Site Visit Attendance List_5-15-2025.pdf
PDF 3 MB Posted
- Attached to
- CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION
- Solicitation number
- W51DQV25RA004
- Issued by
-
Department of the Army
About this file
The document is a site visit attendance list for the Cano Martin Pena Ecosystem Restoration Project (CMP-ERP) Contract 3 Phase 1. The list contains three pages of signatures from representatives of various firms, including NOVEL Construction, Cashman Dredging, Beltago LLC, Great Lakes Dredging & Dock, Furcivil Construction PR, Nucleo Skyline, and multiple other small to large-sized companies. Each entry includes the firm name, participant's name, phone number, email address, and a signature, indicating these organizations attended a site visit related to the federal contract opportunity for ecosystem restoration and construction work in Puerto Rico.
The attendance list suggests significant industry interest in this Department of the Army solicitation (W51DQV25RA004), which involves complex site development activities including dredging, debris removal, sheet pile installation, and bridge protection measures. The project scope encompasses multiple specific locations such as Ciudad Deportiva Roberto Clemente Material Management Area, San Jose Lagoon, and various aquatic disposal areas, with technical requirements including channel dredging, bridge fender installation, and riprap channel construction to protect infrastructure and reestablish water flow.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pre Proposal Conference Slides.pdf | ||
| W51DQV25RA004 0003.pdf | ||
| W51DQV25RA004 0002.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .