Increment Development Schedule

View the file

Other files

File Type Posted
INC_II_QA_20161219.pdf PDF
RFI_Matrix_20161212.xlsx XLSX spreadsheet
IRM_Problem_Statement_(Redacted)_20161213.docx DOCX document
DoDI_5000.02.pdf PDF
Risk_Reduction_Ph_Diagram_20161213.pptx PPTX presentation
GFEBS_Portfolio_Task_Descriptions_20161213.docx DOCX document
IRM_Requirements_20161213.xlsx XLSX spreadsheet
GFEBS_Portfolio_RFI_20161213.docx DOCX document
Draft__EFI_Problem_Statement_(Redacted)_20161213.docx DOCX document
SLTT_Requirements_20161213.xlsx XLSX spreadsheet
SLTT_Problem_Statement_(Redacted)_20161213.docx DOCX document
EFI_Capability_Description_Sample_20161213.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J

Transition-In GFEBS Wave 1 (W1)

GFEBS W1 RR

Requirements Analysis

Analyze PD

GFEBS W1 Development

Design

GFEBS Wave 2 (W2)

GFEBS W2 RR

Requirements Analysis

Analyze

Build & Unit Test

PD

GFEBS W2 Development

Design

DT/RT/UAT OT

Build & Unit Test

GFEBS Wave 3 (W3)

GFEBS W3 RR

Requirements Analysis

Analyze

DT/RT/UAT

PD

GFEBS W3 Development

Design

OT

Build & Unit Test

GFEBS Wave 4 (W4)

GFEBS W4 RR

Requirements Analysis

Analyze

DT/RT/UAT

PD

GFEBS W4 Development

Design

OT

Build & Unit Test

GFEBS Wave 5 (W5)

GFEBS W5 RR

Requirements Analysis

Analyze

DT/RT/UAT

PD

GFEBS W5 Development

Design

OT

Build & Unit Test DT/RT/UAT OT

Contract Start W1

W1

CDR

W2

PDR

W1

TRR

W1

OTRR

W2

CDR

W2

TRR

W3

PDR

W2

OTRR

W3

CDR

W3

TRR

W4

W3

OTRR

W4

CDR

W4

W5

PDR

W4

OTRR

W5

CDR

W5

TRR

W5

OTRR

J

LEGEND

CDR: Critical Design Review DT: Developmental Test OT: Operational Test OTRR: Operational Test Readiness Review PD: Pre-Design PDR: Preliminary Design Review RR: Risk Reduction RT: Regression Test TRR: Test Readiness Review UAT: User Acceptance Test