This Contract Data Requirements List (CDRL) outlines eleven data items required under a contract to produce M548 metal ammunition containers for the Department of the Army Materiel Command Joint Munitions Command. The data items include a Quality Program Plan due 150 days after award, a Measurement System Evaluation package due 120 days after award, a First Article Test Plan due 120 days after award, a First Article Test Report due 180 days after award but no more than 30 days after testing, and Lot Acceptance Test Reports due 30 days after testing completion. Also required are a Failure Summary and Analysis Report due 10 days after a failure and 30 days after root cause analysis, a Quality Audit Schedule due 30 days after award, and updates to previously submitted plans and reports. Responses to submissions are due within 30 days for the Government.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-
(Data Acquisition Documentation No.)
Form Approved OMB No. 0704-
Form Approved OMB No. 0704-
DD Form 1423-1, FEB 2001 Previous editions may be used. Page: of
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP____________ TM____________ OTHER____________
D. SYSTEM/ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A00
2. TITLE OF DATA ITEM
TEST PROCEDURE
3. SUBTITLE
PRE-PRODUCTION PROCEDURE --Phosphate Coating
17. PRICE
GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80603A
5. CONTRACT REFERENCE
TT-C-490, TYPE 1, PARAS 3.2.1, 3.2.2
6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ
XX
9. DIST
STATEMENT
REQUIRED
N/A
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
ASREQ
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION
N/A
Draft
Final
Reg Repro
16. REMARKS 0 1
0 1
INSTRUCTIONS FOR COMPLETING DD FORM 1423
FOR GOVERNMENT PERSONNEL FOR THE CONTRACTOR
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support. Item E. Self-explanatory (to be filled in after contract award). Item F. Selfexplanatory (to be filled in after contract award). Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data. These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required.
The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423 (BACK)
G. PREPARED BY
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Designed using Perform Pro, WHS/DIOR, Aug 96
MISC
A005 Quality Program Plan (QPP) N/A
DI-QCIC-81722 (Current Revision) Section: E AMSJM-QA
LT
B
ONE/R 150DAC
A N/A ASREQ
PCO 0 1 0
PQM 0 1
BLK 12: Quality Program Plan (QPP) shall be submitted no later than 150 calendar days after contract award. The Government shall provide response within 30 calendar days of initial submission. If further revisions are necessary, the Contractor shall have 15 calendar days to provide revisions and the Government shall provide response within 15 calendar days. Approval is required prior to first article test (FAT), if FAT is required, or prior to initiation of production. Disposition will be provided by the Procuring Contracting Officer (PCO).
BLK 13: Submit updates/revisions for review and approval prior to implementation.
BLK 14: Submit via email or SAFE https://safe.amrdec.army.mil/safe/Welcome.aspx Specific email addresses for the distribution list will be provided after contract award.
0 2 0
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Designed using Perform Pro, WHS/DIOR, Aug 96
QCIC
A006 Measurement System Evaluation (MSE) – Measurement and Inspection Equipment System Design Documentation for Acce
Measurement System Evaluation/Acceptance Inspection Equipment (MSE/AIE)
DI-QCIC-81960 (Current Revision) Section: E AMSJM-QA
DD
B
ONE/R 120DAC
A N/A ASREQ
BLK 12: The Contractor shall submit a completed AIE package no later than
(120) calendar days after contract award. The AIE shall be approved prior to First Article Testing (if First Article Testing is required), production, and/or all acceptance of product under the contract. The PCO will provide disposition within (45) calendar days of final AIE package receipt.
BLK 13: If further revisions are necessary, the Contractor shall have (30) calendar days to generate them and the Government shall have (30) calendar days to review and respond to them. The approved AIE shall be available for First Article Testing (if First Article Testing is required), production, and/or all acceptance of product under the contract.
If Contractor revises a previously Government accepted AIE for this contract, the revised AIE must be submitted to the Government for review and approval.
Approval must be granted before AIE is used for acceptance of product. The Government will respond within (30) calendar days.
The Contractor shall notify the responsible Government technical agency a minimum of (30) calendar days prior to acceptance (prove out) testing for AAIE.
BLK 14: Submit via email or SAFE https://safe.amrdec.army.mil/safe/Welcome.aspx.
Specific email addresses for the distribution list will be provided after contract award.
An MSE Review Guide is available to assist Contractors on the ARDEC Public Website (http://www.ardec.army.mil/organizations/QESA/) in the application of the MSE Clause. The MSE Review Guide's content, in its entirety, is provided solely for REFERENCE and GUIDANCE PURPOSES ONLY- it is not, nor is it intended to be, contractually binding. Accordingly, the information contained within the MSE Review Guide is expressly not, nor shall it be construed to be, incorporated either directly or by reference into the terms of the MSE clause itself nor into the terms and conditions of any underlying contract which contains the MSE clause.
