EXHIBIT A MK3-0 CONTRACT DATA REQUIREMENTS LIST (CDRL)
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP ______________ TM ___________ OTHER __X_____________
E. CONTRACT / PR NO. F. CONTRACTOR D. SYSTEM/ITEM
LUG, SUSPENSION MK 3 MOD 0
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
B001 QUALITY PROGRAM PLAN (QPP)
4. AUTHORITY (Data Acquisition Documentation No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-QCIC-81722 SECTION E (SEE BLK 16) AMSJM-QAP
7. DD 250 REQ. 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED
NO D ONE/R ASREQ b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT Final
SUBMISSION a. ADDRESSEE Draft Reg Repro
A N/A ASREQ
16. REMARKS: AMSJM-QAP 0 1 0
NAWCWD (685200D) 0 1 0
BLK 5: THE QUALITY PROGRAM PLAN (QPP) SHALL DOCUMENT THE NAWCWD (QA) 0 1 0
CONTRACTOR’S IMPLEMENTATION OF A QUALITY SYSTEM IN AFLCMC/EBHCB 0 1 0
ACCORDANCE WITH THE QUALITY ASSURANCE PROVISION (QAP). DCMA-MCWB (QAR) 0 1 0
CCRC-AR 0 1 0
BLK 12: THE QPP SHALL BE SUBMITTED NO LATER THAN 150 CALENDAR
DAYS AFTER CONTRACT AWARD. THE GOVERNMENT REQUIRES 30 DAYS
FOR REVIEW. DISPOSITION OF THE QPP WILL BE PROVIDED THROUGH
THE PROCURING CONTRACTING OFFICER (PCO). IF FURTHER REVISIONS
ARE NECESSARY, THE CONTRACTOR SHALL HAVE 15 DAYS TO PROVIDE
REVISIONS AND THE GOVERNMENT SHALL REVIEW AND PROVIDE
DISPOSITION WITHIN 15 DAYS OF RECEIPT. THE QPP SHALL BE
APPROVED PRIOR TO FAT, IF FAT IS REQUIRED, OR PRIOR TO INITIATION
OF PRODUCTION.
BLK 13: SUBMIT UPDATES/REVISIONS FOR REVIEW AND
APPROVAL PRIOR TO IMPLEMENTATION .
BLK 14: SUBMIT VIA EMAIL OR AMRDEC SAFESITE IN ACCORDANCE
WITH ATTACHED LIST OF ADDRESSES FOR CDRLS.
15. TOTAL 0 7 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Jan Murphy 20161209
DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 1 of 14 Pages
K. Mosher for SDMO RDAR-EIS 9 JAN 2017
U18C0715HI
SFAE-AMO-JP 0 0 1
B
NAWC-WD, China Lake, CA 93555-6100
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP ______________ TM ___________ OTHER __X_____________
E. CONTRACT / PR NO. F. CONTRACTOR D. SYSTEM/ITEM
LUG, SUSPENSION MK 3 MOD 0
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
B002
4. AUTHORITY (Data Acquisition Documentation No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MGMT-81987 SECTION E AMSJM-QAP
7. DD 250 REQ. 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED
NO D ONE/R ASREQ b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT Final SUBMISSION a. ADDRESSEE Draft Reg Repro
A N/A ASREQ
16. REMARKS: AMSJM-QAP 0 1 0
NAWCWD (685200D) 0 1 0
NAWCWD (QA) 0 1 0
AFLCMC/EBHCB 0 1 0
DCMA-MCWB (QAR) 0 1 0
CCRC-AR 0 1 0
BLK 12: THE GENERAL PLAN SHALL BE SUBMITTED NO LATER THAN
150 CALENDAR DAYS AFTER CONTRACT AWARD. THE DETAILED
PLAN SHALL BE SUBMITTED 30 DAYS AFTER FAT APPROVAL, IF FAT IS
REQUIRED, OR 30 DAYS AFTER INITIATION OF PRODUCTION. THE
GOVERNMENT REQUIRES 30 DAYS FOR REVIEW. DISPOSITION OF
THE GENERAL AND DETAILED SECTIONS WILL BE PROVIDED
THROUGH THE PROCURING CONTRACTING OFFICER (PCO). IF
FURTHER REVISIONS ARE NECESSARY, THE CONTRACTOR SHALL
HAVE 15 DAYS TO PROVIDE REVISIONS AND THE GOVERNMENT
SHALL REVIEW AND PROVIDE DISPOSITION WITHIN 15 DAYS OF
RECEIPT.
