Attachment 0008 - Quality Requirements SOW

View the file

Other files

File Type Posted
W52P1J18R0089-0004.pdf PDF
ATTACHMENT 0014 - Q&A_14NOV2019.docx.pdf PDF
ATTACHMENT_0014_-_Q&A_6NOV2019.pdf PDF
W52P1J18R0089-0003.pdf PDF
ATTACHMENT_0014_-_Q&A_30OCT2019.pdf PDF
W52P1J18R0089-0002.pdf PDF
ATTACHMENT_0014_-_Q&A.pdf PDF
W52P1J18R0089-0001.pdf PDF
B08_-_ATTACHMENT_0007_-_OPSEC_PLAN_SAMPLE.pdf PDF
B08_-_ATTACHMENT_0006_-_OPSEC_SOW.pdf PDF
Exhibit_D_-_CDRL_-_CNU417E_Container.pdf PDF
W52P1J18R0089.pdf PDF
B08_-_ATTACHMENT_0012_-_Small_Business_Participation.pdf PDF
B08_-_ATTACHMENT_0002_-_Instructions_for_Form_DD1423.pdf PDF
B08_-_ATTACHMENT_0005_-_Address_Code_Distribution.pdf PDF
B08_-_ATTACHMENT_0010_-_Past_Performance_Questionnaire.pdf PDF
B08_-_ATTACHMENT_0013_-_LFAT_PART_NUMBERS.pdf PDF
B08_-_ATTACHMENT_0009_-_ASSIST_Instructions.pdf PDF
B08_-_ATTACHMENT_0003_-_Guidance_on_Documentation_of_CDRLS.pdf PDF
Exhibit_E_-_CDRL_-_MHU-212BE_Pallet.pdf PDF
Exhibit_A_-_CDRL_-_BLU-109_CB.pdf PDF
Exhibit_B_-_CDRL_-_BLU-109_B.pdf PDF
B08_-_ATTACHMENT_0011_-_Quality_Assurance_Provisions_(QAP)_BLU-109__REV_A_12_November_2013.pdf PDF
B08_-_ATTACHMENT_0001_-_Price_Matrix_10SEPT2019.xlsx XLSX spreadsheet
Exhibit_C_-_CDRL_-_BLU-109_AB.pdf PDF
B08_-_ATTACHMENT_0004_-_List_of_Addresses_for_CDRLs.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY REQUIREMENTS: INSPECTION, ACCEPTANCE, QUALITY ASSURANCE,

AND RELIABILITY

QA001 – MIL-STD-1916

The Department of Defense (DoD) Preferred Methods for this

Acceptance of Product, MIL-STD-1916, shall be used for this procurement action. All references to MIL-STD-105, MIL-STD-414, MIL-STD-1235, and ANSI Z1.4 appearing in the Technical Data

Package (TDP) are replaced by MIL-STD-1916. Verification Levels

(VL) shall replace AQLs and shall be VL IV for major characteristics and VL II for minor characteristics.

QA002 - STATISTICAL PROCESS CONTROL

Part I – General Statistical Process Control Requirements

(a) In addition to the quality requirements of the technical data package, the Contractor shall implement Statistical Process

Control (SPC) in accordance with a government accepted SPC

Program Plan. Control chart techniques shall be in accordance with the American National Standards Institute (ANSI) B1, B2 and

B3. Alternate SPC charting methods may be proposed and submitted to the Government for review.

(b) The SPC Program Plan developed by the contractor shall consist of a general plan and a detailed plan. The plans shall be structured as delineated on the Data Item Description referenced in the DD Form 1423. The general and the detailed plans shall be submitted to the government for review per DD

Form 1423 requirements. Notification by the Government of acceptance or nonacceptance of the plans shall be provided in accordance with the timeframes specified on the DD Form 1423.

Once a general plan for a facility has been approved by this

Command, the approval remains in effect for subsequent contracts as long as the contractual requirements remain substantially unchanged from contract to contract. Therefore, resubmission of a previously accepted general SPC plan is not required if current SPC contract requirements and Data Item Description

(DID) requirements are fulfilled. If this Command has previously accepted the general SPC plan under essentially the same SPC contractual requirements, so indicate by providing the

Contracting Officer with the following information:

Date of Acceptance ______________

Contract Number(s) ______________

(c) The contractor is responsible for updating the general plan to current SPC contractual requirements. If errors or omissions are encountered in a previously accepted SPC general plan, opportunities for improvement will be identified by the

Government, and corrective action shall be accomplished by the contractor.

(d) A milestone schedule will be submitted for those facilities who do not have, or have never had, a fully implemented SPC program and will not have a fully operational SPC program once production is initiated. The milestones shall provide a time phased schedule of all efforts planned relative to implementation of an SPC program acceptable to the Government. A milestone schedule shall include implementation start and complete dates for those SPC subjects addressed in the

Statistical Process Control requirement located in Part II of this section. The milestone schedule shall only include those actions that cannot be accomplished prior to first article or the initiation of production, if a first article is not required. Milestones shall be developed for each commodity identified for SPC application. Milestones shall be submitted through the Government Quality Assurance Representative to the

Contracting Officer for review and acceptance. Any deviations from the accepted milestones, to include justification for such deviations, shall be resubmitted through the same channels for review. The Government reserves the right to disapprove any changes to the previously accepted milestones. Notification by the Government of the acceptance or nonacceptance of the milestones shall be furnished to the Contractor by the

Contracting Officer.

