Attachment_0006_HL8_QASP-PRS_20160726.pdf
PDF 226 KB Posted
- Attached to
- Heavy Lift 8 (HL8) Federal contract opportunity
- Solicitation number
- W52P1J-16-R-0027
About this file
Attachment 0006 HL8 QASP - PRS
View the file
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan
And
Performance Requirements Summary
For
HEAVY LIFT 8 (HL8)
DATE:
July 26, 2016
Coordination and Approvals
Contracting Officer Representative
1st Sustainment Command (Theater) Operational Contracts Support
Administrative Contracting Officer
SUMMARY OF CHANGES
Revision History
REV Description of Change Author/ Editor Effective Date
TABLE OF CONTENTS
Subject Page
1. Overview 4
1.1. Purpose
1.2. Intent
1.3. Scope
1.4. QASP Changes
2. Description of Services 5
3. Roles and Responsibilities 5
4. Roles and Responsibilities of Contractor 6
5. Contract Quality Requirements 7
6. Government Surveillance
6.1. Methods of Quality
Assurance 7
6.2. Monthly Surveillance Schedule 8
6.3. Inspection Instructions/Checklists 8
6.4. Documentation of Inspections 8
6.5. Combat Trafficking in Persons 8
7. Non-Conforming Performance 9
7.1. Customer Feedback/Complaints
7.2. Non-Conformance Reports (NCR)
8. Data Analysis 10
9. Acceptance of Services 10
10. Monthly COR Activity Report 10
11. Contractor Manpower Reporting (CMR) 11
12. Synchronized Pre-deployment and Operational Tracker (SPOT) 11
13. Quality Assurance Surveillance File 12
14. Contractor Performance Assessment Reporting System (CPARS) 12
15. Record Retention 12
16. Reference Materials 12
Attachment: QASP Matrix 13
1. OVERVIEW
1.1. Purpose. The purpose of this plan and Performance Requirements Summary (PRS) is to identify the methods and procedures the Government will use to ensure it receives the services/products under this contract as identified in the Performance Work Statement (PWS).
1.1.1. The purpose of the Quality Assurance Surveillance Plan (QASP) is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the Contractor is meeting the performance standards/quality levels identified in the Performance Work Statement (PWS) and the Contractor’s quality control plan (QCP), and to ensure that the Government pays only for the level of services received.
1.1.2. This QASP does not detail how the Contractor accomplishes the work. Rather, the QASP is created with the premise that the Contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.
1.2. Intent. The intent of this plan is to hold the Contractor accountable for quality control and to encourage the Contractor to take appropriate steps to control and improve quality. The Contractor is responsible to develop an efficient methodology to ensure they meet and/or exceed the required thresholds of service as outlined in this acquisition. The Government intends to perform surveillance on this contract in accordance with this QASP and PRS items listed in Attachment 1 below, but reserves the right to monitor the contract in any manner necessary, at any times necessary, and at all places necessary to ensure that the rendered services conform to contract requirements. The Government reserves the right to perform quality assurance at the subcontract level and perform quality assurance at the Contractor's place of business, if applicable. Non-conforming services discovered with subcontractors will be addressed with the prime Contractor for resolution.
1.3. Scope. It is important to understand the responsibilities of the parties and distinguish between the quality control plan and the QASP. The Contractor is responsible for managing and developing a quality control (QC) plan to meet the quality standards established in the performance work statement (PWS). The QASP is put in place to provide the Government surveillance and oversight of the Contractor’s efforts in fulfilling the terms of the contract. The QASP is not part of the contract nor is it intended to duplicate the Contractor’s quality control plan.
1.4. QASP Changes. This QASP and PRS is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the Contractor. Updates shall ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions shall be provided to the Government officials implementing surveillance activities.
1.4.1. Revisions to this QASP are the joint responsibility of the Requiring Activity, Contracting Officer and Contracting Officer’s Representative. The Contracting Officer’s Representative reviews the PWS and QASP annually or as issued modification change a need and will provide proposed changes, if necessary, through the Requiring Activity Command to the Contracting Officer for review and approval.
2. DESCRIPTION OF SERVICES
2.1. Scope of Work. Heavy Lift Eight (HL8) operations accomplish line haul, heavy lift (HL), and personnel transportation services throughout the U.S. Central Command (CENTCOM) Area of Responsibility (AOR) in support of the Theater Transportation Mission. The Contractor will acquire transportation assets for the movement of various types of equipment, cargo and PAX movement within the Theater of Operations. This shall include all areas within the CENTCOM AOR, which includes, but is not limited to the following countries: Afghanistan, Bahrain, Egypt, Iran, Iraq, Jordan, Kazakhstan, Kuwait, Kyrgyzstan, Lebanon, Oman, Pakistan, Qatar, Saudi Arabia, Syria, Tajikistan, Turkmenistan, United Arab Emirates, Uzbekistan and Yemen, as designated by the United States Government (USG). All vehicles, associated equipment and services provided shall be safely operable; shall meet the intended function and operations of like new conditions, without safety or mechanical defects that affect mission readiness of safe execution thereof; and be in accordance with (IAW) the PWS, the contract and local laws and regulations. Trained, qualified and properly licensed operators will be able to operate vehicles and other items as directed to accomplish the mission. The Contractor will properly secure loads per Army standards and quickly and safely transport loads as directed. The Contactor shall recover disabled equipment and their loads and repair/replace disabled equipment per the intent of this contract. The Contractor shall protect as required the assets and personnel the Government requires to be transported by commercial contract by ensuring all equipment is in proper and safe working condition and all personnel are licensed and trained on equipment being operated.