BLK 14: SUBMIT VIA EMAIL OR AMRDEC SAFESITE IN ACCORDANCE
WITH ATTACHED LIST OF ADDRESSES FOR CDRLS.
15. TOTAL 0 7 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Jan Murphy 20161209
DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 2 of 14 Pages
Kristy Mosher for SDMO RDAR-EIS-PD 9 JAN 2017
U18C0715HI
SFAE-AMO-JP
STATISTICAL PROCESS CONTROL (SPC) PLAN
BLK 13: SUBMIT UPDATE/REVISIONS FOR REVIEW AND APPROVAL
PRIOR TO IMPLEMENTATION.
10 0
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP ______________ TM ___________ OTHER __X_____________
E. CONTRACT / PR NO. F. CONTRACTOR D. SYSTEM/ITEM
LUG, SUSPENSION MK 3 MOD 0
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
B003 INSPECTION AND TEST PLAN
4. AUTHORITY (Data Acquisition Documentation No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-QCIC-81110 QAP 1380540 REV E AMSJM-QAP
7. DD 250 REQ. 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED
NO D ONE/R ASREQ b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT Final SUBMISSION a. ADDRESSEE Draft Reg Repro
A N/A ASREQ
16. REMARKS: AMSJM-QAP 0 1 0
NAWCWD (685200D) 0 1 0
BLK 5: THE INSPECTION AND TEST PLAN (ITP) SHALL BE IN ACCORDANCE NAWCWD (QA) 0 1 0
WITH THE QUALITY ASSURANCE PROVISION (QAP). AFLCMC/EBHCB 0 1 0
DCMA-MCWB (QAR) 0 1 0
CCRC-AR 0 1 0 BLK 12: THE ITP SHALL BE SUBMITTED NO LATER THAN 150 CALENDAR
DAYS AFTER CONTRACT AWARD. THE GOVERNMENT REQUIRES 30 DAYS
FOR REVIEW. DISPOSITION OF THE ITP WILL BE PROVIDED THROUGH
THE PROCURING CONTRACTING OFFICER (PCO). IF FURTHER REVISIONS
ARE NECESSARY, THE CONTRACTOR SHALL HAVE 15 DAYS TO PROVIDE
REVISIONS AND THE GOVERNMENT SHALL REVIEW AND PROVIDE
DISPOSITION WITHIN 15 DAYS. THE ITP SHALL BE APPROVED PRIOR TO
FAT, IF FAT IS REQUIRED, OR PRIOR TO INITIATION OF PRODUCTION.
BLK 13: SUBMIT UPDATES FOR REVIEW AND APPROVAL PRIOR TO
IMPLEMENTATION .
BLK 14: SUBMIT VIA EMAIL OR AMRDEC SAFESITE IN ACCORDANCE
WITH ATTACHED LIST OF ADDRESSES FOR CDRLS.
15. TOTAL 0 7 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Jan Murphy 20161209
DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 3 of 14 Pages
K. Mosher for SDMO RDAR-EIS-PD 9 JAN 2017
U18C0715HI
SFAE-AMO-JP 010
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP ______________ TM ___________ OTHER __X_____________
E. CONTRACT / PR NO. F. CONTRACTOR D. SYSTEM/ITEM
LUG, SUSPENSION MK 3 MOD 0
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
B004 MEASUREMENT SYSTEM EVALUATION (MSE) –
MEASUREMENT AND INSPECTION EQUIPMENT
SYSTEM DESIGN DOCUMENTATION FOR
ACCEPTANCE OF PRODUCT
ACCEPTANCE INSPECTION EQUIPMENT
4. AUTHORITY (Data Acquisition Documentation No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-QCIC-81960 SECTION E MSE CLAUSE NSWC (MS-21)
7. DD 250 REQ. 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED
LT D ASREQ ASREQ b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT Final SUBMISSION a. ADDRESSEE Draft Reg Repro
A N/A ASREQ
16. REMARKS: NSWC (MS-21) 0 1 0
NAWCWD (685200D) 0 1 0
AMSJM-QAP 0 1 0
NAWCWD (QA) 0 1 0
AFLCMC/EBHCB 0 1 0
DCMA-MCWB (QAR) 0 1 0
CCRC-AR 0 1 0
BLKS 10, 12: THE CONTRACTOR SHALL SUBMIT A COMPLETED
ACCEPTANCE INSPECTION EQUIPMENT (AIE) PACKAGE NO LATER
THAN 150 CALENDAR DAYS AFTER CONTRACT AWARD. THE
GOVERNMENT WILL PROVIDE DISPOSITION WITHIN 45 DAYS AFTER
FINAL AIE PACKAGE RECEIPT.
BLK 13: IF FURTHER REVISIONS ARE NECESSARY, THE CONTRACTOR
SHALL HAVE 30 DAYS TO GENERATE REVISIONS AND THE
GOVERNMENT SHALL HAVE 30 DAYS TO REVIEW AND RESPOND.
THE APPROVED AIE SHALL BE AVAILABLE FOR FIRST ARTICLE TESTING
(IF FIRST ARTICLE TESTING IS REQUIRED), PRODUCTION, AND/OR
ALL ACCEPTANCE OF PRODUCT UNDER THE CONTRACT.
IF CONTRACTOR REVISES A PREVIOUSLY GOVERNMENT-ACCEPTED AIE
FOR THIS CONTRACT, THE REVISED AIE MUST BE SUBMITTED TO THE
GOVERNMENT FOR REVIEW AND APPROVAL. GOVERNMENT APPROVAL
MUST BE GRANTED BEFORE AIE IS USED FOR ACCEPTANCE OF
PRODUCT. THE GOVERNMENT WILL RESPOND WITHIN 30
DAYS AFTER RECEIPT OF AIE.
THE CONTRACTOR SHALL NOTIFY THE RESPONSIBLE
GOVERNMENT TECHNICAL AGENCY WITHIN A MINIMUM OF 30 DAYS
PRIOR TO ACCEPTANCE (PROVE OUT) TESTING.
BLK 14: SUBMIT VIA EMAIL OR AMRDEC SAFESITE IN ACCORDANCE
WITH ATTACHED LIST OF ADDRESSES FOR CDRLS.
15. TOTAL 0 8 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Jan Murphy 20161209
DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 4 of 14 Pages
K. Mosher for SDMO RDAR-EIS-PD 9 JAN 2017
U18C0715HI
An MSE Review Guide is available to assist Contractors on the ARDEC Public Website in the application of the MSE Clause. The MSE Review Guide's content, in its entirety, is provided solely for REFERENCE and GUIDANCE PURPOSES ONLY- it is not, nor is it intended to be, contractually binding.
Accordingly, the information contained within the MSE Review Guide is expressly not, nor shall it be construed to be, incorporated either directly or by reference into the terms of the MSE clause itself nor into the terms and conditions of any underlying contract which contains the MSE clause.
SFAE-AMO-JP 010
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP ______________ TM ___________ OTHER __X_____________
E. CONTRACT / PR NO. F. CONTRACTOR D. SYSTEM/ITEM
LUG, SUSPENSION MK 3 MOD 0
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
B005 REQUEST FOR VARIANCE (RFV)
4. AUTHORITY (Data Acquisition Documentation No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-80640D SECTION C NAWCWD (685200D)
7. DD 250 REQ. 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED
LT D ASREQ ASREQ b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT Final SUBMISSION a. ADDRESSEE Draft Reg Repro
A N/A ASREQ
16. REMARKS: NAWCWD (685200D) 0 1 0
NAWCWD (QA) 0 1 0
BLK 4: TAILOR DATA ITEM DESCRIPTION (DID) AS FOLLOWS: DELETE AFLCMC/EBHCB 0 1 0
PARA 2, SUBMIT REQUEST FOR VARIANCE (RFV) ON DD FORM 1694, CCRC-AR 0 1 0
AND INCLUDE IN THE CONTENT OF THE RFV ADEQUATE
DATA/ANALYSIS/TESTING TO SUPPORT THE REQUEST FOR DEVIATION.
BLKS 10, 12, 13: THE CONTRACTOR SHALL PREPARE AND SUBMIT A
RFV FOR EACH VARIANCE ON DD FORM 1694. DD FORM IS LOCATED AT:
http://www.dtic.mil/whs/directives/forms/dd/ddforms1500-1999.htm
BLK 14: SUBMIT VIA EMAIL OR AMRDEC SAFESITE IN ACCORDANCE
WITH ATTACHED LIST OF ADDRESSES FOR CDRLS.
15. TOTAL 0 5 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Jan Murphy 20161209
DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 5 of 14 Pages
K. Mosher for SDMO RDAR-EIS-PD 9 JAN 2017
U18C0715HI
SFAE-AMO-JP 0 1 0
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP ______________ TM ___________ OTHER __X_____________
E. CONTRACT / PR NO. F. CONTRACTOR D. SYSTEM/ITEM
LUG, SUSPENSION MK 3 MOD 0
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
B006 ENGINEERING CHANGE PROPOSAL (ECP)
4. AUTHORITY (Data Acquisition Documentation No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-80639D SECTION C NAWCWD (685200D)
7. DD 250 REQ.
9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED
LT D ASREQ ASREQ b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT Final SUBMISSION a. ADDRESSEE Draft Reg Repro
A N/A ASREQ
16. REMARKS: NAWCWD (685200D) 0 1 0
NAWCWD (QA) 0 1 0
BLK 4: TAILOR DATA ITEM DESCRIPTION (DID) AS FOLLOWS: DELETE AFLCMC/EBHCB 0 1 0
PARA 2 AND SUBMIT ENGINEERING CHANGE PROPOSAL (ECP) ON DD CCRC-AR 0 1 0
FORM 1692. SUBMIT TEXT FILES IN GOVERNMENT COMPATIBLE
MICROSOFT WORD AND VIEW FILES IN GOVERNMENT COMPATIBLE
ADOBE ACROBAT. FOR DRAWINGS SUBMIT PDF VIEW FILES IN
GOVERNMENT COMPATIBLE ADOBE ACROBAT.
BLKS 10, 12, 13: THE CONTRACTOR SHALL PREPARE AND SUBMIT AN
ECP ON DD FORM 1692. DD FORM IS LOCATED AT:
http://www.dtic.mil/whs/directives/forms/dd/ddforms1500-1999.htm
BLK 14: SUBMIT VIA EMAIL OR AMRDEC SAFESITE IN ACCORDANCE
WITH ATTACHED LIST OF ADDRESSES FOR CDRLS.
15. TOTAL 0 5 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Jan Murphy 20161209
DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 6 of 14 Pages
Kristy Mosher for SDMO RDAR-EIS-PD 9 JAN 2017
U18C0715HI
SFAE-AMO-JP 0 1 0
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP ______________ TM ___________ OTHER __X_____________
E. CONTRACT / PR NO. F. CONTRACTOR D. SYSTEM/ITEM
LUG, SUSPENSION MK 3 MOD 0
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
B007 NOTICE OF REVISION (NOR)
4. AUTHORITY (Data Acquisition Documentation No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-80642D SECTION C NAWCWD (685200D)
7. DD 250 REQ. 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED
LT D ASREQ ASREQ b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT Final SUBMISSION a. ADDRESSEE Draft Reg Repro
A N/A ASREQ
16. REMARKS: NAWCWD (685200D) 0 1 0
NAWCWD (QA) 0 1 0
BLK 4: TAILOR DATA ITEM DESCRIPTION (DID) AS FOLLOWS: DELETE PARA AFLCMC/EBHCB 0 1 0
2 AND SUBMIT NOTICE OF REVISION (NOR) ON DD FORM 1695. CCRC-AR 0 1 0
BLKS 10, 12, 13: THE CONTRACTOR SHALL PREPARE AND SUBMIT A
NOR ON DD FORM 1695 FOR EACH DRAWING, ASSOCIATED LIST, OR
OTHER REFERENCED DOCUMENT WHICH REQUIRES REVISION AND
SUBMIT NOR WITH THE ECP. DD FORM IS LOCATED AT:
http://www.dtic.mil/whs/directives/forms/dd/ddforms1500-1999.htm
BLK 14: SUBMIT VIA EMAIL OR AMRDEC SAFESITE IN ACCORDANCE
WITH ATTACHED LIST OF ADDRESSES FOR CDRLS.
