Increment_Development_Schedule_20161213.pdf
PDF 43 KB Posted
- Attached to
- GFEBS Increment II - RFI
- Solicitation number
- W52P1J-17-R-INC2
About this file
Increment Development Schedule
View the file
Other files
| File | Type | Posted |
|---|---|---|
| INC_II_QA_20161219.pdf | ||
| RFI_Matrix_20161212.xlsx | XLSX spreadsheet | |
| IRM_Problem_Statement_(Redacted)_20161213.docx | DOCX document | |
| DoDI_5000.02.pdf | ||
| Risk_Reduction_Ph_Diagram_20161213.pptx | PPTX presentation | |
| GFEBS_Portfolio_Task_Descriptions_20161213.docx | DOCX document | |
| IRM_Requirements_20161213.xlsx | XLSX spreadsheet | |
| GFEBS_Portfolio_RFI_20161213.docx | DOCX document | |
| Draft__EFI_Problem_Statement_(Redacted)_20161213.docx | DOCX document | |
| SLTT_Requirements_20161213.xlsx | XLSX spreadsheet | |
| SLTT_Problem_Statement_(Redacted)_20161213.docx | DOCX document | |
| EFI_Capability_Description_Sample_20161213.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J
Transition-In GFEBS Wave 1 (W1)
GFEBS W1 RR
Requirements Analysis
Analyze PD
GFEBS W1 Development
Design
GFEBS Wave 2 (W2)
GFEBS W2 RR
Requirements Analysis
Analyze
Build & Unit Test
PD
GFEBS W2 Development
Design
DT/RT/UAT OT
Build & Unit Test
GFEBS Wave 3 (W3)
GFEBS W3 RR
Requirements Analysis
Analyze
DT/RT/UAT
PD
GFEBS W3 Development
Design
OT
Build & Unit Test
GFEBS Wave 4 (W4)
GFEBS W4 RR
Requirements Analysis
Analyze
DT/RT/UAT
PD
GFEBS W4 Development
Design
OT
Build & Unit Test
GFEBS Wave 5 (W5)
GFEBS W5 RR
Requirements Analysis
Analyze
DT/RT/UAT
PD
GFEBS W5 Development
Design
OT
Build & Unit Test DT/RT/UAT OT
Contract Start W1
W1
CDR
W2
PDR
W1
TRR
W1
OTRR
W2
CDR
W2
TRR
W3
PDR
W2
OTRR
W3
CDR
W3
TRR
W4
W3
OTRR
W4
CDR
W4
W5
PDR
W4
OTRR
W5
CDR
W5
TRR
W5
OTRR
J
LEGEND
CDR: Critical Design Review DT: Developmental Test OT: Operational Test OTRR: Operational Test Readiness Review PD: Pre-Design PDR: Preliminary Design Review RR: Risk Reduction RT: Regression Test TRR: Test Readiness Review UAT: User Acceptance Test