2.2. Contract. Contract awarded as a Firm Fixed Unit Price (FFUP) Indefinite Delivery Indefinite Quantity (IDIQ) contract subject to FAR Clause 52.246-4, Inspection of Services—Fixed Price.
3. ROLES AND RESPONSIBILITIES
3.1. Contracting Officer (KO). The KO has overall responsibility for overseeing the Contractor’s performance. The KO is responsible for the day-to-day monitoring of the Contractor’s performance in the areas of contract compliance, and contract administration; reviewing the COR’s assessment of the Contractor’s performance; and resolving all differences between the COR’s assessment and the Contractor’s assessment of performance. The KO ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. Only the KO is authorized to bind the Government and then, only to the extent of the authority delegated to them through the issuance of a warrant. It is the KO that assures the Contractor receives impartial, fair and equitable treatment under the contract.
The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.
3.2. Contract Specialist/Administrator. The official Government representative delegated authority by the Contracting Officer to administer a contract. This individual is normally a member of the appropriate Contracting/Procurement career field and advises on all technical contractual matters.
3.3. Contracting Officer’s Representative (COR). The COR is an individual designated in writing by the KO to provide detailed technical oversight of the Contractor’s performance and reports his or her findings to the Contracting Officer in a timely, complete and impartial fashion to ensure the Government receives the services procured in accordance with the PWS. While the COR may serve as a direct conduit to provide Government surveillance and feedback to the
Contracting Officer on the Contractor’s technical performance, he or she is not empowered to make any contractual commitments or authorize any contractual changes on the Government’s behalf. Any changes that may affect contract price, terms, or conditions shall be referred to the Contracting Officer for action.
3.3.1. The COR conducts and maintains surveillance documentation.
3.3.2. The COR recommends improvements to the QASP and PWS throughout the life of the contract.
4. ROLES AND RESPONSIBILITIES OF CONTRACTOR
4.1. Contract Manager. The Contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the Contractor when the manager is absent shall be designated in writing to the Contracting Officer. Both the contract manager and alternate shall speak, read and write fluently in English and have full authority to act for the Contractor on all contract matters relating to daily operations of this contract. Fluency level is defined in Annex E, Level 9-12 of the PWS.
4.2. Project Manager. Project Manager: The contractor shall appoint in writing to the ACO a project manager who shall be the contractor's central point of contact with the USG and shall be authorized to direct performance of all work under the contract. The project manager shall have knowledge of all regulatory and contractual policies, procedures, and documentation relative to or required by the PWS, and shall be responsible for enforcement of all contractual obligations as directed by the contract, the PWS, and ACO. The project manager shall be the contractor’s in-house supervisor in all respects. For example, only the project manager, not USG personnel will have the authority to change an individual contract employee’s work hours, to act upon contract employee’s leave requests, to assign work or to change the nature of a contract employee’s duties. Attempts by USG employees to exercise these functions, other than from the ACO through the project manager as indicated in this paragraph, shall be null and void. The project manager must meet the language requirements in Annex E of the PWS.
4.3. Alternate Project Manager. The Contractor shall appoint in writing to the ACO an alternate project manager who shall be designated to act for the project manager during any absence of the project manager and such person shall be available on site. Contractor shall provide written, advance notice of such designation to the ACO. The alternate project manager must meet the language requirements in Annex E of the PWS.
5. CONTRACT QUALITY CONTROL REQUIREMENTS
5.1. Quality Control Plan. The Contractor's Quality Control Plan (QCP) requirements are defined in paragraph 2.6.1 of the PWS. The Contractor shall develop and maintain an effective QCP which incorporates the development and implementation of procedures to identify, prevent, and ensure non-recurrence of defective services. As a minimum the QC plan will address the areas identified in this QASP and Performance Requirements Summary (PRS)(Attachment 1 below). The application of the QC program/procedures will assure the Contractor meets the requirements of this contract. The QC plan will be delivered after award but prior to beginning of performance period.
5.2. Government Quality Assurance. The Government will perform Quality Assurance oversight of the Contractor and Contractor’s QCP IAW with this QASP and FAR Part 46, as it applies, to ensure acceptable levels of contract performance are achieved and that the Contractor is performing acceptable levels of Quality Control to ensure fully acceptable services are provided.
6. GOVERNMENT SURVEILLANCE
6.1. Methods of QA Surveillance. The method of surveillance is based on the performance criteria of the contract terms and specifications. Each requirement will describe the tasks to be performed and the standard for successful performance. The specific surveillance method for each performance standard and acceptable quality level is listed in the “Surveillance Method” column of the QASP Matrix and PRS (Attachment 1 below). The Government intends to monitor and evaluate the Contractor's performance based on any or all of the following four surveillance methods:
6.1.1. 100 Percent Inspection. Performance will be inspected/evaluated at each occurrence as noted on the surveillance schedule. Reserved for the highest risk areas where consequence of failure is high (i.e. life or limbs are threatened) or there is likelihood of mission failure.