15. TOTAL 0 5 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Jan Murphy 20161209
DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 7 of 14 Pages
K. Mosher for SDMO RDAR-EIS-PD 9 JAN 2017
U18C0715HI
010SFAE-AMO-JP
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP ______________ TM ___________ OTHER __X_____________
E. CONTRACT / PR NO. F. CONTRACTOR D. SYSTEM/ITEM
LUG, SUSPENSION MK 3 MOD 0
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
B008 TEST/INSPECTION REPORT FIRST ARTICLE ACCEPTANCE TEST REPORT
4. AUTHORITY (Data Acquisition Documentation No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-NDTI-80809B SECTION E AMSJM-QAP
7. DD 250 REQ. 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED
LT D ONE/R ASREQ b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT Final SUBMISSION a. ADDRESSEE Draft Reg Repro
A N/A ASREQ
16. REMARKS: AMSJM-QAP 0 1 0
NAWCWD (685200D) 0 1 0
NAWCWD (QA) 0 1 0
AFLCMC/EBHCB 0 1 0
DCMA-MCWB (QAR) 0 1 0
CCRC-AR 0 1 0
BLKS 10, 12, 13: THE FIRST ARTICLE TEST (FAT) REPORT SHALL BE
SUBMITTED WITH QAR FINDINGS ON DD FORM 1222. FAT REPORT SHALL
BE SUBMITTED WITHIN 30 CALENDAR DAYS AFTER COMPLETION OF
FAT. THE GOVERNMENT REQUIRES 30 CALENDAR DAYS FOR REVIEW.
DISPOSITION OF THE FAT REPORT WILL BE PROVIDED THROUGH THE
PCO. FAT MUST BE APPROVED PRIOR TO PRODUCTION.
BLK 13: IF FURTHER REVISIONS ARE NECESSARY, THE CONTRACTOR
SHALL HAVE 15 CALENDAR DAYS TO GENERATE REVISIONS AND THE
GOVERNMENT SHALL HAVE 15 CALENDAR DAYS TO REVIEW AND
RESPOND.
BLK 14: SUBMIT VIA EMAIL OR AMRDEC SAFESITE IN ACCORDANCE
WITH ATTACHED LIST OF ADDRESSES FOR CDRLS.
15. TOTAL 0 7 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Jan Murphy 20161209
DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 8 of 14 Pages
K. Mosher for SDMO RDAR-EIS-PD 9 JAN 2017
U18C0715HI
SFAE-AMO-JP 0 1 0
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP ______________ TM ___________ OTHER __X_____________
E. CONTRACT / PR NO. F. CONTRACTOR D. SYSTEM/ITEM
LUG, SUSPENSION MK 3 MOD 0
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
TEST/INSPECTION REPORT LOT ACCEPTANCE TEST REPORT
4. AUTHORITY (Data Acquisition Documentation No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-NDTI-80809B SECTION E DCMA-MCWB (QAR)
7. DD 250 REQ. 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED
LT D ASREQ ASREQ b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT Final
a. ADDRESSEE Draft Reg Repro
A N/A
SUBMISSION
ASREQ
16. REMARKS: DCMA-MCWB (QAR) 0 1 0
WARP 0 1 0BLK 4: LAT REPORTS SHALL CONTAIN ALL INSPECTION RECORDS OF
CLASSIFIED CHARACTERISTIC SAMPLES AND ANY OTHER TESTS
REQUIRED FOR EACH LOT PER THE CONTRACT.
BLKS 10, 12, 13: SUBMISSION OF LOT ACCEPTANCE TEST (LAT)
REPORTS AND PRODUCTION ACCEPTANCE TEST REPORTS SHALL
BE NO LATER THAN 30 DAYS AFTER LAT. THE QAR WILL PROVIDE
DISPOSITION OF LOT/PRODUCTION ACCEPTANCE TEST REPORTS.
