W52P1J15R0077-0002.pdf

PDF 15 KB Posted

Attached to
REMEDIATION OF CHEMICAL AGENT-CONTAMINATED SOILS AND DEBRIS
Solicitation number
W52P1J15R0077
Issued by

About this file

The purpose of this amendment is to answer questions.

View the file

Other files

File Type Posted
W52P1J15R0077-0004.pdf PDF
ATT0001v3.pdf PDF
W52P1J15R0077-0003.pdf PDF
ATT0003.pdf PDF
ATT0002.pdf PDF
ATT0004.pdf PDF
ATT0005.xlsx XLSX spreadsheet
ATT0001v2.pdf PDF
W52P1J_15_R_0077_0001.pdf PDF
ATT0001v2.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Cost Plus Fixed Fee

0002 2015SEP21

W52P1J

ARMY CONTRACTING COMMAND - RI

ROCK ISLAND, IL 61299-8000

BLDGS 60 & 62

BRIAN J. EGLI

EMAIL: BRIAN.J.EGLI.CIV@MAIL.MIL

W52P1J-15-R-0077

2015SEP01

X

X

/SIGNED/

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 3

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: BRIAN J. EGLI

Buyer Office Symbol/Telephone Number: CCRC-DB/(309)782-3941

Type of Contract 1: Cost Plus Fixed Fee

Type of Contract 2: Firm Fixed Price

Kind of Contract: Service Contracts

*** End of Narrative A0000 ***

The purpose of this amendment is to answer questions that have been asked about the solicitation.

1. Can you please provide the number and geographic distribution of sites potentially requiring remediation?

RESPONSE: The technology is being selected based upon its capability to remediate soils from any future burial site. There are burial sites throughout the US. The major burial sites are at Anniston, Alabama and Stockton, Utah.

2. Can you please provide the estimated quantities of impacted soils at each site, as well as a maximum and minimum concentrations of contaminants at each site?

RESPONSE: The technology will need to process soils at the rate of 2 cubic yards per hour. This RFP is to develop and perform tests to demonstrate the thermal desorption technology and not to remediate the soils at a site. The minimum level is undetectable contamination.

The maximum concentrations are anticipated to occur when the excavations begin.

3. Are there other soil contaminants that are amenable to thermal desorption at the project locations that would be required to meet Federal, State, or Local soil cleanup objectives?

RESPONSE: This RFP will only test remediation of mustard agent simulant.

4. Are there other soil contaminants that would need to be controlled within the thermal desorption unit's air pollution control equipment that are not associated with agent mustard?

RESPONSE: This RFP will only test remediation of mustard agent simulant.

5. Can the unit used for the tests exceed the 2 CY/hour capacity?

RESPONSE: Yes, 2 CY/Hr is the minimum capacity.

6. Should the demonstration test confirm that thermal desorption is the preferred technology for the remediation of soil(s) contaminated with agent mustard, will the U.S. Army require the thermal desorption unit to process a soil volume per hour greater than that of the demonstration test (greater than 2-cubic yards per hour)?

RESPONSE: The requirement is to process 2 Cubic yards per hour. There is no requirement to process at a rate greater than 2 Cubic yards per hour.

7. Can the testing unit be an existing TSDF facility that meets the same permitting/treatability specifications as outlined in the

RFP, or does the test need to be conducted in a mobile unit at a standalone site?

RESPONSE: The testing can be at any location selected by the offeror to include a TSDF facility. The equipment performing the tests must be mobile and transportable per the PWS. The tests do not have to be performed at a remote site.

8. If the test should be conducted with a mobile unit, does the testing need to be completed at an Army facility, and if so, can you please provide the location?

RESPONSE: The testing can be at any location selected by the vendor. There is no requirement to perform the testing at an Army Facility.

9. Is the lease/purchase option discussed in the PWS for the test equipment of equipment for full scale operations?

RESPONSE: For the test equipment. The 2 Cubic yards per hour is the full scale production capacity

10. Section 3.1.2.1 of the PWS discusses a 99.99% effective removal efficiency (RE) of the simulant by the system. Is the RE referenced directly related to the soil contaminant and meeting the 0.010 mg/kg health based standards or was the statement to include all effluent streams from the thermal treatment system?

RESPONSE: The 99.99% RE and the .010 mg/kg are for the mustard simulant. For these tests, only the mustard simulant will be evaluated.

11. In developing a design for a thermal desorption unit capable of completing the work required in the PWS, it would be appropriate to understand if any utilities (water, electricity, fuel) are available at the various locations where soil remediation is to occur. Is there a list of available utilities at the project locations?

RESPONSE: The testing can be at any location selected by the vendor. The concept is to have a mobile self-contained unit that be deployed to remote locations to remediate agent contaminated soils. Therefore, the PWS requires that the technology demonstrate that it is mobile and transportable.

2 3

W52P1J-15-R-0077 0002

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

12. Section 3.3.1.2 of the PWS states that the offeror must dispose of the processed soils. If the offeror had the ability to utilize the processed soil in a permitted beneficial manner would such a utilization be acceptable to the U.S. Army?

RESPONSE: Yes. The requirement is that the disposition of the soils will be the responsibility of the offeror.

13. Does the thermal desorption unit utilized during the demonstration test have to be the same unit utilized during full scale operations?

RESPONSE: The test and design capacity are 2 cubic yards per hour.

*** END OF NARRATIVE A0002 ***

3 3