6.1.2. Periodic Inspection. This method consists of selected surveillance tasks by the Government, generally on a planned schedule that does not require 100% inspection, or are performed on a random/infrequent basis. The COR will evaluate the Contractors reports, surveys, etc. on a weekly, biweekly, monthly or quarterly basis.
6.1.3. Random Inspections. This method is designed to evaluate the outputs of the award requirement by observation on an unscheduled basis.
6.1.4. Periodic/Random Sampling. A randomization tool such as the one recommended by DAU at http://www.randomizer.org/ shall be used in creating and selecting true random sets.
a. Periodic – Planned sampling of a service at specific predetermined dates and times.
May be appropriate for tasks that occur infrequently.
b. Random - When a service is performed relatively frequently and a statistically valid sample can be selected for audit. The most appropriate method for frequently recurring tasks.
6.2. Monthly Surveillance Schedule. The COR will develop a monthly schedule of surveillance activities based on the Performance Standards as outlined in the QASP Matrix and PRS (Attachment 1 below) as well as any other critical contractual requirements determined to be higher risk requiring oversight. The surveillance outlined in the monthly schedule will be as detailed and in-depth as necessary to provide the Government with the objective quality evidence required to support acceptance of the services provided by the Contractor. The schedule will provide planned periodic surveillance during all required hours of the Contractor’s operation. The schedule is “FOR OFFICIAL USE ONLY” and is not releasable to anyone other than authorized Government personnel. The schedule will identify the method of surveillance, the date of inspection, place of inspection, activity to be monitored, and who will conduct the surveillance (dates and times can be altered without a formal change to the schedule as long as all inspections are performed). The Contracting Battalion surveillance schedule shall be used to plan and scheduled monthly surveillance. The monthly schedule will be completed no later than seven calendar days prior to the beginning of the period it covers and a copy loaded within the Contracting Officer Representative Tool (CORT), http://wawf.eb.mil, for the KO to review.
http://www.randomizer.org/
Additionally, if any issues are experience with CORT, these documents will be directly uploaded into the contract Paperless Contract File (PCF) cabinet at https://pcf.army.mil.
6.3. Inspection Instructions/Checklists. The COR will develop inspection instructions/checklists for all planned inspections which may require special instructions on how to perform the inspection, what observations should be made with specific details of what to look for acceptable performance. The Contracting Battalion Surveillance Checklist shall be used for the above purpose.
6.4. Documentation of Inspections. All audits/inspections/observations will be documented and will include as a minimum date and time, who performed the inspection, what was inspected, to what standard and the results. Successful or exceptional performance will be documented as well as deficiencies in Contractor performance. Documentation will be maintained for future reference, audit, proof of inspection, and past performance documentation. The Contracting Battalion Surveillance Checklist shall be used for the above purpose and filed in the CORT online file (https://wawf.eb.mil) and PCF. All inspections documents will be loaded to the file no later than the 25th of each month.
6.5. Combat Trafficking in Persons. See US Department of State website, http://www.state.gov/j/tip/rls/tiprpt/2012/192363.htm for Tier location requirements. The COR shall ensure that contractors are in compliance with FAR 52.222-50 at CTIP Tier 1 locations.
For Tier 2, Tier 2 Watch List (WL), and Tier 3 locations, CORs shall ensure that contractors are in compliance with Tier 1 requirements in addition to performing spot checks, reviews, and assessments of contractor and subcontractor employees to identify indicators of CTIP. In the event indicators are identified, the COR shall notify the KO immediately.
6.5.1. The COR shall use the Contracting Battalion checklist when conducting CTIP surveillance. CTIP surveillance reporting will be completed biannually and submitted to the KO no later than (NLT) the last working day of the months of June and November.
6.5.2. CORs should not personally investigate suspected incidents of Trafficking in Persons but should forward all reported or suspected violations to the Contracting Officer immediately.
7. Non-Conforming Performance. The COR will notify the Contractor, in person, each time an unacceptable observation has been recorded and ask the Contractor to correct the problem or re-accomplish the service. All valid non-conformances observed by the Government will be documented! The COR will record the contract requirement, the specific deficiency to the requirement, the date and time it was discovered, and have the Contractor initial the entry. The Contractor will be given a time line after notification to correct the deficiency in accordance with requirements of the contract. Deficiencies that cannot be corrected within the identified time line will be reported to the KO. The approved Contracting Battalion nonconformance report (NCR) form shall be used to document all contractual nonconformance’ to include issues. All NCRs shall be logged into the NCR Log. Only KOs shall issue NCRs to the Contractor.
7.1. Customer Feedback. For customer feedback or complaints it is recommended that the Customer Complaint Record DA Form 5477 http://armypubs.army.mil/eforms/pdf/A5477.PDF be used. However customer feedback can be in any form, verbal or written but no matter the format the COR will maintain a record of the feedback positive or negative.
https://pcf.army.mil/ https://wawf.eb.mil/ http://www.state.gov/j/tip/rls/tiprpt/2012/192363.htm http://armypubs.army.mil/eforms/pdf/A5477.PDF
a. If immediate response to a complaint is required, the COR will provide the response to the requester as soon as practical.
b. The COR will conduct an investigation to determine the validity of any negative comments received. COR has three business days to validate complaints.
c. If the negative comment is determined not to be valid, if possible, the COR will inform customer of the reason(s) as soon as practical.
d. For validated negative comments that are true contractual non-conformances see paragraph 7. If this non-conformance is a more serious (systemic in nature) deficiency or recurring deficiency that could indicate a trend the COR should see paragraph 7.2.
e. The COR will document customer complaints in the Customer Complaint Log. The Customer Complaint Log aggregates the data enabling the COR to note patterns and trends.
f. The COR will follow up with the customer of the corrective action taken by the Contractor, if applicable.