LAT REPORTS SHALL BE SUBMITTED BY ACCESSING THE
WORLDWIDE AMMUNITION DATA CARD REPOSITORY PROGRAM
(WARP) WHICH IS LOCATED ON THE MUNITIONS HISTORY PROGRAM
(MHP) WEBSITE AT HTTPS://MHP.REDSTONE.ARMY.MIL/.
15. TOTAL 0 7 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Jan Murphy 20161209
DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 9 of 14 Pages
K. Mosher for SDMO RDAR-EIS-PD 9 JAN 2017
U18C0715HI
B
B009
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP ______________ TM ___________ OTHER __X_____________
E. CONTRACT / PR NO. F. CONTRACTOR D. SYSTEM/ITEM
LUG, SUSPENSION MK 3 MOD 0
1. DATA ITEM NO. 3. SUBTITLE
B010 AMMUNITION DATA CARD
4. AUTHORITY (Data Acquisition Documentation No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-80043B SECTION C, MIL-STD-1168 AMSJM-QAP
7. DD 250 REQ. 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED
NO D ASREQ ASREQ b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT Final SUBMISSION a. ADDRESSEE Draft Reg Repro
N/A N/A ASREQ
16. REMARKS: DCMA-MCWB (QAR) 0 1 0
WARP 0 1 0
BLKS 10, 12, 13: AMMUNITION DATA CARDS (ADC) SHALL BE PREPARED
IAW MIL-STD-1168B, SECTION C SOW, AND THIS CDRL BY ACCESSING
THE WORLDWIDE AMMUNITION DATA REPOSITORY PROGRAM (WARP),
WHICH IS LOCATED AT HTTPS://MHP.REDSTONE.ARMY.MIL.
*HARD COPY ADCS PROVIDED WITH LOT SHIPMENTS SHALL BE
GENERATED FROM THE WARP PROGRAM AND SIGNED AND DATED BY
THE GOVERNMENT AGENCY RESPONSIBLE FOR ACCEPTANCE (GARA).
15. TOTAL 0 10 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Jan Murphy 20161209
DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 10 of 14 Pages
K. Mosher for SDMO RDAR-EIS-PD 9 JAN 2017
U18C0715HI
B
NAWC-WD, China Lake, CA 93555-6100
**WHEN BALLISTIC TESTS ARE REQUIRED, ONE HARD COPY
GENERATED FROM THE WARP PROGRAM SIGNED AND DATED BY THE
GARA SHALL BE SENT TO THE PROVING GROUND WITH SAMPLE
SHIPMENT, PLUS AN ADDITIONAL SIGNED, HARD COPY PROVIDED TO
THE PROVING GROUND BY MAIL.
BLK 14: SUBMIT VIA EMAIL OR AMRDEC SAFESITE IN ACCORDANCE
WITH ATTACHED LIST OF ADDRESSES FOR CDRLS.
A SAMPLE ADC SHALL BE DEVELOPED AND SUBMITTED TO THE
WARP SYSTEM 30 DAYS PRIOR TO FIRST ARTICLE TESTING OR 30
DAYS PRIOR TO PRODUCTION IN THE EVENT A FIRST ARTICLE IS NOT
REQUIRED.