PCO 0 1 0
PQM 0 1 0
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Designed using Perform Pro, WHS/DIOR, Aug 96
NDTI
A007 First Article Qualification Test Plan and Procedure N/A
DI-NDTI-81307 (Current Revision) Section: E AMSJM-QA
LT
B
ASREQ 120DAC
A N/A ASREQ
PCO 0 1 0
PQM 0 1 0
BLK 12: First Article Test Plans shall be submitted no later than 120 calendar days after contract award. Government shall provide response within 30 calendar days of initial submission. If further revisions are necessary, the Contractor shall have 15 calendar days to provide revisions and the Government shall provide response within 15 calendar days.
Disposition will be provided by the procuring contracting officer (PCO).
Approval of the plan shall be obtained prior to FAT.
BLK 14: Submit via email or SAFE.
https://safe.amrdec.army.mil/safe/Welcome.aspx Specific email addresses for the distribution list will be provided after contract award.
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Designed using Perform Pro, WHS/DIOR, Aug 96
NDTI
A008 Test/Inspection Reports First Article Test Report (FATR)
DI-NDTI-80809 (Current Revision) Section: E AMSJM-QA
XX
B
ASREQ 180DAC
A N/A ASREQ
PCO 0 1 0
PQM 0 1 0
BLK 12: The First Article Test report shall be submitted with QAR findings on DD Form 1222. The FATR shall be submitted 180 calendar days after contract award and no later than 30 calendar days after completion of the FAT. The Government requires 30 calendar days for review. Disposition of the FAT report will be provided through the Procuring Contracting Officer.
If further revisions are necessary, the Contractor shall have 15 calendar days to provide revisions and the Government shall provide response within 15 calendar days. PCO approval of the FATR shall be obtained prior to start of production.
BLK 14: Submit electronically via email or SAFE https://safe.amrdec.army.mil/safe/Welcome.aspx.
Specific email addresses for the distribution list will be provided after contract award.
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Designed using Perform Pro, WHS/DIOR, Aug 96
NDTI
A009 Test/Inspection Reports Lot Acceptance Test Report
DI-NDTI-80809 (Current Revision) Section: E AMSJM-QA
NO
B
ASREQ 30DATC
N/A N/A ASREQ
QAR 0 1 0
BLK 10/12: Lot Acceptance Test Reports (LATRs) shall be submitted for each lot and contain conformance testing results IAW the item specification and
MIL-STD-1916.
LATRS shall be submitted 30 calendar days after completion of LAT.
0 1 0
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Designed using Perform Pro, WHS/DIOR, Aug 96
SESS
A010 Failure Summary and Analysis Report N/A
DI-SESS-80255 (Current Revision) Section: E AMSJM-QA
LT
B
ASREQ ASREQ
A N/A ASREQ
PCO 0 1 0
PQM 0 1
BLK 10/12/13: Contractor shall notify the the addressee list in block 14 via email within 24 hours after the occurrence of a failure during acceptance testing, including but not limited to, any failures during FAT/LAT and any destructive/nondestructive test failures. Formal submittal shall be no later than 10 calendar days after reported failure. Final report shall be submitted no later than 30 calendar days after determining/conducting root cause/failure analysis.
The Government will provide a response within 15 calendar days of initial submission. If further revisions are necessary, the contractor shall have 15 calendar days to provide revisions. Disposition will be provided by the procuring contracting officer (PCO).
BLK 14: Submit via email or SAFE.
https://safe.amrdec.army.mil/safe/Welcome.aspx Specific email addresses for the distribution list will be provided after contract award.
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Designed using Perform Pro, WHS/DIOR, Aug 96
SESS
A011 Quality Audit Site Visit Schedule N/A
DI-SESS-81925 (Current Revision) Section: E AMSJM-QA
NO
N/A
ASREQ 30DAC
A N/A ASREQ
PCO 0 1 0
PQM 0 1
BLK 10/12/13: Contractor shall provide a schedule of all supplier/vendor audits within 30 calendar days after contract award. The Contractor shall notify the USG 15 days prior to a scheduled audit and the USG will advise whether or not it plans to witness the audit.
BLK 14: Submit via email or SAFE https://safe.amrdec.army.mil/safe/Welcome.aspx Specific email addresses for the distribution list will be provided after contract award.
PQM – Product Quality Manager
PCO – Procuring Contracting Officer
QAR – Quality Assurance Representative
DA – Design Agent (NAVSEA)
PL – Project Lead (NAVAIR)
NQA – Navy Quality
ME – Material Engineer (NAVAIR)
PE – Program Engineer (Air Force)
AEA – Acquisition Engineering Agent (NAVSEA) GE – Gage Engineer
Production Manager
MCEA – Marine Corp Engineering Activity
CDM – Configuration/Data Management (NAVAIR)
FOR GOVERNMENT PERSONNEL FOR THE CONTRACTOR
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award). Item F. Self-explanatory (to be filled in after contract award). Item G. Signature of preparer of
CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data. These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required.
The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423 (BACK)
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
INSTRUCTIONS FOR COMPLETING DD FORM 1423
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
File details come from the government source that posted it. Updated .