7.2. Non-Conformance Reports (NCR). The COR will report more serious (systemic in nature) deficiencies or recurring deficiencies that could indicate a trend by using the Contracting Battalion non-conformance report. The Non-Conformance Report will state the Contract Requirement, the specific contract reference and the specific violation (s) to the requirement.
7.2.1. The COR will forward copies of Non-Conformance Report to the KO within one working day.
7.2.2. The KO will notify the Contractor and request corrective action to the specific non-conformance, identification of the root cause and corrective action for the root cause with a required suspense date. The KO may require the Contractor to re-perform any services that do not meet contract requirements at no additional cost to the Government.
7.2.3. The Contractor will return a copy of the completed and signed Non-Conformance Report along with their Corrective Action Plan (CAP) to the KO for review, approval and inclusion in the contract/order file.
7.2.4. The KO should include the COR in the review of the CAP and re-inspection of services that were found deficient to ensure the CAP included adequate root cause analysis, corrective action for the root cause and that it was accomplished in the timeframe agreed upon. The KO and COR will not consider the NCR closed until all deficiencies have been corrected and all agreed upon actions of the CAP have been completed. Contractor’s failure to follow through and complete corrective actions will be reported immediately to the KO for further action. (Note:
if the COR has to repeatedly perform re-inspection there could be a Government re-inspection cost which could be recovered from the Contractor).
7.2.5. The COR will also follow-up after the Contractor has completed the corrective action to ensure that the Contractor’s corrective action was sufficient to preclude recurrence.
8. Data Analysis. COR shall perform and document analysis of available data monthly and make adjustments to surveillance schedule as required based on results of analysis. Analysis shall be used to look for and document trends in performance which may indicate shifts in performance risk that could result in increased or reduced surveillance. Data can be based on Government observations or Contractor observations. Negative trends noted using
Government observations could result in issuing Contractor a Contract Deficiency Report (CDR). Trends noted using Contractor data should never result in a CDR unless the Contractor is not addressing the negative trend. Documentation of data analysis will be in the Monthly COR Activity Report.
9. Acceptance of Services. When all services have been deemed acceptable and there is documented objective quality evidence to support acceptable performance the COR will accept the services provided and authorize payment upon satisfactory completion of the work. This is done by approving the Contractor’s invoice in Wide Area Workflow (WAWF) https://wawf.eb.mil/.
10. Monthly COR Activity Report. The COR will submit a brief monthly activity report to the KO which will include the next month’s surveillance schedule, summary of inspections performed with results, summary of customer complaints with analysis, summary of contract discrepancies, results of data analysis, recommended adjustments to surveillance, invoices accepted and any other pertinent contract activities.
10.1. By the 5th day of the month, the COR will complete the Monthly Report and upload to CORT (or PCF, if necessary) for KO review and acceptance or rejection. The COR will use the criteria listed below when rating the Contactor’s Quality of Work. In the Contactor’s Quality of Work comment box the COR will include a summary of inspections performed, summary of customer complaints, summary of contract discrepancies, recommended adjustments to surveillance and any other pertinent contract activities. In the individual question comments box, the COR will include a detailed summary of observations as it pertains to the individual question.
10.2. Rating Criteria. Contractor quality of work ratings and criteria are described below in accordance with Contracting Officer Performance Assessment Reporting System (FAR Table 42-1):
Rating Definition Note
(a) Exceptional Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
To justify an Exceptional rating, identify multiple significant events and state how they were of benefit to the Government. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
(b) Very Good Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
To justify a Very Good rating, identify a significant event and state how it was a benefit to the Government.
There should have been no significant weaknesses identified.
https://wawf.eb.mil/
(c) Satisfactory Performance meets contractual requirements.
The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract/order. There should have been NO significant weaknesses identified. A fundamental principle of assigning ratings is that contractors will not be evaluated with a rating lower than Satisfactory solely for not performing beyond the requirements of the contract/order.
(d) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
To justify Marginal performance, identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the Government. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g., management, quality, safety, or environmental deficiency report or letter).
(e) Unsatisfactory
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
To justify an Unsatisfactory rating, identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the Government. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g., management, quality, safety, or environmental deficiency reports, or letters).
11. Contractor Manpower Reporting (CMR). In accordance with Office of the Secretary of Defense Memorandum, Enterprise-wide Contractor Manpower Reporting Application, dated 28 Nov 2012, the Contractor must report contractor manpower to the Contractor Manpower Reporting website at http://www.ecmra.mil. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. The COR shall verify that the Contactor has complied with the required contractor manpower reporting annually and document the results in the CORT, CORs’ Online File, CMRA section. (Verify applicability IAW COR Appointment Memorandum.)
12. Synchronized Pre-deployment and Operational Tracker (SPOT). On 25 January 2007, Office of the Secretary of Defense designated SPOT as the central repository for information on Contractors Authorized to Accompany United States Forces (CAAF). When DFARS Clause 252.225-7039 or 252.225-7040 are applied to the contract the COR shall verify all SPOT data is complete, accurate and up to date on a monthly basis. Verification information shall be included on the Monthly COR report. (Verify applicability IAW COR Appointment Memorandum.)
