? Or
Privately Owned?
All rail is government owned
47 Are there any special permitting requirements for railroad crossings?
No
48 Do any areas require lift and lay? Can you be more specific?
49 Is tracer wire to be included? See SOW items 5 and 9 50 Can HDD be utilized in areas other than road and rail crossings?
See SOW item 7
51 Referring to Item 11 in Attachment 001, is it the requirement to contact the COR for all service tie-ins?
See SOW item 11
52 Is it desired to have the meters grounded? Yes 53 Are there areas of previously documented contaminated soils in any of the areas indicated on the drawings?
Yes, there is documentation of contaminated soil near Building B
54 Is the contractor responsible for relocating pipe downstream of the meter outlet when the meter will require relocation due to manufactures safe operation requirements?
Contractor to tie into existing location
55 Will PBA resources need training with operating the Smart Vortex Flowmeter and is the contractor responsible for providing the operations training?
No
56 Where is the power supply for meter operations coming from?
Can you be more specific?
57 Are the remnants of drilling fluids able to be disposed of on PBA’s facilities?
Yes
58 If steel pipe is to be abandoned, are PCB tests to be performed?
No
59 What is the proper procedure to followed if pipeline fluids are encountered during any tie-in activities?
Any issues need to be brought to the attention of the COR
60 What is the procedure for abandoning facilities? Can you be more specific?
61 Do abandoned facilities need to be purged to
0% gas?
Yes
2. Technical Proposals (Step-One) Closes – 28 May 2021 @ 2:00 PM CT
3. The POCs are Megan Kirby, Contract Specialist at Megan.m.kirby.civ@mail.mil and
Elizabeth Zaharopoulos, Contracting Officer at Elizabeth.w.zaharopoulos.civ@mail.mil
(End of Summary of Changes)