Risk_Reduction_Ph_Diagram_20161213.pptx
PPTX presentation 788 KB Posted
- Attached to
- GFEBS Increment II - RFI
- Solicitation number
- W52P1J-17-R-INC2
About this file
Risk Reduction Ph Diagram
View the file
Other files
| File | Type | Posted |
|---|---|---|
| INC_II_QA_20161219.pdf | ||
| RFI_Matrix_20161212.xlsx | XLSX spreadsheet | |
| IRM_Problem_Statement_(Redacted)_20161213.docx | DOCX document | |
| DoDI_5000.02.pdf | ||
| GFEBS_Portfolio_Task_Descriptions_20161213.docx | DOCX document | |
| IRM_Requirements_20161213.xlsx | XLSX spreadsheet | |
| Increment_Development_Schedule_20161213.pdf | ||
| GFEBS_Portfolio_RFI_20161213.docx | DOCX document | |
| Draft__EFI_Problem_Statement_(Redacted)_20161213.docx | DOCX document | |
| SLTT_Requirements_20161213.xlsx | XLSX spreadsheet | |
| SLTT_Problem_Statement_(Redacted)_20161213.docx | DOCX document | |
| EFI_Capability_Description_Sample_20161213.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Analyze (PDR) Stage Risk Reduction Phase Build Plan Functional:
RTM
Prelim Design
BPD
Fit Gap Conf Obj Inv Schedule SI-provided Cost Estimate Entry Criteria:
- Traceability to Problem Statement
- Updated ConOps
- RTM
- High Level Business Process Flow Begin SI Risk Reduction Preliminary Design Review Wave Defined by PMO & Functional Requirements Analyze Stage Screening Entry Criteria
PMO:
Govt ROM Provide Capacity Funding Type DASA-FIM Approves
PMO & SI:
Engineer Solutions
SI ROM
White Paper/Deck PMO Selects Solution
PDR
Risk Reduction Phase Functional Community Review Functional Community Prioritized List
ACRONYMS
AAE – Army Acquisition Executive Appr - Approve BPD – Business Process Diagram Conf - Configuration ConOps – Concept of Operations EGB – Executive Governance Board FGB – Functional Governance Board Govt - Government IMS – Integrated Master Schedule Inv - Inventory Obj - Object Opt A – Option A PDR – Preliminary Design Review POE – Program Office Estimate PMO – Program Management Office Reqs – Requirements ROM – Rough Order of Magnitude RTM – Requirements Traceability Matrix SI – Systems Integrator SME – Subject Matter Expert Wave Sol – Wave Solution
UNCLASSIFIED: FOR OFFICIAL USE ONLY
GFEBS Risk Reduction Flow Diagram
Legend:
Option A = Requirements above the Cut Line Option B = Engineered Solution
PDR
Functional Community Review
Functional Community Prioritized List
UNCLASSIFIED: FOR OFFICIAL USE ONLY