13. Quality Assurance Surveillance File. The official COR Quality Assurance Surveillance File will be maintained in the on-line COR Management Tool https://arc.army.mil/COR per ACC PAM 70-1. The Quality Assurance, or COR Surveillance file shall contain the following as applicable:
a. Copy of the COR designation letter from the KO, any changes to that letter, and any termination letters.
b. Training Certifications for COR and refresher training.
c. Copy of the contract and all contract modifications.
d. Copy of the applicable Quality Assurance Surveillance Plan (QASP).
e. Copy of the Contractor’s Quality Control Plan (QCP)
f. All correspondence initiated by authorized representatives (Contractor or Government) concerning performance of the contract.
g. Names, position titles and contact information of all key personnel assigned to this contract both Government and Contractor.
h. Monthly surveillance schedules.
i. Surveillance Checklists
j. Records of all inspections performed and the results.
k. Customer Feedback.
l. Memoranda for record of minutes of any meeting, telephone conversations and discussions with the Contractor or others pertaining to the contract or contract performance.
m. Documentation pertaining to acceptance of services, reports or data
14. Contractor Performance Assessment Reporting System (CPARS). Documented surveillance data IAW this QASP will be used as objective data to support CPARS ratings. The inclusion of detailed documented inspection results provides objectivity to CPARS reporting.
CPARS will be completed in accordance with AFARS, Subpart 5142.15 – Contractor Performance Information. (Verify applicability IAW COR Appointment Memorandum.)
15. Record Retention. All records will be retained for the life of this contract in accordance with FAR Subpart 4.805 – Storage, Handling, and Disposal of Contract Files. The COR/QAE shall ensure all record are uploaded into VCE per Army Contracting Command Pamphlet (ACC Pam) 70-1 and all hard copies will be forward to the KO upon completion of the contract/order.
16. Reference Material.
a. DoD COR Handbook, 22 March 2012
b. AR 70-13 – Management and Oversight of Service Acquisitions, 30 July 2010
c. AR 702-11 – Army Quality Program, 2 March 2007
d. ACC Pamphlet 70-1 – Interim Army Contracting Command – Contracting Officer’s
Representative Policy Guide, 26 March 2010 https://arc.army.mil/COR
Attachment 1: QASP and Performance Requirement Summary Matrix
Performance Objective
(The Service required— usually a shall statement)
Reference Standard
Acceptable Quality Level
(AQL)
(This is the maximum error rate. It could possibly be “Zero deviation from standard”)
Method of Surveillance
Incentives or Disincentives (% Deduction from monthly invoice for not meeting Performance Standards)
1. Combating Trafficking in Persons
FAR
52.222-50 Clauses:
952.222- 0001 &
KSCR1-2
The Contractor shall Notify its employees of (a) United States Government's zero tolerance policy (b) actions that will be taken against violators. (c) all clauses shall be incorporated in all subcontracts.
100% Compliance
100% Inspection, COR
Validation Bi- Annual (June & November)
Remedies IAW FAR Clause 52.222-50(e).
2. Shall develop, implement and maintain an effective Quality Control Program
(QCP).
PWS 2.6.1
a. Provide to the Government their quality control documentation after contract award but prior to beginning of performance period. 100%
Periodic
Inspection;
15 days of contract start and annually thereafter or as changes occur.
(October)
Negative performance will be documented as a NCR and in
CPARS/PIPRS
b. After acceptance of QCP, the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to its QC system.
3. Contracting Manpower Reporting
PWS 2.9 &
Solicitation Provision / Contract Clause
Completely fill in all the information in the format, and reported no later than October 31 of each calendar year.
Inspection, COR
Validation Annually
(November) be documented as a NCR and in
CPARS/PIPRS
4. Usage Report
PWS 5.2.1,
TE 1 & 2
Submit the equipment availability/usage report as defined by the COR to the
100% Accountabili ty
Periodic Inspection;
verify weekly
Negative be documented as supporting unit, the ACO/PCO and COR daily via email (copy to each).
reports were received.
a NCR and in
CPARS/PIPRS
5. Serious Incident Report
(SIR)
PWS 5.2.2,
TE 1 & 2
Clause 952.223-
a. Provide incident information immediately upon knowledge of incident event to the ACO and COR.
100% Accountabili ty
100% Inspection;
verify upon notification time it took to report and compliant to 952.223-001 format.
Negative performance will be documented as a NCR and in
CPARS/PIPRS
b. Any accidents involving civilians will be immediately report to the COR/ACO.
100% Accountabili ty
100% Inspection;
verify upon notification time it took to report and in compliance to 952.223- 001 format.
Negative performance will be documented as a NCR and in
CPARS/PIPRS
6. Summary Report
PWS 5.2.3,
TE 1 & 2
Provide a monthly report to the ACO (COR & PCO) summarizing: total miles driven, significant events and incident reports, and mechanical issue trend analysis via email.
Accountabili ty
100% Inspection;
verify once per month.
Negative performance will be documented as a NCR and in
CPARS/PIPRS
7. Equipment/ Vehicle Status Report
PWS 5.2.4,
TE 1 & 2
a. Provide vehicle status report twice daily to the COR and ACO via email.
100% Accountabili ty
100% Inspection;
verify weekly reports were received.
Negative performance will be documented as a NCR and in
CPARS/PIPRS
b. Approximate vehicle location of self-escorted convoys within one (1) hour upon request.
100% Inspection;
verify time compliance upon each request.
c. Down equipment during mission must contain:
vehicle number, time down, and estimate replace/repair time.
100% Inspection;
verify per mission of occurrence.
8. Personnel Report
PWS 5.2.5,
TE 1 & 2
a. Provide report weekly to the COR/ACO/PCO via email.
95% fill at all times
Periodic Inspection;
verify by the
Negative
4th day of the month.
a NCR and in
CPARS/PIPRS
b. Report shall contain: all employee’s names, nationality, visa, passport, license, civil ID number & badge expiration date.
Random Sample;
Random lot size of 24 on quarterly basis using
AQL 1%
9. Pre-mission Report
PWS 5.2.7,
TE 1 & 2
Annex J
Report listing employee’s name, visa number, passport information, license & civil ID number to COR/ACO/ PCO daily via email.
24-hrs prior to mission
Random Sample;
Random lot size of 24 on quarterly basis using
AQL 1%
Negative performance will be documented as a NCR and in
CPARS/PIPRS
10. Call Forward
PWS 5.3
TE 1
All operators and equipment will be delivered to the designated holding area.
1-hr prior to mission
Random Sample;
Random lot size of 24 on quarterly basis using
AQL 1%
Negative performance will be documented as a NCR and in
CPARS/PIPRS
11.
Operational Availability
PWS 5.4
TE 1
Number of vehicles and operators shall be available at all times per task order requirements.
100% per task order
Random Sample;
Random lot size of 24 on quarterly basis using
AQL 1%
Negative performance will be documented as a NCR and in
CPARS/PIPRS
12. Driver Actions/ Training
PWS 2.6.8,
TE 1,
Annex C
Maintain trained, qualified and properly licensed operators for assigned vehicles and equipment.
100% per task order
Periodic Inspection during scheduled audits which are based upon risk assessment;
After a valid Customer Complaint.
be documented as a NCR and in
CPARS/PIPRS
PWS 2.6.8,
TE 1,
Annex C
TB 55-20
CFR 49,
Sect. 393
Trained on proper block, brace and chain various types of cargo and rolling stock.
100% per task order
Periodic Surveillance:
during random operator and equipment acceptance
Negative performance will be documented as a NCR and in
CPARS/PIPRS
surveillance;
After a valid Customer Complaint.
PWS 2.6.8,
TE 1,
Annex C
Understand Army convoy procedures.
100% per task order
Periodic Inspection during scheduled audits (training record review); After a valid
Customer Complaint
Negative performance will be documented as a NCR and in
CPARS/PIPRS
PWS
2.6.14, TE 1,
Annex C
Trained as to proper loading, securing and transporting of designated equipment, vehicles, containers, pallets and other cargo.
100% per task order
Periodic Inspection during scheduled audits (training record review); After a valid
Customer Complaint
Negative performance will be documented as a NCR and in
CPARS/PIPRS
PWS
2.6.14, TE 1,
Annex C
Training plan within 30 days of contract award to KO.
100% per task order
Periodic Inspection;
45 days of contract award and annually thereafter or as changes occur.
(November) be documented as a NCR and in
CPARS/PIPRS
PWS 2.11
Will certify compliance for personnel recovery training for all US national contractor personnel deployed or deploying to COCOM.
100% Compliance
Periodic Inspection during scheduled audits (training record review);
Negative performance will be documented as a NCR and in
CPARS/PIPRS
13. CCR
Functions
PWS 4.3.9
TE 1
Annex K
a. Lead Driver must be able to speak, read and write in English fluent to Level 6-8.
100% per task order
Periodic Surveillance:
during random operator and
Negative performance will be documented as equipment acceptance surveillance;
After a valid Customer Complaint.
PWS 4.3.9
TE 1
Annex K
b. CCR must be familiar with Army Operations.
100% per task order
Periodic Surveillance:
during random operator and equipment acceptance surveillance;
After a valid Customer Complaint.
Negative performance will be documented as a NCR and in
CPARS/PIPRS
PWS 4.3.9
TE 1
Annex K
c. CCR must have capacity to organize, escort, control and direct other contractor employees while on mission.
100% per task order
Periodic Surveillance:
during random operator and equipment acceptance surveillance;
After a valid Customer Complaint.
Negative performance will be documented as a NCR and in
CPARS/PIPRS
PWS 4.3.9
TE 1
Annex K
d. Each convoy outside of Kuwait will have at least one
CCR.
100% per task order
Periodic Surveillance:
during random operator and equipment acceptance surveillance;
After a valid Customer Complaint.
Negative performance will be documented as a NCR and in
CPARS/PIPRS
PWS 4.3.9
TE 1
Annex K
e. Act as convoy Commander when US military do not escort convoy.
100% per task order
Periodic Surveillance:
during random operator and equipment acceptance surveillance;
After a valid
Negative performance will be documented as
14.Safety
PWS 2.8
TE 1
Annex F, SIR, TTPs
a. Personal Safety items will be worn at all times during missions in Intra Kuwait and AOR or as determined by the Convoy Commander or
TTP.
100% per task order
Periodic Surveillance:
during random operator and equipment acceptance surveillance;
After a valid Customer Complaint.
Negative performance will be documented as a NCR and in
CPARS/PIPRS
PWS 2.8
TE 1
Annex F, SIR, TTPs
b. PPE at a minimum will consist of: protective lenses, proper footwear, and reflective vest and hard hat.
100% per task order
Periodic Surveillance:
during random operator and equipment acceptance surveillance;
After a valid Customer Complaint.
Negative performance will be documented as a NCR and in
CPARS/PIPRS
PWS 2.8
TE 1
Annex F, SIR, TTPs
c. PPE of gloves will be issued and worn during loading, unloading and maintenance procedures.
100% per task order
Periodic Surveillance:
during random operator and equipment acceptance surveillance;
After a valid Customer Complaint.
Negative performance will be documented as a NCR and in
CPARS/PIPRS
15. CCR
Report
PWS 5.2.6,
6.12.7 & 6.12.8
TE 1 & 2
Provide CCR report within 24-hours of the close of each mission to the COR, ACO and PCO via email.
100% per task order
Random Sample;
Random lot size of 24 on quarterly basis using
AQL 1%
Negative performance will be documented as a NCR and in
CPARS/PIPRS
16. Safeguard Property
PWS
2.6.7.1 &
2.6.21
Responsible for safeguarding all government (GFP) and contractor property provided for contractor use.
100% Compliance
Periodic Inspection during scheduled audits; After an accident resulting in
Negative performance will be documented as damage or loss of GFP.
17. Utility Conservation
PWS
2.6.7.3
Shall instruct employees in utilities conservation practices.
*Note: This is usually only applicable to Government furnished utilities.
100% Compliance
Periodic Inspection during scheduled audits (training records);
After a valid Customer Complaint.
Negative performance will be documented as a NCR and in
CPARS/PIPRS
18. Contract Manager
PWS
2.6.11
Annex E
a. Shall provide a contract manager & alternate by name in writing to Contracting Officer.
100% Compliance
Periodic Inspection;
scheduled audits
Negative performance will be documented as a NCR and in
CPARS/PIPRS
PWS
2.6.11
Annex E
b. Shall speak, read and write fluently in English to Level 9-12.
100% Compliance
Periodic Inspection during scheduled audits (training records)
Negative performance will be documented as a NCR and in
CPARS/PIPRS
19. Project Manager (PM)
PWS 6.1
a. Shall appoint in writing to the ACO and central point of contact with the USG and shall be authorized to direct performance of all work under the contract.
100% Compliance
Periodic Inspection during scheduled audits
Negative performance will be documented as a NCR and in
CPARS/PIPRS
PWS 6.1
b. shall have knowledge of all regulatory and contractual policies, procedures, and documentation relative for enforcement of all contractual obligations
100% Compliance
Periodic Inspection during scheduled audits
Negative performance will be documented as a NCR and in
CPARS/PIPRS
PWS 6.1
c. Shall be the contractor’s in-house supervisor in all respects.
100% Compliance
Periodic Inspection during scheduled audits
Negative performance will be documented as a NCR and in
CPARS/PIPRS
PWS 6.1
D
d. Shall speak, read and write fluently in English to Level 9-12.
100% Compliance
Periodic Inspection during scheduled audits
Negative performance will be documented as
PWS
6.24
e. shall appoint in writing to the ACO an alternate PM, act for the PM during any absence, and such person shall be available on site.
100% Compliance
Periodic Inspection during scheduled audits
Negative performance will be documented as a NCR and in
CPARS/PIPRS
PWS 6.4
Annex D
f. Shall speak, read and write fluently in English to Level 9- 12.
100% Compliance
Periodic Inspection during scheduled audits
Negative performance will be documented as a NCR and in
CPARS/PIPRS
20.
Operational Security
(OPSEC)
Officer
PWS
6.7.3
Shall identify and train an individual on their staff to serve as their OPSEC officer.
100% Compliance
Periodic Inspection during scheduled audits
Negative performance will be documented as a NCR and in
CPARS/PIPRS
21. Contractor Personnel/ Employee
PWS
2.6.12
a. Contractor personnel are required to identify themselves when attending meetings, answering government telephones and any situation contractor status is not obvious.
100% Compliance
Periodic Inspection during scheduled audits; After a valid
Customer Complaint.
Negative performance will be documented as a NCR and in
CPARS/PIPRS
PWS 6.7 &
6.11
b. Signature block that clearly identify themselves as contractor employees.
100% Compliance
Periodic Inspection during scheduled audits; After a valid Customer Complaint.
Negative performance will be documented as a NCR and in
CPARS/PIPRS
PWS 6.7 &
6.11
c. All briefs prepared by a contractor employee will include a title slide which clearly and unambiguously identifies the brief as having been prepared or delivered by a contractor employee.
100% Compliance
Periodic Inspection during scheduled audits; After a valid Customer Complaint.
Negative performance will be documented as a NCR and in
CPARS/PIPRS
PWS 6.7
d. Contractor employee will clearly and unambiguously identify themselves as a contractor employee
100% Compliance
Periodic Inspection during scheduled
Negative supporting Heavy Lift Seven to the audience(s).
audits; After a valid Customer Complaint.
a NCR and in
CPARS/PIPRS
PWS 6.7,
6.10 & 6.11
e. Wear badges that clearly put others on notice that they are contractor employees, conspicuously visible between the waist & chest level while on the installations, visible from a minimum of 10 feet.
