W52P1J15R0077-0004.pdf
PDF 14 KB Posted
- Solicitation number
- W52P1J15R0077
About this file
Answers to questions
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATT0001v3.pdf | ||
| W52P1J15R0077-0003.pdf | ||
| W52P1J15R0077-0002.pdf | ||
| ATT0003.pdf | ||
| ATT0002.pdf | ||
| ATT0004.pdf | ||
| ATT0005.xlsx | XLSX spreadsheet | |
| ATT0001v2.pdf | ||
| W52P1J_15_R_0077_0001.pdf | ||
| ATT0001v2.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Cost Plus Fixed Fee
0004 2015SEP24
W52P1J
ARMY CONTRACTING COMMAND - RI
ROCK ISLAND, IL 61299-8000
BLDGS 60 & 62
BRIAN J. EGLI
EMAIL: BRIAN.J.EGLI.CIV@MAIL.MIL
W52P1J-15-R-0077
2015SEP01
X
X
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 2
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: BRIAN J. EGLI
Buyer Office Symbol/Telephone Number: CCRC-DB/(309)782-3941
Type of Contract 1: Cost Plus Fixed Fee
Type of Contract 2: Firm Fixed Price
Kind of Contract: Service Contracts
*** End of Narrative A0000 ***
The purpose of this amendment is to answer questions for solicitation W52P1J-15-R-0077.
1) What level of contamination is required in the soil for the Government to view as an acceptable demonstration for HD surrogate removal efficiency (DRE).
Response: The soil will need to be spiked to demonstrate a removal efficiency of 99.99% and a threshold of .010 mg/kg
2) There are many surrogates that have been used at the stockpile sites to demonstrate DRE in incineration systems. Desorption is a different process and will require a study to determine what compound demonstrates the same behavior as HD under desorption process conditions. Has the Government identified a desorption surrogate for HD such that all bidders will be required to prove the system will work under worse case conditions?
RESPONSE: The government has not identified the simulant for the tests. The government is requesting that the offeror propose a simulant.
3) Would the Government be interested if the contractor could arrange a test with neat agent? This would increase the cost of the testing but it would eliminate any questions about the surrogate.
RESPONSE: The RFP is for testing a simulant of HD. Neat agent testing is not required in this RFP.
4) CR&E is quoting a rotary kiln desorption unit. The 2 yd3 /hr soil feed rate size for a rotary kiln is small and there are no units available that may be leased for the project. There are smaller test units approx. 1ft3 /hr and larger units that may be available for the test. The Larger units would be inefficient for the test but may be more appropriate for a full scale operation at the test conclusion. CR&E has access to a smaller unit that would not demonstrate the required 2 yd3 /hr but sizing doesn't appear to be in question as rotary kilns have been used to desorb contaminates in soils in all sizes and pollution abatement systems have also been demonstrated effective in small and very large sizes. The smaller unit could be used by the government to test various soils or solids in the future. Is the government interested in pursuing the testing with a unit that is larger and or smaller than the processing capability discussed in the RFP? Using a unit that is more compatible with industry will reduce the overall project cost
RESPONSE: The offeror is required to provide their proposed test plan. The smaller test unit can perform tests for the operating parameters. A unit is required that can process 2 cubic yards or greater /hour with the soil considered the most difficult to process spiked with simulant for the chemical warfare agent mustard.
5) A process system handling HD contaminated soil will require high dollar alloy steel for the desorption unit and vessels that handle the off gas. The HD surrogate is likely to be as corrosive as HD. Lower quality materials may be used for a short term test but if the government decided to purchase the unit all materials would have to be upgraded. Is the Government interested performing the test with a desorption system fabricated from lower grade materials?
RESPONSE: The government requires the option to purchase the equipment. The equipment will need to demonstrate the capacity to operate at least 2 cubic yards per hour for the duration of the tests. The offeror can decide if the equipment will need to be upgraded to operate for the tests.
*** END OF NARRATIVE A0004 ***
2 2
W52P1J-15-R-0077 0004
SECTION A
File details come from the government source that posted it. Updated .