LOT SHIPMENT*
MAIL TO DEST**
0 2 0 2 0
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP ______________ TM ___________ OTHER __X_____________
E. CONTRACT / PR NO. F. CONTRACTOR D. SYSTEM/ITEM
LUG, SUSPENSION MK 3 MOD 0
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
FAILURE ANALYSIS AND CORRECTIVE ACTION
REPORT (FACAR)
4. AUTHORITY (Data Acquisition Documentation No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-81315B QAP Bomb Bodies (Empty) Rev H AMSJM-QAP
7. DD 250 REQ. 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED
LT D ASREQ ASREQ b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT Final SUBMISSION a. ADDRESSEE Draft Reg Repro
A N/A ASREQ
16. REMARKS: AMSJM-QAP 0 1 0
NAWCWD (685200D) 0 1 0
BLK 5: THE FAILURE ANALYSIS AND CORRECTIVE ACTION REPORT NAWCWD (QA) 0 1 0
(FACAR) SHALL BE IN ACCORDANCE WITH THE QUALITY ASSURANCE AFLCMC/EBHCB 0 1 0
PROVISION (QAP). DCMA-MCWB (QAR) 0 1 0
CCRC-AR 0 1 0
BLKS 10, 12, 13: CONTRACTOR SHALL NOTIFY DISTRIBUTION LIST VIA
EMAIL WITHIN 24 HOURS AFTER THE OCCURRENCE OF A FAILURE
DURING ACCEPTANCE TESTING; INCLUDING, BUT NOT LIMITED TO, ANY
FAILURES DURING FAT/LAT AND ANY DESTRUCTIVE/NONDESTRUCTIVE
TEST FAILURES. FORMAL SUBMITTAL SHALL BE NO LATER THAN 10 DAYS
AFTER REPORTED FAILURE. FINAL REPORT SHALL BE SUBMITTED NO
LATER THAN 30 DAYS AFTER DETERMINING/CONDUCTING ROOT CAUSE
FAILURE ANALYSIS. GOVERNMENT COMMENTS SHALL BE RESOLVED
PRIOR TO PRESENTING PRODUCT FOR ACCEPTANCE.
BLK 14: SUBMIT VIA EMAIL OR AMRDEC SAFESITE IN ACCORDANCE WITH
ATTACHED LIST OF ADDRESSES FOR CDRLS.
15. TOTAL 0 7 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Jan Murphy 20161209
DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 11 of 14 Pages
K. Mosher for SDMO RDAR-EIS-PD 9 JAN 2017
U18C0715HI
SFAE-AMO-JP 0 1 0
B
B011
1. DATA ITEM NO. 17. PRICE
GROUP
B012
18. ESTIMATED
TOTAL PRICE
NO
8. APP CODE
0 1 0
0 1 0
Page: 13 of 14DD Form 1423-1, FEB 2001 Previous editions may be used.
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Kristy Mosher for SDMO, RDAR-EIS-PD
DELETE REFERENCE 'APPLYING OPSEC TO U.S. GOVERNMENT CONTRACTS'. REPLACE WITH REFERENCE 'SAMPLE ACQUISITIONS OPSEC PLAN'. 10 CALENDAR DAYS REQUIRED FOR GOVERNMENT REVIEW AND APPROVAL. *30 CALENDAR DAYS AFTER THE CONTRACTING OFFICER PROVIDES THE LIST OF KNOWN
CRITICAL INFORMATION (CI)/THREAT INFORMATION. ** RESUBMIT 10 CALENDAR DAYS AFTER
GOVERNMENT REVIEW. SUBMIT ELECTRONICALLY TO usarmy.ria.jmc.mbx.OPSEC-FD@mail.mil.
PCO
A ASREQ Reg Repro
ASREQ**
16. REMARKS AMSJM-OPP
D
ONE/R ASREQ*
a. ADDRESSEE
b. COPIES
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
Draft
Final
7. DD 250 REQ
9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MGMT-80934C Section H AMSJM-OPP
2. TITLE OF DATA ITEM 3. SUBTITLE
Operations Security (OPSEC) Plan OPSEC Program
TDP____________ TM____________ OTHER____________
D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
Form Approved OMB No. 0704-0188
9 JAN 2017
U18C0715HILUG, SUSPENSION MK 3 MOD 0
0 3 0
FOR GOVERNMENT PERSONNEL FOR THE CONTRACTOR
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award). Item F. Self-explanatory (to be filled in after contract award). Item G. Signature of preparer of
CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data. These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required.
The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423 (BACK)
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
INSTRUCTIONS FOR COMPLETING DD FORM 1423
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
| 80934A__bomb_opsec.pdf |
| 80934a |
| INSTRUCTIONS_for_adding.pdf |
| 80603L |
| 80934a |
| 80639 |
| 80640 |
| 80642 |
| 81722 |
| 80043 |
| 81307 |
| 81315 |
| 80809B |
| 81987spc |
| Instructions |
| spc_81987.pdf |
| 81987_spc |