This document is a Questions and Answers (Q&A) file for a federal contract solicitation related to water softener installations. The Q&A addresses three key topics: (1) valve material specifications, confirming that alternative materials like fiber reinforced polymer or stainless steel are acceptable for the 1" multiport valve, (2) detailed salt usage estimates for multiple buildings and bays, totaling 72 bags per month across various locations including wash bays, water jets, and paint booths, and (3) a modification to the Performance Work Statement (PWS) regarding 648C Security Background Checks, which will now be required within 7 days of award instead of at proposal submission. The Q&A references specific sections of the PWS (sections 1.3, 5.1, and 1.5.6) to provide context for the clarifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers

1. In the solicitation it outlines the need for the new softeners to be installed with a “brass 1” multiport valve, without hard water bypass piston.” Would you accept a comparable valve made of materials other than brass?

A comparable valve made from materials other than brass (i.e. fiber reinforced polymer or stainless steel) will be acceptable. (See PWS section 1.3 and 5.1)

2. Can you provide me with the salt usages for the softeners on-site?

Estimates for salt usage are 72 bags per month broken down as follows:

Building 1C Bay 2 (Flow Water Jet) 8 Bags per month.

Building 1C Bay 2 (OMax Water Jet) 8 Bags per month.

Building 1C Bay 4 (Wash Bay 1) 4 Bags per month.

Building 1C Bay 4 (Wash Bay 2) 4 Bags per month.

Building 1E (Wash Bay) 6 Bags per month.

Building 3 Bay 4. 2 Bags per month.

Building 9 (Paint Booth A-D) 4 Bags per month Building 9 (Paint Booth A-D) 4 Bags per month Building 10C (WashBay) 4 Bags per month Building 15 (Wash Bay) 4 Bags per month

Building 30 (Wash Bay 1) 6 Bags per month Building 30 (Wash Bay 2) 6 Bags per month Building 30 (Paint Booth 224) 6 Bags per month Building 30 (Paint Booth 230) 6 Bags per month

3. Can you please provide me with documentation to begin the 648C Security Background Checks? It says in the PWS that our personnel must have these on file at time of proposal submission.

We are going to make a change to the PWS. This paperwork will be required within 7 days of award by the successful offeror. It will not need to be submitted with offers. (See PWS Section 1.5.6)