Site Visit Attendance List_5-15-2025.pdf

PDF 3 MB Posted

Attached to
CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION
Solicitation number
W51DQV25RA004
Issued by

About this file

The document is a site visit attendance list for the Cano Martin Pena Ecosystem Restoration Project (CMP-ERP) Contract 3 Phase 1. The list contains three pages of signatures from representatives of various firms, including NOVEL Construction, Cashman Dredging, Beltago LLC, Great Lakes Dredging & Dock, Furcivil Construction PR, Nucleo Skyline, and multiple other small to large-sized companies. Each entry includes the firm name, participant's name, phone number, email address, and a signature, indicating these organizations attended a site visit related to the federal contract opportunity for ecosystem restoration and construction work in Puerto Rico.

The attendance list suggests significant industry interest in this Department of the Army solicitation (W51DQV25RA004), which involves complex site development activities including dredging, debris removal, sheet pile installation, and bridge protection measures. The project scope encompasses multiple specific locations such as Ciudad Deportiva Roberto Clemente Material Management Area, San Jose Lagoon, and various aquatic disposal areas, with technical requirements including channel dredging, bridge fender installation, and riprap channel construction to protect infrastructure and reestablish water flow.

View the file

Other files

File Type Posted
Pre Proposal Conference Slides.pdf PDF
W51DQV25RA004 0003.pdf PDF
W51DQV25RA004 0002.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .