W52P1J16R0156-0001.pdf
PDF 15 KB Posted
- Attached to
- MK3-0 and MS3314 Suspension Lug
- Solicitation number
- W52P1J-16-R-0156
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Fixed Price with EPA - Actual Costs
0001 2017SEP07
W52P1J
ARMY CONTRACTING COMMAND - RI
ROCK ISLAND, IL 61299-8000
BLDGS 60 & 62
LAURA K. SPENCER
EMAIL: LAURA.K.SPENCER2.CIV@MAIL.MIL
W52P1J-16-R-0156
2017AUG17
X
X
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 2
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: LAURA K. SPENCER
Buyer Office Symbol/Telephone Number: CCRC-AR/(309)782-0295
Type of Contract 1: Fixed Price with EPA - Actual Costs
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
The purpose of amendment 0001 to solicitation W52P1J-16-R-0156 is to provide notice of upcoming changes that will be executed in the form of an Engineering Change Proposal (ECP) for the MK3-0 Suspension Lug and an Automated Data List (ADL) Change Notice for the MS3314
Suspension Lug. This information is provided prior to release of the official ECP and ADL Change Notice to allow any interested offerors time to review and account for the change in their proposals.
1. With regard to the MS3314 Suspension Lug, the following changes are anticipated:
On the QAP MS3314 (Attachment 0010), page 7/8, section 2.9.2, change:
FROM: "2.9.2 Finish - All lugs will be either cadmium plated in accordance with AMS-QQ-P-416, type II, Class 2 or zinc plated in accordance with ASTM B633, Type II, SC3. Cadmium plating in accordance with AMS-QQ-P-416, Type II, Class 2 will not be more than o.ooo8 inches thick. Zinc plating in accordance with ASTM B633, Type II, SC3 will not be more than o.ooo8 inches thick. Acid pickling for cleaning is prohibited. Acid dip of 20 seconds maximum for surface activation after bake and before plating is allowed. Dip and plating process to have low hydrogen content. The cleaning method used shall not be injurious to any of the parts nor shall the parts be contaminated by the cleaning agent. Barrel plating is prohibited."
TO: "2.9.2 Finish - All lugs will be either cadmium plated in accordance with AMS-QQ-P-416, Type II, Class 2 or zinc plated in accordance with ASTM B633, Type II, SC3. Cadmium plating in accordance with AMS-QQ-P-416, Type II, Class 2 will not be more than 0.0008 inches thick. Zinc plating in accordance with ASTM B633, Type II, SC3 will not be more than 0.0008 inches thick. Acid pickling for cleaning is prohibited. Acid dip of 20 seconds maximum for surface activation after bake and before plating is allowed. Dip and plating process to have low hydrogen content. The cleaning method used shall not be injurious to any of the parts nor shall the parts be contaminated by the cleaning agent. Barrel plating and the use of brighteners is prohibited. A post chromate conversion treatment bake of 100 +/- 10 degrees Fahrenheit for 24 hours minimum is required to ensure full drying of the chromate."
2. With regard to the MK3-0 Suspension Lug, the following changes are anticipated:
On Drawing (DWG) 1380540, Sheet 1, Note 2.D change:
FROM: "...BARREL PLATING AND THE USE OF BRIGHTENERS IS PROHIBITED."
TO: "...BARREL PLATING AND THE USE OF BRIGHTENERS IS PROHIBITED. A POST CHROMATE CONVERSION TREATMENT BAKE OF 100 +/- 10 DEGREES
FAHRENHEIT FOR 24 HOURS MINIMUM IS REQUIRED TO ENSURE FULL DRYING OF THE CHROMATE."
3. The updated drawing and QAP are expected to be available on or around 30 September 2017. Another solicitation amendment will be posted to provide the drawing and QAP when they become available.
4. All other terms and conditions of this solicitation remain unchanged.
*** END OF NARRATIVE A0002 ***
2 2
W52P1J-16-R-0156 0001
SECTION A
File details come from the government source that posted it. Updated .