(e) The Contractor shall review all process and operation parameters for possible application of SPC techniques. This review shall include processes and operations under the control of the prime contractor and those under the control of subcontractor or vendor facilities. A written justification shall be included in the detailed plan for each process and operation parameter that controls or influences characteristics identified as critical, special, or major which have been deemed impractical for the application of SPC techniques. A pamphlet on application of SPC for short production runs is available through the Contracting Officer.

(f) Statistical evidence in the form of control charts shall be prepared and maintained for each process or operation parameter identified in the detailed plan. These charts shall identify all corrective actions taken on statistical signal. During production runs, control charts shall be maintained in such a manner to assure product is traceable to the control charts. At the conclusion of the production run, a collection of charts traceable to the product, shall be maintained for a minimum of 3 years. The control charts shall be provided to the Government for review at any time upon request.

(g) When the process or operation parameter under control has demonstrated both stability and capability, the Contractor may request, in writing, through Administrative Contracting Officer

(ACO) and Contracting Officer (CO) channels to the Product

Assurance and Test Directorate, that acceptance inspection or testing performed in accordance with contract requirements be reduced or eliminated. Upon approval by the CO, acceptance shall then be based upon the accepted SPC plan, procedures, practices and the control charts.

(h) The Government will not consider requests for reduction or elimination of 100% acceptance inspection and testing of if any one of the following conditions exist:

(1) The existing process currently utilizes a fully automated, cost effective, and sufficiently reliable method of

100% acceptance inspection or testing for an attribute-type critical parameter or characteristic.

(2) The Contractor utilizes attribute SPC control chart methods for the critical parameter or characteristic.

(3) The critical parameter or characteristic is a first order, single point safety failure mode (nonconformance of the critical parameter or characteristic in and of itself would cause a catastrophic failure).

(i) The Government will only consider reduction or elimination of the 100% acceptance inspection or test requirement for other critical parameters or characteristics if either of the following conditions are met:

(1) The process is in a state of statistical control utilizing variable control chart methods for the critical parameter or characteristic under control and the process performance index (Cpk) is at least 2.0. The Contractor shall maintain objective quality evidence through periodic audits that the process performance index is being maintained for each production delivery.

(2) The critical parameter or characteristic is conclusively shown to be completely controlled by one or more process or operation parameters earlier in the process, and those parameters are in a state of statistical control utilizing variable data, and the product of the probability of the conformance for each earlier parameter associated to the critical characteristic is better than or equal to a value equivalent to that provided by a Cpk of at least 2.0. The

Contractor shall maintain objective quality evidence through periodic audits that the process performance indexes are being maintained for each production delivery.

(j) For characteristics other than critical, requests for reduction or elimination of acceptance inspection and testing shall be considered when the process performance index is greater than or equal to a Cpk of 1.33 for variables data.

Requests shall be considered for attributes data when the percent beyond the specification limits is less than or equal to

.003 (Cpk=1.33).

(k) Process or operation parameters under reduced or eliminated inspection or testing that undergo a break in production less than 6 months in length, may continue to operate under reduced or eliminated inspection or testing provided there has been no degradation below a Cpk of 1.33 (2.0 for criticals). Any break in production greater than 6 months shall require resubmission of the request for reduction or elimination of inspection or testing through the same channels cited in paragraph (g) above.

(1) Not used.

(m) Immediately following a change to a process or operation parameter under reduced or eliminated inspection, the process capability (Cp) or process performance indexes (Cpk) shall be recalculated and documented for variable data; the grand average fraction defective shall be recalculated for attribute data. If any of these values have deteriorated, immediate notification shall be made to the Government along with the associated documentation. Return to original inspection and test requirements may be imposed as stipulated in paragraph n below.

(n) The Government reserves the right to withdraw authorization to reduce or eliminate final acceptance inspection or testing and direct the Contractor to return to original contract inspection or test procedures at any indication of loss of process control or deterioration of quality.

Part II – Detailed requirements pertaining to plan submittal

In accordance with DD Form 1423 and Part I of this section, the following supplemental information shall be considered and used when designing your general and detailed SPC plans.

1.0 General Management Plan

This section shall define management’s SPC responsibilities and involvement and shall include management’s commitment to continuous process improvement. The plan shall embrace a total commitment to quality and shall be capable of standing on its own merit.

1.1 Policy/Scope:

Describe the Contractor’s policy for applying SPC, including goals and management commitment to SPC.

1.2 Applicable Document:

List documents that are the basis for the contractor’s SPC program (i.e., ANSI standard, textbooks, Government documents).

1.3 SPC Management Structure:

Define the SPC management structure within the organization.

Identify and include interrelationships of all departments involved in SPC (i.e., Production, Quality, Engineering, Purchasing, etc.) Identify by job title or position all key personnel within departments involved in the application of SPC.

Describe which functions are performed by key personnel and when these functions are performed (i.e., include personnel responsible for performing inspections/audits, charting and interpreting data; personnel responsible for determining, initiating and implementing corrective action upon detecting assignable causes, etc.)

1.4 SPC Training:

Identify by job title or position the primary individual responsible for overseeing that SPC training is accomplished.