100% Compliance
Periodic Inspection during scheduled audits; After a valid Customer Complaint.
Negative performance will be documented as a NCR and in
CPARS/PIPRS
PWS
2.6.12
f. Shall carry at all times appropriate documentation required by Kuwait law & military regulations to access all camps, outposts, airports, naval/commercial sea ports, including border crossing documents and driver’s license.
100% Compliance
Periodic Inspection during scheduled audits; After a valid Customer Complaint.
Negative performance will be documented as a NCR and in
CPARS/PIPRS
PWS 6.13
g. [Personnel originating in the US] Will process through
CRC.
*Note: Not applicable to local hires or residents of Kuwait.
100% Compliance
Periodic Inspection during scheduled audits; After a valid Customer Complaint.
Negative performance will be documented as a NCR and in
CPARS/PIPRS
22. Licenses/ Passes
PWS
2.6.15
a. All operators/vehicles have required passes, including but not limited to:
proper civil identification cards, passports, licenses, visas, fees and permits to allow them to legally operate in Kuwait, Iraq, and the port areas.
*Note: Contractors or trucks with 15 or less days remaining before badge
100% Compliance
Periodic Surveillance:
during random operator and equipment acceptance surveillance;
After a valid Customer Complaint.
Negative performance will be documented as expiration shall not cross the border leaving Kuwait.
PWS
6.12.2
b. [If] Contractor employees shall be driving a vehicle onto the camp, they shall comply with ACEN-ASG- KU-PMO Annex K and complete an ASG-KU 190- 16.2, valid driver’s license, vehicle registration for the vehicle driving, insurance and installation access badge, unless it is in combination with installation access.
100% Compliance
Periodic Surveillance:
during random operator and equipment acceptance surveillance;
After a valid Customer Complaint.
Negative performance will be documented as a NCR and in
CPARS/PIPRS
23. Emergency Points of Contact
PWS
2.6.18
a. Shall provide the contracting officer a roster with names and phone numbers for operations personnel in Kuwait.
100% Compliance
Periodic Inspection;
45 days of contract start and on a regularly scheduled audit basis.
Negative performance will be documented as a NCR and in
CPARS/PIPRS
PWS
2.6.18
b. Minimum of three (3) personnel per eight (8) hour shift.
100% Compliance
Periodic Inspection;
45 days of contract start and on a regularly scheduled audit basis.
Negative performance will be documented as a NCR and in
CPARS/PIPRS
PWS
2.6.18
c. Personnel identified on the roster must be available by phone 24 hours per day, 365 days per year (366 during any leap year).
100% Compliance
Periodic Inspection;
45 days of contract start and on a regularly scheduled audit basis.
Negative performance will be documented as a NCR and in
CPARS/PIPRS
PWS
2.6.18
d. Authorized to make decisions during crisis on behalf of the contractor & must speak English fluently.
100% Compliance
Periodic Inspection;
45 days of contract start and on a regularly scheduled audit basis.
Negative performance will be documented as a NCR and in
CPARS/PIPRS
PWS
2.6.18
e. Contractor shall respond, as required by the ACO, 100% Compliance
Periodic Inspection;
45 days of
Negative within one hour from the time of notification.
contract start and on a regularly scheduled audit basis.
a NCR and in
CPARS/PIPRS
24. Insurance PWS 2.6.21
Insurance for all employees in the event of injury or death during the performance of this service; minimum life insurance per driver is
10,000 KWD.
100% Compliance
Periodic Inspection;
45 days of contract start and on a regularly scheduled audit basis.
Negative performance will be documented as a NCR and in
CPARS/PIPRS
25.
Maintenance
PWS 4.6
a. Provide a plan that demonstrates how both scheduled and unscheduled maintenance will be performed.
100% Compliance
Periodic Inspection;
45 days of contract start and on a regularly scheduled audit basis.
Negative performance will be documented as a NCR and in
CPARS/PIPRS
PWS 4.6
b. IAW manufacturer specifications and be maintained within same specifications at all time to be considered 100% FMC.
100% Compliance
Periodic Inspection;
45 days of contract start and on a regularly scheduled audit basis.
Negative performance will be documented as a NCR and in
CPARS/PIPRS
PWS 4.7
c. Perform daily preventive maintenance checks and services based upon a checklist (agreed upon by GOV and KTR) and forward validation to COR or technical team onsite.
100% Compliance
Random Sample;
Random lot size of 24 on quarterly basis using
AQL 1%
Negative performance will be documented as a NCR and in
CPARS/PIPRS
PWS
2.6.19
d. Location: Will have an established site for conducting maintenance, dispatch and refit procedures for equipment and personnel within 60kms of Camp Arifjan.
100% Compliance
Periodic Inspection;
45 days of contract start and on a regularly scheduled audit basis.
Negative performance will be documented as a NCR and in
CPARS/PIPRS
PWS
Annex H
e. Repair parts & Labor (Kuwait): shall provide all parts, labor, and expertise necessary to complete all required maintenance tasks.
100% Compliance
Periodic Inspection;
45 days of contract start and on a
Negative performance will be documented as regularly scheduled audit basis.
PWS
Annex H
f. Parts include, but are not limited to, those items that must be replaced due to scheduled replacement and / or non-serviceability, such as motors, axels, hydraulics, pumps, windshield wipers, tires, headlamps,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .