W52P1J-16-R-0156_0002.pdf
PDF 23 KB Posted
- Attached to
- MK3-0 and MS3314 Suspension Lug
- Solicitation number
- W52P1J-16-R-0156
About this file
Amendment 2
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Fixed Price with EPA - Actual Costs
0002 2017SEP22
W52P1J
ARMY CONTRACTING COMMAND - RI
ROCK ISLAND, IL 61299-8000
BLDGS 60 & 62
LAURA K. SPENCER
EMAIL: LAURA.K.SPENCER2.CIV@MAIL.MIL
W52P1J-16-R-0156
2017AUG17
X
X 2017OCT13 05:00pm
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 7
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: LAURA K. SPENCER
Buyer Office Symbol/Telephone Number: CCRC-AR/(309)782-0295
Type of Contract 1: Fixed Price with EPA - Actual Costs
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
The purpose of Amendment 0002 to Solicitation W52P1J-16-R-0156 is the following:
1. To provide Industry Questions and Government Responses as Attachment 0019. Attachment 0019 is provided for information and clarification purposes only and will not be incorporated into a resultant contract from this solicitation.
2. To provide additional information on the post-chromate bake requirements described in Amendment 0001 as follows:
Paragraph 1, MS3314, "TO" condition should read:
TO: "2.9.2 Finish - All lugs will be either cadmium plated in accordance with AMS-QQ-P-416, type II, Class 2 or zinc plated in accordance with
ASTM B633, Type II, SC3. Cadmium plating in accordance with AMS-QQ-P-416, Type II, Class 2 will not be more than 0.0008 inches thick.
Zinc plating in accordance with ASTM B633, Type II, SC3 will not be more than 0.0008 inches thick. Acid pickling for cleaning is prohibited. Acid dip of 20 seconds maximum for surface activation after bake and before plating is allowed. Dip and plating process to have low hydrogen content. The cleaning method used shall not be injurious to any of the parts nor shall the parts be contaminated by the cleaning agent. Barrel plating and the use of brighteners is prohibited. A post chromate conversion treatment bake of 100 +/-10 degrees Fahrenheit for 24-36 hours is required to ensure full drying of chromate. Post chromate bake shall begin within 4 hours after application of the chromate."
Paragraph 2, MK 3, "TO" condition should read:
TO: "...BARREL PLATING AND THE USE OF BRIGHTENERS IS PROHIBITED. A POST CHROMATE CONVERSION TREATMENT BAKE OF 100 +/- 10 DEGREES
FAHRENHEIT FOR 24-36 HOURS IS REQUIRED TO ENSURE FULL DRYING OF THE CHROMATE. POST CHROMATE BAKE SHALL BEGIN WITHIN 4 HOURS AFTER
APPLICATION OF CHROMATE."
3. To provide Automated Data List (ADL) Change Notice ADLMS3314-001 and Quality Assurance Provisions (QAP) MS3314, Revision H dated 12
September 2017.
a. Section C, "Drawings/Specifications" is updated to reflect this change.
b. Section E, "First Article Test (Contractor Testing)" is updated to reflect this change.
c. Section I, "First Article Approval (Contractor Testing (Sep 1989) -- Alternate" is updated to reflect this change.
d. Section J is updated to reflect this change.
i. Attachment 0010 is updated.
ii. Attachment 0020 is added for ADL Change Notice ADLMS3314-001.
4. The due date of 2 October 2017, 1700 Central Time (CT) has been extended to 13 October 2017, 1700 Central Time (CT).
*** END OF NARRATIVE A0003 ***
2 7
W52P1J-16-R-0156 0002
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________
C-1 CHANGED 52.210-4501 DRAWINGS/SPECIFICATIONS APR/2012
(ACC-RI)
MK3-0 Suspension Lug:_____________________
(a) In addition to the drawing(s) and/or specifications listed below, other documents which are part of this procurement and which apply to Preservation/Packaging/Packing and Inspection and Acceptance are contained elsewhere.
(b) Drawings and Specifications in accordance with Technical Data Package Listing Automated Data List (ADL) 1380540 Revision N, with revisions in effect as of 18 May 2016, and ADL Change Notice 1380540N-001, Drawing 1380540 Rev AA dated 21 November 2016, are applicable to this procurement.
(c) Technical Data Packages, including any exceptions thereto, will be obtained electronically in accordance with the clause titled
"Technical Data Package Information and Distribution and Destruction of Restricted Technical Data" in Section C of this document.
MS3314 Suspension Lug:______________________
(a) In addition to the drawing(s) and/or specifications listed below, other documents which are part of this procurement and which apply to Preservation/Packaging/Packing and Inspection and Acceptance are contained elsewhere.
(b) Drawings and Specifications in accordance with Technical Data Package Listing Automated Data List (ADL) MS3314 Revision T, with revisions in effect as of 15 September 2016, and ADL Change Notice ADLMS3314-001 and Quality Assurance Provisions (QAP) MS3314, Revision H dated 12 September 2017 are applicable to this procurement.
(c) Technical Data Packages, including any exceptions thereto, will be obtained electronically in accordance with the clause titled
"Technical Data Package Information and Distribution and Destruction of Restricted Technical Data" in Section C of this document.
(End of statement of work)
(CS6100)
3 7
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________
E-1 CHANGED 52.209-4512 FIRST ARTICLE TEST (CONTRACTOR TESTING) NOV/2011
(ACC-RI)
(a) The first article shall consist of:
MK3-0 Suspension Lug: The requirements outlined in Section VI of QAP 1380540 Rev. E dated 18 May 2016
MS3314 Suspension Lug: The requirement outlined in Section V of QAP MS3314 Rev. H dated 12 September 2017 which shall be examined and tested in accordance with contract requirements, the item specifications, Quality Assurance Provisions
(QAPS) and all drawings listed in the Technical Data Package.
(b) The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package provided by the Government.
(c) The first article shall be inspected and tested by the contractor for all requirements of the drawing(s), the QAP(s), and specification(s) referenced thereon, except for:
(1) Inspections and tests contained in material specifications provided that the required inspection and tests have been performed previously and certificates of conformance are submitted with the First Article Test Report.
(2) Inspections and tests for Military Standard (MS) components and parts provided that inspection and tests have been performed previously and certifications for the components and parts are submitted with the First Article Test Report.
(3) Corrosion resistance tests over 10 days in length provided that a test specimen or sample representing the same process has successfully passed the same test within 30 days prior to processing the first article, and results of the tests are submitted with the First Article Test Report.
(4) Life cycle tests over 10 days in length provided that the same or similar items manufactured using the same processes have successfully passed the same test within 1 year prior to processing the first article and results of the tests are submitted with the First Article Test Report.
(5) Onetime qualification tests, which are defined as a onetime on the drawing(s), provided that the same or similar item manufactured using the same processes has successfully passed the tests, and results of the test are on file at the contractor's facility and certifications are submitted with the First Article Test Report.
(d) Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch(es) from which the first article was selected.
(e) A First Article Test Report shall be compiled by the contractor documenting the results of all inspections and tests (including supplier's and Vendor's inspection records and certifications, when applicable). The First Article Test Report shall include actual inspection and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and QAP requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. The Government Quality Assurance Representative's (QAR) findings shall be documented on
DD Form 1222, Request for and Results of Tests, and attached to the contractor's test report. Two copies of the First Article Test
Report and the DD Form 1222 will be submitted through the Administrative Contracting Officer to the Contracting Officer with an additional information copy furnished via email or AMRDEC Safesite in accordance with attached list of addresses for CDRLS.
(f) Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 90 days, or (iii) Whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply. When conditions (i), (ii), or (iii) above occurs, the Contractor shall notify the Contracting Officer so that a determination can be made concerning the need for the additional first article sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results. Costs of the first article testing resulting from production process change, change in the place of performance, or material substitution shall be borne by the Contractor.
(End of clause)
(ES6031)
4 7
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION I - CONTRACT CLAUSES
Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________
I-1 CHANGED 52.209-3 FIRST ARTICLE APPROVAL -- CONTRACTOR TESTING (SEP 1989) -- ALTERNATE JAN/1997
I (JAN 1997)
MK3-0 Suspension Lug:_____________________
(a) The Contractor shall test those items and quantities as required by QAP 1380540 Rev E of Lot/Item MK3-0 Suspension Lug as specified in this contract. At least 15 calendar days before the beginning of first article tests, the Contractor shall notify the
Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.
(b) The Contractor shall submit the first article test report within 240 calendar days from the date of this contract to Office CCRC-
AR marked First Article Test Report: Contract No. ___, Lot/Item No. ___. Within 30 calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval. FAT shall be conducted no later than 210 days after contract award.
(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the
Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.
(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for
(1) progress payments, or
(2) termination settlements if the contract is terminated for the convenience of the Government.
(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.
(i) The Contractor shall produce both the first article and the production quantity at the same facility.
MS3314 Suspension Lug:______________________
(a) The Contractor shall test those items and quantities as required by QAP MS3314 Rev H of Lot/Item MS3314 Suspension Lug as specified in this contract. At least 15 calendar days before the beginning of first article tests, the Contractor shall notify the
Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.
(b) The Contractor shall submit the first article test report within 240 calendar days from the date of this contract to office CCRC-
AR marked First Article Test Report: Contract No. ___, Lot/Item No. ___. Within 30 calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval. FAT shall be conducted no later than 210 days after contract award.
5 7
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the
Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.
(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for
(1) progress payments, or
(2) termination settlements if the contract is terminated for the convenience of the Government.
(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.
(i) The Contractor shall produce both the first article and the production quantity at the same facility.
(End of Clause)
6 7
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION J - LIST OF ATTACHMENTS
List of Number List of Number
Addenda Title Date of Pages Transmitted By Addenda Title Date of Pages Transmitted By________________ ____________________________________________________________ _______________ ____________ _______________________________ ____________________________________________________________ _______________ ____________ _______________
Attachment 0010 QUALITY ASSURANCE PROVISION (QAP) MS3314 FOR THE MS3314 12-SEP-2017 016
Attachment 0019 INDUSTRY QUESTIONS AND GOVERNMENT RESPONSES 19-SEP-2017 002
Attachment 0020 ADL CHANGE NOTICE ADLMS3314-001 15-SEP-2017 001
7 7
| SECTION A |
| SECTION C |
| SECTION E |
| SECTION I |
| SECTION J |
File details come from the government source that posted it. Updated .