Describe the qualification program required and in use for all personnel utilizing SPC techniques, including the qualification of trainers. Identify who is to be trained and the type, extent and length of such training (i.e., on-the-job, classroom, etc.).

Identify when refresher training is required and how personnel using SPC techniques are monitored.

1.5 Manufacturing Controls:

Identify the criteria for performing SPC gage capability studies and describe how and when these studies are applied.

Repeatability and accuracy of gages should be addressed.

1.6 Determination of SPC Use:

Describe how the process/operation parameters are determined appropriate for SPC application and explain what actions are taken if SPC is not deemed appropriate for critical, special and major process/operation parameters (i.e., Pareto analysis;

analysis of characteristics with tight tolerances, etc.)

1.7 Process Stability and Capability:

a. Identify the criteria for performing process capability studies and describe how and when these studies are applied.

Describe how the process capability index is calculated and include the frequency of these calculations. Describe what actions are taken as a result of each process capability study.

Describe the contractor’s methodologies when process capability is for variable and attribute data. To determine a capable process, the process/operation parameters shall meet the following requirements:

(1) Variable Data. Process capability (Cp) shall be determined. Process performance index shall be greater than or equal to 1.33 (Cpk). For critical parameters/characteristics, the process performance index shall be greater than or equal to

2.0 (Cpk).

(2) Attribute Data: Process capability/performance shall be the percent beyond the upper/lower specification limit less than or equal to .003 percent (Cpk=1.33).

b. Describe what actions will be taken if process/operation is sub-marginal or marginal. (Cpk less than 1.33 or 2.0 for criticals) or grand average fraction defective is greater than

.003 percent).

c. Include analysis of statistical distributions and define all formulas and symbology utilized.

1.8 Control Chart Policy:

a. Type of charts to be used (i.e., x bar/R x bar/S, etc.) and rationale for use; the criteria for selection of sample size, frequency of sampling and rational subgroups.

b. Procedures for establishing and updating control limits, including frequency of adjustments.

c. Criteria for determining out-of-control conditions (i.e., trends, points beyond control limits, etc.) and the corrective action taken; to include failure analysis when the process is unstable or when nonconforming product has resulted from unstable processes. Illustrate out-of-control tests.

d. Describe the method of recording pertinent facts on control charts such as changes in raw material, machines, manufacturing methods and environment, and corrective actions taken and describe how control charts are traceable to the product.

1.9 Vendor/Subcontractor Purchase Controls:

Identify whether suppliers are required to utilize SPC and describe the extent the vendor’s policies and procedures are consistent with in-house procedures of the prime contractor.

Describe the following: methods utilized to determine that suppliers have adequate controls to assure defective product is not produced and delivered; the system utilized to audit suppliers, what will be audited and how often; what action will be taken when out-of-control conditions exist at subcontractor/vendor facilities.

1.10 SPC Audit System:

At a minimum, the contractor’s SPC Audit System shall consist of auditing compliance with the planned arrangements specified in the general and detailed SPC plans followed by a review and analysis of the outcome to include implementation of necessary corrective action.

1.11 SPC Records:

Identify various records to be used in support of SPC and describe their use. Identify retention periods.

2.0 Detailed Plan:

This section shall detail specific manufacturing process/operation parameters under control.

2.1 Control of Process/Operation Parameters or Characteristics:

a. Identify the following for each process/operation by name or characteristic under control:

(1) Identify process/operation by name or characteristic and provide rationale for selection; justification for non-selection if the parameter or characteristic is identified as critical, special and/or major.

(2) Describe how the characteristic is produced; the chain of events, type and number of machines involved, location of manufacturing facility, tolerances maintained, etc.

(3) Production and inspection machinery used. Include the production rate, number of shifts and length of shifts plus whether inspection is fully or semi-automatic or manual. If manual, identify the type of gages in use.

(4) Identify the type of charts to be maintained and whether the process/operation is performed in-house or subcontracted out; identify facility/vendor where process/operation parameters are targeted for SPC.

2.2 Reduction or Elimination of Inspection/Test: The Procuring

Contracting Officer (PCO) will accept submissions of requests for reduction or elimination of final acceptance inspection/testing when the SPC contract requirements are met.

Each request shall contain and/or address the following: control charts documenting twenty (20) consecutive production shifts or more for the same process/operation parameter under control;

type of control chart utilized; control chart limits and process average or grand average fraction defective (as applicable);

definition of out-of-control condition and corrective actions taken during out-of-control conditions; specification and part number.

QA003 - REWORK AND REPAIR OF NONCONFORMING MATERIAL

(a) Rework and Repair are defined as follows:

(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR’s disapproval.

(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.

(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.

(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the

Technical Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.

(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.

QA004 - DESTRUCTIVE TESTING

(a) All costs for destructive testing by the Contractor and items destroyed by the Government are considered as being included in the contract unit price.

(b) Where destructive testing of items or components thereof is required by contract or specification, the number of items or components required to be destructively tested, whether destructively tested or not, shall be in addition to the quantity to the delivered to the Government as set forth in the

Contract Schedule.

(c) All pieces of the complete First Article shall be considered as destructively tested items unless specifically exempted by other provisions of this contract.

(d) The Contractor shall not reuse any components from items used in a destructive test during First Article, lot acceptance inprocess testing, unless specifically authorized by the

Contracting Officer.

