W51DQV25RA004 0002.pdf
PDF 2 MB Posted
- Attached to
- CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION
- Solicitation number
- W51DQV25RA004
- Issued by
-
Department of the Army
About this file
This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for the Caño Martin Peña Ecosystem Restoration Project (CMP-ERP) Contract 3 Phase 1, located in San Juan, Puerto Rico. The amendment, dated 07-May-2025, incorporates aerial images taken in September 2023 to provide contractors with a basic understanding of the project site. The images are explicitly not meant to substitute for an actual site visit, and contractors remain obligated to inspect the site per FAR 52.236-3.
The attached aerial images document the project area from multiple perspectives, including views from the Barbosa Bridge, moving east towards San Jose Lagoon, and the Material Management Area at Ciudad Deportiva Roberto Clemente. The images showcase the geographical layout, including urban and natural landscapes, waterways, bridges, and the proposed work zones. The point of contact for the contract is Samuela Y. Adams at samuela.y.adams@usace.army.mil, and the contract number is W51DQV25R0006.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pre Proposal Conference Slides.pdf | ||
| Site Visit Attendance List_5-15-2025.pdf | ||
| W51DQV25RA004 0003.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PROJECT TITLE: CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND
STABILIZATION, SAN JUAN, PUERTO RICO.
THE PURPOSE OF THIS AMENDMENT IS TO INCORPORATE AND PROVIDE THE AERIAL IMAGES TO THE PUBLIC TO PROVIDE A BASIC UNDERSTANDING OF THE SITE AND ARE NOT MEANT TO REFLECT THE SITE IN ITS EXACT CURRENT CONDITION. THE IMAGES ARE NOT TO SUBSTITUTE FOR THE SITE VISIT AND DO NOT RELIEVE THE CONTRACTOR OF ITS DUTY TO INSPECT THE SITE PURSUANT TO FAR
52.236-3, SITE VISIT INVESTGATION AND CONDITIONS AFFECTING THE WORK.
ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED
POC FOR CT: SAMUELA Y. ADAMS AT SAMUELA.Y.ADAMS@USACE.ARMY.MIL
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-May-2025
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W51DQV25R0006
X 9B. DATED (SEE ITEM 11)
08-Apr-2025
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-May-2025
CODE
TF VIPR
383 FRANKLIN D ROOSEVELT AVENUE
SAN JUAN PR 00918
W51DQV 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W51DQV25R0006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 00 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
The following have been added by full text:
AMD 0002
See attached images
(End of Summary of Changes)
CAÑO MARTIN PEÑA
ECOSYSTEM RESTORATION PROJECT
CONTRACT 3 PHASE 1
AERIAL IMAGES DISCLAIMER
Images in this document are from September 2023. Intending to provide a basic understanding of the site and are not meant to reflect the site in its exact condition today. To that end, the images are not a substitute for the site visit and do not relieve the contractor of its duty to inspect the site pursuant to FAR 52.236-3, Site
Investigation and Conditions Affecting the Work.
2CNT 3 PHASE 1
(FULL AREA LOOKING WEST)
N S N S N S
N S
S N September 2023
BARBOSA BRIDGE
N S N S
N S
N S
S N
Approximated western end of CNT 3 Phase 1
September 2023
File Name
FROM BARBOSA BRIDGE, MOVING EAST
TOWARDS SAN JOSE LAGOON
N S N S
N S N S
N S N S
September 2023 September 2023
September 2023 September 2023
File Name
N S N S N S
N S
N S
N S
N S N S
MOVING EAST TOWARDS SAN JOSE LAGOON
September 2023
September 2023
N S N S N S
N S
N S
SAN JOSE LAGOON END
Moscoso bridge
N S N S N S
N S
MATERIAL MANAGEMENT AREA (MMA)
CIUDAD DEPORTIVA ROBERTO CLEMENTE
| CMP_Aerial images SEP2023.pdf |
| Caño Martin Peña Overview |
| Slide 1: Caño Martin Peña ECOSYSTEM RESTORATION PROJECT Contract 3 PHASE 1 |
| Slide 2: CNT 3 PHASE 1 (FULL AREA looking west) |
| Slide 3: BARBOSA BRIDGE |
| Slide 4: From Barbosa Bridge, moving east towards San Jose Lagoon |
| Slide 5 |
| Slide 6 |
| Slide 7 |
File details come from the government source that posted it. Updated .