(e) The Government reserves the right to take title to all or any items or components described above. The Government may take title to all or any items or components upon notice to the

Contractor. The items or components of items to which the

Government takes title shall be shipped in accordance with the

Contracting Officer’s instructions. Those items and components to which the Government does not obtain title shall be rendered inoperable and disposed of as scrap by the Contractor.

QA-005 - FIRST ARTICLE TEST (GOVERNMENT TESTING)

(a) The Government first article test shall consist of: ONE (1)

MHU 212 B/E Pallet (1 galvanized pallet): Per Spec Tech Spec-

PHST 201 REV-C Section 3.5 First Article; which shall be examined and tested in accordance with contract requirements, the item specification (s), the Quality Assurance Provisions

(QAPS) and drawings listed in the Technical Data Package.

(b) The first article shall be delivered to:

UIC: N38634

Naval Surface Warfare Center, Indian Head Explosive Ordnance Disposal Technology Division

Detachment Picatinny, Building 458, Whittemore Ave

Picatinny Arsenal, NJ 07806-5000

ATTN: Code G12 (Test and Evaluation)

Upon shipment of the first article, the contractor shall be responsible to send an e-mail to

NSWC_IHEODTD_G1_PHST_ISEA.FCT@NAVY.MIL, with the subject line:

FIRST ARTICLE SHIPMENT, TS-PHST-201C, PALLET, BOMB, SHIPPING AND

STORAGE, MHU-212B/E. The first article shall be delivered in accordance with the schedule provided by the contract or purchase order.

The first article shall be delivered by the Contractor Free on

Board (FOB) destination except when transportation protective service or transportation security is required by other provision of this contract. If such is the case, the first article shall be delivered FOB origin and shipped on Government

Bill of Lading.

(c) The first article shall be representative of items to be manufactured using the same processes and procedures as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package provided by the Government.

(d) Prior to delivery, each of the first article assemblies, subassemblies, and components shall be inspected by the

Contractor for all contract, drawing, QAP and specification requirements except for any environmental or destructive tests indicated below: N/A. The Contractor shall provide to the

Contracting Officer at least 15 calendar days advance notice of the schedule date for final inspection of the first article.

Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch(es) from which the first article was selected.

Results of contractor inspections (including supplier’s and

Vendor’s inspection records when applicable) shall be verified by the Government Quality Assurance Representative (QAR). The

QAR shall attach to the contractor’s inspection report a completed DD Form 1222. One copy of the contractor’s inspection report with the DD Form 1222 shall be forwarded with the first article; two copies shall be provided to the Contracting

Officer. Upon delivery to the Government, the first article may be subjected to inspection for all contract, drawing, specification, and QAP requirements.

(e) Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 90 days, or (iii) whenever a change occurs in the place of performance, manufacturing process, material used, drawing, specification or source supply. When conditions (i), (ii), or (iii) above occurs, the Contractor shall notify the Contracting Officer so that a determination can be made concerning the need for an additional first article sample or portion thereof, and instructions provided concerning the submission, inspection and notification of results. Costs of the first article testing resulting from production process change, change in the place of performance, or material substitution shall be borne by the

Contractor.

(f) Rejected first articles or portions thereof not destroyed during inspection and testing will be held at the government first article test site for a period of 30 days following the date of notification of rejection, pending receipt of instructions from the Contractor for the disposition of the rejected material. The Contractor agrees that failure to furnish such instructions within said 30 day period shall constitute abandonment of said material by the Contractor and shall confer upon the Government the right to destroy or otherwise dispose of the rejected items at the discretion of the

Government without liability to the Contractor by reason of such destruction or disposition.

QA006 - FIRST ARTICLE TEST (CONTRACTOR TESTING)

(a) The first article shall consist of:

*BLU-109C/B EMPTY CASE ASSEMBLY: IAW QAP BLU-109 Penetrator Rev.

A, paragraph (V)(A)(1)(a)(1).

*BLU-109/B EMPTY CASE ASSEMBLY: IAW QAP BLU-109 Penetrator Rev.

A, paragraph (V)(A)(a)(3).

*BLU-109A/B EMPTY CASE ASSEMBLY: IAW QAP BLU-109 Penetrator Rev.

A, paragraph (V)(A)(a)(2).

*CNU-417/E CONTAINER: 1-Ungalvanized container and 1 each of all other components listed on DL8463244 and 1-Galvanized container

IAW QAP BLU-109 Penetrator, Rev. A, paragraph

(V)(A)(1)(A)(5)(a).

*MHU-212B/E PALLET: IAW QAP BLU-109 PENETRATOR, REV. A,

PARAGRAPH (V)(A)(1)(A)(5)(b) which shall be examined and tested in accordance with contract requirements, the item specifications, Quality Assurance

Provisions (QAPS) and all drawings listed in the Technical Data

Package.

(b) The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package provided by the

Government.

(c) The first article shall be inspected and tested by the contractor for all requirements of the drawing(s), the QAP(s), and specification(s) referenced thereon, except for:

(1) Inspections and tests contained in material specifications provided that the required inspection and tests have been performed previously and certificates of conformance are submitted with the First Article Test Report.

(2) Inspections and tests for Military Standard (MS) components and parts provided that inspection and tests have been performed previously and certifications for the components and parts are submitted with the First Article Test Report.

(3) Corrosion resistance tests over 10 days in length provided that a test specimen or sample representing the same process has successfully passed the same test within 30 days prior to processing the first article, and results of the tests are submitted with the First Article Test Report.

(4) Life cycle tests over 10 days in length provided that the same or similar items manufactured using the same processes have successfully passed the same test within 1 year prior to processing the first article and results of the tests are submitted with the First Article Test Report.

(5) Onetime qualification tests, which are defined as a onetime on the drawing(s), provided that the same or similar item manufactured using the same processes has successfully passed the tests, and results of the test are on file at the contractor’s facility and certifications are submitted with the

First Article Test Report.

(d) Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch(es) from which the first article was selected.

(e) A First Article Test Report shall be compiled by the contractor documenting the results of all inspections and tests

(including supplier’s and Vendor’s inspection records and certifications, when applicable). The First Article Test Report shall include actual inspection and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and QAP requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. The Government Quality Assurance

Representative’s (QAR) findings shall be documented on DD Form

1222, Request for and Results of Tests, and attached to the contractor’s test report. Two copies of the First Article Test

Report and the DD Form 1222 will be submitted through the

Administrative Contracting Officer to the Contracting Officer with an additional information copy furnished to SEE CONTRACT

DATA REQUIREMENTS LIST (CDRL, FIRST ARTICLE ACCEPTANCE TEST

REPORT FOR APPLICABLE DISTRIBUTION .

(f) Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 90 days, or (iii)

Whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply. When conditions (i), (ii), or (iii) above occurs, the

Contractor shall notify the Contracting Officer so that a determination can be made concerning the need for the additional first article sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results. Costs of the first article testing resulting from production process change, change in the place of performance, or material substitution shall be borne by the Contractor.

QA007 - SUPPLEMENTAL WARRANTY INFORMATION

(a) Whenever a request for waiver, deviation, or other change to a requirement in the contract is approved, Contractor responsibilities arising out of provisions of this section are relieved only to the extent of the terms and conditions specified in the approval.

(b) For purpose of identifying the warranted material to facilities receiving it, the following instructions will apply:

(1) For a quantity of warranted material which has been accepted at origin by the Government, the pertinent DD Form 250

(and the pertinent Ammunition Data Card if the card is contractually required) shall bear the following annotation:

“The warranty period of the quantity stated hereon of (enter the item serial/lot number(s) as applicable) begins on (enter the date of acceptance of the quantity) and ends on (enter the date of the end of the warranty period for the quantity).”

(2) For a quantity of warranted material which has not been accepted at origin by the Government, the pertinent DD Form 250

(and the pertinent Ammunition Data Card if the card is contractually required) shall bear the following annotation:

“The warranty period for the quantity stated hereon of (enter item serial/lot number(s) as applicable) begins on the date of the acceptance of the lot and ends (enter the length of the warranty period) days later.”

QA-008 - AMMUNITION DATA CARDS AND REPORT OF CONTRACTOR

BALLISTIC TESTING

(a) Ammunition Data Cards shall be prepared in accordance with

MIL-STD-1168 and shall follow the format required by the world wide web application identified as WARP or Worldwide Ammunition-data Repository Program. Information provided in paragraphs 6.7 through 6.16 of MIL-STD-1168 shall be considered mandatory requirements where all instances of the term “should” are considered to be replaced with the word “shall.” This shall also include, if required on the DD Form 1423, a Report of

Contractor Lot Acceptance/Ballistic Testing and Acceptance and

Description Sheets (for Propellants and Explosives). WARP will reside within the Munitions History Program (MHP). Additional details on these WARP applications are provided below.

(b) MHP-WARP Access Procedures

(1) Government or Contractor employee with CAC and AKO account:

(a) Click on the MHP hyperlink which is https://mhp.redstone.army.mil/

(b) Enter CAC PIN when prompted

(c) Click on WARP (ADC)

(d) Click on Help

(e) Click on WARP Request Access and follow instructions

(2) Contractor or Government employee without CAC and AKO account: MHP-WARP uses PKI authentication requiring a DoD approved digital certificate as a security measure to protect the integrity of stored data. There are three vendors that have been approved to issue DoD approved certificates per an External

Certification Authority (ECA) program. You are required to use one of the approved vendors listed on the following DISA website: http://iase.disa.mil/pki/eca/index.html

A nominal fee is charged for each certificate. The Contractor, including any subcontractors, shall assume the responsibility for all costs of obtaining each digital certificate needed.

(3) After the required certificate is obtained:

(a) Click on the MHP-WARP hyperlink:

https://mhpwarp.redstone.army.mil/

(b) Enter ECA password

(c) Click on Help and follow the instructions for obtaining the necessary access

(c) HELP Numbers are as follows:

MHP Access – (256)313-2143; DSN 897-2143

JMC Quality Administrators for WARP issues – (309)782-2697 or

(309)782-7107

(d) Worldwide Ammunition-data Repository Program (WARP)

An online user’s manual will provide additional help in the development of an ammunition data card. It is recommended that you download and read the user’s manual prior to inputting your initial data card. The user’s manual also contains screen shots, which depict what the inputter will see during the ADC input process.

(e) Ammunition Data Card Input

ADC input allows current contractors and government facilities the capability to create, and submit for approval, ADCs which meet the format requirements of MIL-STD-1168. ADCs are automatically forwarded to the respective Government Agency

Responsible for Acceptance (GARA). The GARA in most cases is the Defense Contract Management Agency (DCMA) Quality Assurance

Representative (QAR), who reviews contractor input for accuracy and completeness, and after updating the disposition code for the specific lot, submits the ADC to the database. The inputter is granted access only to ADCs identified with its specific manufacturing code. The use of previously inputted ADCs through the TEMPLATE option significantly reduces input effort, while increasing accuracy and consistency of data.

(f) Email Notification

WARP provides immediate, automated notification to process participants when actions are required. When the contractor has completed an ADC submission, an email message is routed to the

GARA advising that an ADC awaits review and approval. If the

GARA approves the ADC as submitted, the ADC is released to the base and an email, with approved data card, is routed back to the originator. If the ADC requires modification or correction to conform with MIL-STD-1168 and contract requirements, an email is provided to the ADC originator advising that corrective action is required prior to approval.

(g) Information Updates

It is important that the System Administrators are apprised when a contractor receives a new contract. The contractor shall notify usarmy.ria.jmc.mbx.warp@mail.mil within 30 days after receipt of a new contract. Information to be included shall be the contract number, item, GARA, Manufacturer’s identification symbol and the names of the individuals who will be inputting

ADCs into the system. If you are a new contractor and do not have a Manufacturer’s identification symbol, you can obtain one by sending an email to usarmy.ria.jmc.mbx.warp@mail.mil. The email must contain manufacturer’s name, address where performance of the contract will take place, and a point of contact.

(h) Report of Contractor Ballistic/Function Testing Module

(1) In addition to its ADC function, WARP also serves as a repository for reports of contractor ballistic (or functional) testing. Whenever the contract requires contractor performance of ballistic testing, the results of such testing shall be captured by you, the performing contractor, within a specially designed Lot Acceptance Test Report (LATR) module.

(2) Within the LATR module, you are required to provide a report of any contractor ballistic/function testing and to submit the report in electronic format via the WWW. The report must be a .pdf file for the upload process to work.

(i) Acceptance and Description Sheets (for Propellants and

Explosives) Module: The WARP application now contains an area for on-screen data entry capturing requirements per MIL-STD-1171 for Acceptance and Description Sheets with respect to contract specified Propellant, Chemical and Explosive constituents.

QA009 - 2-D BAR CODING

(a) As a logistics measure to improve inventory, accountability, security and control, the supplier is required to provide 2-D

Bar Codes in accordance with MIL-STD-129 and MIL-PRF-61002 and as further detailed in Section D of the contract.

(b) An approval of the supplier’s 2-D Bar Code Label is required before each product with a unique national stock number (NSN) or federally recognized number (FRN) shall be presented for acceptance to the Government Quality Assurance Representative.

Prior to formal submission of product to the Government for acceptance, a first time sample of the supplier’s initial 2-D

Bar Coding Label, comprising of two (2) each of the exterior pack label and two (2) each of the pallet label, shall be submitted for approval to HQ, US Army Joint Munitions Command, 1

Rock Island Arsenal, ATTN: AMSJM-QAP, Rock Island, IL 61299-6500 to be read by a High Performance Bar Code Verification system.

(c) Within fifteen calendar days, the supplier will be notified electronically of the approval, conditional approval, or disapproval of the submitted 2-D Bar Code Label. A notice of conditional approval shall state any further actions required of the supplier. A notice of disapproval shall cite reasons for the disapproval.

(d) Once approval of the 2-D Bar Code Label is received, the supplier may begin presenting product to the Government for acceptance.

(e) During life cycle management of the product, the Government may randomly perform checks of the integrity and conformity of the 2-D Bar Code labeling that is affixed to the supplier’s product.

(f) The supplier is responsible for all costs associated with correcting 2-D Bar Code labels that do not meet contractual requirements.

QA010 - AMMUNITION DATA CARDS

Detailed requirements and guidance for the preparation of

Ammunition Data Cards (ADCs) and Ammunition Lot Numbers are contained in MIL-STD-1168, the applicable DD Form 1423 and the

Worldwide Ammunition-data Repository Program (WARP) online user’s manual. Detailed requirements for obtaining and using a manufacturer’s identification symbol, which is an integral component of the ammunition lot number, can be found in MIL-STD-

1168 and the WARP user’s manual. Information provided in paragraphs 6.7 through 6.16 of MIL-STD-1168 shall be considered mandatory requirements where all instances of the term “should” are considered to be replaced with the word “shall.”

(a) The contractor shall develop and submit ADCs in accordance with the requirements of this section, MIL-STD-1168, and the user’s manual located on the WARP database. The WARP application is accessed through the Munitions History Program

(MHP) website. (Refer to “Ammunition Data Cards and Report of

Contractor Ballistic Testing” for more information.) The ADC requirement is a flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.

(b) The contractor shall prepare an ADC for each lot of item(s) being produced under this contract, regardless of whether or not those lots are accepted or rejected by the Government. The ADC shall comply with MIL-STD-1168 and WARP requirements.

(c) Unless otherwise authorized by the Procuring Contracting

Officer, the contractor shall include, in the components sections on the ADC representing the deliverable item, as a minimum; all assemblies, sub-assemblies, components, explosives, and propellants listed below for the item being procured.

End Item Component Listing:

BLU-109A/B EMPTY CASE ASSEMBLY

AS3582-224 "O" RING FOR ARMING WELL

AS3582-236 "O" RING FOR FUZE WELL

8463234 ARMING WELL

8463171 CASE, WARHEAD

8463179 CHARGING TUBE

8463178 CLOSURE RETAINER

8463199 CLOSURE, AFT

8463176 CORROSION INHIB. SPACER

8463181 FITTING, CHARGING TUBE

MS9549-17 FLAT WASHER

NAS568-41 FULL THREADED BOLT

8463180 FUZE LINER

MS20066-373 KEY, MACHINE

8463183 NUT, CHARGING TUBE

3728AS200 MHU-212B/E PALLET

AS4863J06 PIPE PLUG

8463241 PLUG, SHIPPING ARMING WELL

8463242 PLUG; SHIPPING FUZE WELL

8463232 PROTECTIVE END CAP

8463175 PROTECTIVE NOSE CAP

8463182 RETAINER, FUZE LINER

NASM1038-183 SET SCREW FOR PROTECTIVE END CAP

NAS1081-4A7L SET SCREW SELFLOCKING

NAS1081-8D10L SET SCREW SELFLOCKING

8463191 SPACER FORWARD ADAPTOR

MS51923-210 SPRING TUBULAR PIN

8463173 SUSPENSION LUG

NAS1149-F WASHER. FLAT

BLU-109/B EMPTY CASE ASSEMBLY

8463191 SPACER FORWARD ADAPTOR

8463234 ARMING WELL

8463171 CASE, WARHEAD

8463179 CHARGING TUBE

7553318 COVER ASSEMBLY

8463228 CONTACT SWITCH PAD

8463176 CORROSION INHIB. SPACER

8463181 FITTING, CHARGING TUBE

8463182 RETAINER, FUZE LINER

8463180 FUZE LINER

8463178 RETAINER CLOSURE

7553325 LINK LATCH

7553326 RETAINER, LATCH LINK

8463183 NUT, CHARGING TUBE

7580052 LINK, COVER HANDLE

8463241 PLUG, SHIPPING ARMING WELL

8463242 PLUG; SHIPPING FUZE WELL

8463232 PROTECTIVE END CAP

8463175 PROTECTIVE NOSE CAP

8463199 AFT CLOSURE

BLU-109C/B EMPTY CASE ASSEMBLY

AS3582-224 “O" RING FOR ARMING WELL

AS3582-236 "O" RING FOR FUZE WELL

8463234 ARMING WELL

8463171 CASE, WARHEAD

8463179 CHARGING TUBE

200827964 CLOSURE, AFT 9-HOLE

8463244 CNU-417 SHIPPING CONTAINER

8463228 CONTACT SWITCH PAD

8463176 CORROSION INHIB. SPACER

201308269 FITTING, CHARGING TUBE

NAS568-41 FULL THREADED BOLT

201308268 FUZE LINER

200827967 HUB, RETAINER RING

MS20066 KEY, MACHINE;

NAS1102-4 MACHINE SCREW FORSWITCH PAD

201308304 NUT, CHARGING TUBE

201126461 NUT, EUTECTIC

MS51923-210 PIN, SPRING

200827965 PLUG, VENTING PORT

8463241 PLUG; ARMING WELL SHIPPING

8463242 PLUG; FUZE WELL SHIPPING

200827966 PROTECTIVE END CAP

8463175 PROTECTIVE NOSE CAP

200827959 RETAINER CLOSURE, EUTECTIC

20057712 RETAINER, FUZE LINER

200827968 RETAINER, RETAINER RING

8463191 SPACER FORWARD ADAPTOR

200827969 SPRING, RETAINER RING

NAS1149-F0832P WASHER FLAT

(d) The component items identified below are from paragraph (c) above and will require their own component ADC in addition to being listed on the end item ADC. The component ADCs shall also comply with MIL-STD-1168 and WARP requirements.

Not Applicable

(e) Lot numbers shall be in accordance with MIL-STD-1168 lot number convention and the technical data package requirements.

Lot numbers shall be used for all ammunition end items and their major components, including inert, dummy, or non-energetic items and components. When not required by technical data package and not an end item or major component, the component lot number may be constructed through contractor lot number convention.

(f) The flowdown of the requirement for component ADCs generated via WARP is highly encouraged for other items not identified in paragraph (d) above when the prime contractor is purchasing components, assemblies, and subassemblies from subcontractors or vendors.

(g) All component RFD/ECPs shall be listed on the ADC for the deliverable item, as well as on the component ADC, when that component is identified in paragraph (d) above. The WARP user’s manual provides information on the level of detail required.

(h) A sample ADC shall be developed and submitted to the WARP system 30 days prior to First Article testing or 30 days prior to production in the event a first article is not required. The

WARP ADC program will not allow the submission of additional

ADCs until such time as the sample ADC has been approved in the system.

QA011 - MEASUREMENT SYSTEM EVALUATION

(a) Definitions. This paragraph defines specific terms utilized throughout the rest of this section and in the accompanying

Contract Data Requirements List (CDRL) and Data Item Description

(DID). This aids in clarifying the MSE requirements to

Government and contractor personnel.

(1) Acceptance Inspection Equipment (AIE). All equipment

(includes AAIE defined below), special and standard, including dimensional gages, measuring equipment, test fixtures, electronic and physical test equipment, and other test equipment used for examination and test of a product to determine conformance to the Technical Data Package (TDP) which may include drawings and specifications (e.g., Detail, Performance, Weapon specifications, and QAPs).

(2) Automated Acceptance Inspection Equipment (AAIE). AIE in which the inspection and acceptance determination of the product is performed, in whole or in part, in an automatic manner.

(3) Contractor Inspection Equipment. Government-approved equipment utilized by the contractor to perform examination and tests to assure conformance to contract requirements.

(4) Commercial Inspection Equipment. Industry-developed inspection equipment of universal application, without limitations to a specific part or item, which is advertised or cataloged as available to the trade or to the public on an unrestricted basis at an established price. Examples follow:

(i) Standard Test Equipment. Multiusage equipment that is specific to a function rather than to an item. It includes such items as hardness testers, tensile strength testers, meters, weighing devices, standard gear testers, ohmmeters, voltmeters, and oscilloscopes.

(ii) Standard Measuring Equipment (SME). Multipurpose equipment and standards used for performing measurements. It includes such items as micrometers, rulers, tapes, height gages, and protractors, etc. Standards include visual inspection equipment such as scratch and dig standards, surface finish comparator, color standards (FED-STD-595), etc.

(5) Nondestructive Testing. The development and application of technical methods to examine materials or components in ways that do not impair future usefulness and serviceability in order to detect, locate, measure and evaluate flaws; to assess integrity, properties and composition; and to measure geometrical characteristics. NDT includes

Radiography/Radioscopic, Ultrasonic, Eddy Current, Magnetic

Particle, and Liquid Penetrant.

(6) Measurement System Analysis (MSA). Per ASTM E2782

(Standard Guide for MSA), paragraph 3.1.7, MSA is any of a number of specialized methods useful for studying a measurement system and its properties.

(b) Scope. This section establishes requirements for design, supply, performance, and maintenance of AIE used for product inspection and acceptance. In addition, this section establishes requirements for the preparation, submission, and approval of AIE documentation.

(c) AIE. The contractor shall provide all AIE necessary to ensure conformance of components and end-items to contract requirements. AIE shall include inspection, measuring, and test equipment whether Government furnished or contractor furnished

(including commercially acquired) along with the necessary specifications and procedures for their use (see ISO 10012, paragraph 6.2.1). The AIE shall not create or conceal defects on the product being inspected. All AIE documentation shall contain sufficient information to permit evaluation of the AIE’s ability to test, verify, and/or measure the applicable characteristics or parameters (see applicable DID referenced in

DD Form 1423).

(d) AIE Designs & Government Furnished Gages. AIE designs are of two types – Government designs (see (d)(1)) and contractor designs (see (d)(2)). When applicable, Government designs or

Government furnished gages are designated in the TDP/contract;

responsibility for all other AIE is assigned to the contractor.

The designs, associated inspection procedures, and theory of operation shall have the level of detail to demonstrate capability of the proposed AIE to perform the required inspection.

(1) Government AIE Designs. Government AIE designs may consist of detailed drawings necessary for the fabrication and use of the AIE. Unless otherwise specified, the contractor may submit alternate or modified contractor designs of Government

AIE designs.

(2) Contractor AIE Designs. Contractor AIE design drawings shall meet the requirements of ASME Y14.100, ASME Y14.5 and ASME

Y14.43 and may include commercial inspection equipment.

[“Commercial inspection equipment” is defined as shown in paragraph (a)(4) above. It shall be fully described by catalog listings or other means which provide sufficient information to permit identification and evaluation by the Government and may include illustrations and engineering data.] Designs shall be submitted for any special fixture(s) to be used. Unless otherwise specified, Gage Tolerancing Policy shall be in accordance with ASME Y14.43, “Absolute Tolerancing (Pessimistic

Tolerancing).”

(3) Visual Inspection. Visual inspection standards used for the acceptance/rejection of product shall be submitted for approval.

(e) AIE Package Submittals. The contractor shall prepare the

AIE package submittal in accordance with the DID referenced in the applicable Contract Data Requirements List (CDRL – DD Form

1423). In addition, the contractor shall adhere to the following requirements:

(1) Designs for Approval. Contractor designs and/or the submission for the use of Government designs shall be approved by the Government. Partial submission of AIE designs is permissible in order to expedite the approval process; however, the response date for design review will be based on the date of the final complete submission of designs.

(2) Correspondence in English. The contractor shall ensure all AIE correspondence and documentation are submitted in

English.

(3) Units of Measurement. The units of measurement within the AIE package submittal shall be consistent with the requirements of the Technical Data Package (TDP).

(4) AIE Flow Down. The contractor shall flow down AIE requirements to sub-contractors at any tier who are performing acceptance inspections.

(f) Characteristics for Inspection. AIE documentation for

Critical, Special, and Major characteristic inspections shall be submitted to the Government for approval in accordance with

(IAW) the CDRL (see DD Form 1423). AIE for Minor characteristic inspections shall be submitted to the Government for approval

IAW CDRL (see DD Form 1423) and as required below:

(1) [X] Listed Minor (characteristics displayed on specifications and/or drawings

(…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.