Attachment 0003 - 2026-1694 - SOW Rev1 - Appendix B - Drawings.pdf
PDF 3 MB Posted
- Attached to
- Building 138 Repair/Repurpose
- Solicitation number
- W519TC-26-R-A032
About this file
This is a Statement of Work (SOW) appendix containing architectural and engineering drawings for Building 138 IGSA Repair at Rock Island Arsenal, located in Rock Island, Illinois. The project is designated as PR No. 2026-1694 for Fiscal Year 2026, with an issue date of April 30, 2026, and includes Addendum No. 1 dated June 30, 2026.
The work scope encompasses comprehensive renovation of Building 138, including demolition of existing infrastructure (railroad tracks, concrete floor, office walls, and wood doors), masonry repairs (repointing approximately 250 square feet of brickwork and rebuilding approximately 300 linear feet of brick cornice), and new construction elements. Key construction requirements include installation of a new 7-inch thick, 4,500 PSI concrete floor with heavy-duty wear-resistant broom finish; a new overhead coiling door with microwave motion sensor and dual control pedestals; a 6-foot wide sidewalk with proper drainage; two exhaust fans (Cook model 36EW416D08) with plenums; and a dry sprinkler system with nitrogen generator designed by a certified fire protection engineer in accordance with NFPA standards. The electrical scope involves replacing the existing distribution panel with a new 18-breaker, 200-amp panel at 208V and installing ten new duplex power outlets. The contractor is responsible for coordinating utility locates, site access, staging areas, waste disposal, and all work execution in accordance with applicable codes and UFC standards. Normal installation hours are 0700-1700 Monday through Friday, with coordination required for extended hours. The facility operates on government holidays as determined by the Contracting Officer's Representative.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G-001
C O
VE
R
S H
EE
T
FY: 2026
PR NO: 2026-1694
D
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
-1
4/
/2
D
ES
IG
N
ED
B Y:
E.
M
AG
N
U
SO
N D
R
AW
N B
Y:
E.
M
AG
N U
SO
N
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
IN
G
R
IA
B U
IL
D
IN
G
IG
SA
R
EP
AI
R
A
C
E
G
J
L
N
C H
EC
KE
D B
Y:
C
SB
3 5 7 9 11 13 15 17 192 4 6 8 10 12 14 16 18 20
B
D
F
H
K
M
P
1 3 5 7 9 11 13 15 17 192 4 6 8 10 12 14 16 18 20
ROCK ISLAND ARSENAL
BUILDING 138
IGSA REPAIR
SOW - APPENDIX B
ADDENDUM No. 1 1
AD
D
EN
D U
M N o.
AD
D
EN
D U
M N o.
6/
/2
C
SB
AutoCAD SHX Text U
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text M
AutoCAD SHX Text Y
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text K
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text G
AutoCAD SHX Text L
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text B
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text L
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text U
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text M
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text C
AutoCAD SHX Text K
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text D
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
1" = 800'
ISLAND MAP
TR
U
E N
PLAN
NORTH
A7
PROJECT SITE
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PA
R
KI
N
G
PA
R
KI
N
GPARKING PA
R
KI
N
G
PARKING
PARKING
PA
RK
IN
G
PARKING
PARKING
PARKING
PARKING
PA
R
KI
N
G
PARKING
PARKING
PARKING 234
13A
7-G
108 150
362363
T186
9B
SUBSB
SUBSC
246CPY
81320
SWITA
215B
92G1
92G2
93G2 93G1
47C
24B
47B
47CPY
22 30
30-G
15P
11P
14A
68SN
150P
70-G
686661
2-G
4-G 3-G
6-G
68GN
312FL
20FL
52A
81-G
333 129
SHED
TOWER
(MEC)
2442 2464
2406 2428 2450
2425 2447
2504 2530 2548 2566
26282490
26422527
2543 2571
2611 2635
320SN
275SN
TOWER
(MEC)
TOWER
(MEC)
TOWER
(MEC)
48SN
SOUTH
W
ES
T D
R
IV
E
FR
EE
DOM
D R
IV
E
BECK AVENUE
KINGSBURY AVE
DRIVE
NORTH
ST
R
EE
T
BENET AVENUE
AVENUE
CHESTNUT AVENUE
ST
R
EE
T
G O
LF
SE
C
O N
D
TH
IR
D
WITEK ROAD
FO
RT ARM
STRO
NG
AVE.
RODMAN
AVENUE
NORTH AVENUE
EAST
NORTH AVENUE
R O
C K
IS
LA
N D
AVENUE
RODMAN
DAVENPORT
DRIVE
G
IL
LE
SP
IE
DRIVE
KING
SOUTH
AVENUE
EA
ST
DRIVE
BECK
SYLVAN
DRIVE
AVENUE
DRIVE
BLUNT
ROAD
DYKE ROAD
RODMAN
ROAD
RANGE
PRACTICE
S Y
L V
A N
D R
I V
E
TANK TRACK
GOLF
CEMETERY
NATIONAL
NORTH AVENUE
NORTH AVENUE
NORTH AVENUE
DYK
E
ROAD
S Y
L V
A N
D R
I V
E
H
IL
LM
AN
S T.
R.
I.
VI
AD
UC
T
C
IR
C
LE
DAVENPORT
C
IR
C
LE
LANE
BUTLER
LANE
FARLEY
WILLIE
LA
NE
LANE
SYLVAN
ISLAND
LOCK AND DAM
NO. 15
BETTENDORFDAVENPORT
MOLINEROCK ISLAND
E. RIVER DR.
GRANT ST.
4TH AVE
1ST AVE
4TH ST.
STATE ST.
DURNIN AVENUE
W H
IT
TE
M O
R E
ST
EA
ST
D R
IV
E
NORTH
DRIVE
PROSPECT
CIRCLE
PROSPECT
COURT
ROSTRUM D
RIVE
DR
IV
E
CEMETERY
MOLINE BRIDGE
G O
ET
SC
H
D
IV
E
DRIVE
CEMETERY
POST
KI
N
G D
R
IV
E
PROSPECT
DRIVE
KING
CHAMBERLAIN DRIVE
WALKER DRIVE
CONFEDERATE
CEMETERY
DURNIN
AVENUE
BAKER
AVENUE
H O
W
AR
D S
T.
AMERICAN
DISCOVERY
TRAIL
FO
RT
A
RM
ST
RO
NG
A
VE
BECK AVENUE
H O
BB
S
ST
ST
R
EE
T
ST
R
EE
T
STR
EET EAST
ST
R
EE
T
W
ES
T PERSHING
PE
RS
HI
NG
AVENUE
RODMAN
FIELD
MEMORIAL
MEMORIAL
PARK
RAMSEY ROAD
TERRACE
LA
N
E
MOSKALA
CEMETERY
NATIONAL
2ND ST.
3RD ST.
ST
R
EE
T
KINGSBURY
FL
AG
LE
R
AVE
RIA
FITNESS
TRAIL
BAUMBECK AVENUE
H
IL
LM
AN
S T.
RODMAN AVE
301FL
311SN
301301-G
BLUNT
Pr op os ed
G en er at or
R el oc at io n
Proposed Switches
15-L1
BM 100
7L
RI Astronomical Stone - Pool 15
BM 102
Arsenal Bridge
BM 103
TBM 104
TBM 105
TBM 106
TBM 107
TBM 108
TBM 109
TBM 110
BM 111
09-77-15 Eisenbraun Point
PID BBBR62
L2
L4
R.I.A.
MOLINE POOL RESET
(OCT. 2001)
Elev. 574.1
ADDITION TO
2ND
CEMETERY
NATIONAL
ADDITION TO
1ST
ROCK ISLAND
M I S S I S S I P P I R I V E R
SE
C
O N
S
TR
EE
T
TH
IR
EE
T
117152
RIAPRIMITIVE
CAMPING
TANK TRACK
SY
LV
AN
IV
E
ACP SHELTER
BU
FF
IN
G
TO
N
S T.
BASE MAP REVISED MAR. 2023
P.O.B.
355356
346FL
2315 2337
2320 2340
2318 2342 2362 2384
2357 2381 2403
BM 101
2400.00
G-002
LO
C
AT
IO
N M
AP
IN
D
EX
O F
D R
AW
IN
G S
D
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
-1
4/
/2
D
ES
IG
N
ED
B Y:
E.
M
AG
N
U
SO
N D
R
AW
N B
Y:
E.
M
AG
N U
SO
N
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
B U
IL
D
IN
G
IG
SA
R
EP
AI
R
A
C
E
G
J
L
N
C H
EC
KE
D B
Y:
C
SB
3 5 7 9 11 13 15 17 192 4 6 8 10 12 14 16 18 20
B
D
F
H
K
M
P
1 3 5 7 9 11 13 15 17 192 4 6 8 10 12 14 16 18 20
NOT TO SCALE (NTS)
VICINITY MAPJ13
SHEET ID. SHEET TITLE
G-001 COVER SHEET
GENERAL
G-002 LOCATION MAP & INDEX OF DRAWINGS
G-003
ARCHITECTURAL
ABBREVIATIONS & GENERAL NOTES
A-101
DETAILS, ELEVATIONS, SCHEDULESA-501
SHEET INDEX
DIMENSION AND DEMOLITION PLANS
MECHANICAL, ELECTRICAL, AND PLUMBING
MEP PLANS AND DETAILSMEP-101
SOW Appendix B
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
U.S. GOVERNMENT BRIDGE
AutoCAD SHX Text C A N A L
AutoCAD SHX Text P O O L
AutoCAD SHX Text S Y L V A N
AutoCAD SHX Text S L O U G H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text X
AutoCAD SHX Text M O L I N E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
IOWA
AutoCAD SHX Text
ILLINOIS
AutoCAD SHX Text
MISSOURI
AutoCAD SHX Text
INDIANA
AutoCAD SHX Text
DAVENPORT
AutoCAD SHX Text
MOLINE
AutoCAD SHX Text
CHICAGO
AutoCAD SHX Text
ST. LOUIS
AutoCAD SHX Text
ROCK ISLAND
AutoCAD SHX Text
WISCONSIN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MILES
AutoCAD SHX Text
KENTUCKY
AutoCAD SHX Text
ROCK ISLAND
AutoCAD SHX Text
ARSENAL
AutoCAD SHX Text
AutoCAD SHX Text
BETTENDORF
G-003
AB
BR
EV
IA
TI
O
N S
G
EN
ER
AL
N O
TE
S
D
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
-1
4/
/2
D
ES
IG
N
ED
B Y:
E.
M
AG
N
U
SO
N D
R
AW
N B
Y:
E.
M
AG
N U
SO
N
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
B U
IL
D
IN
G
IG
SA
R
EP
AI
R
A
C
E
G
J
L
N
C H
EC
KE
D B
Y:
C
SB
3 5 7 9 11 13 15 17 192 4 6 8 10 12 14 16 18 20
B
D
F
H
K
M
P
1 3 5 7 9 11 13 15 17 192 4 6 8 10 12 14 16 18 20
A-000
XX
SECTION MARK
A-000
BUILDING ELEVATION MARK
ELEVATION
NUMBER
(TYP.)
INTERIOR ELEVATION MARK
DWG. NO. WHERE
DETAIL IS DRAWN
CALLOUT HEAD
DETAIL
NUMBER
(TYP.)
AREA COVERED BY DETAIL
WINDOW TAG
PARTITION TYPE KEYNOTE
TAG
DOOR TAG
0'-0" A.F.F.X
CEILING TAG
(TYPE & HEIGHT)
CEILING HEIGHT
CEILING TYPE
DETAIL IDENTIFIER
(MODULE LETTER AND NUMBER)
NORTH ARROW
PLAN, ELEVATION, SECTION, OR DETAIL VIEW TITLE
PLAN SYMBOLSREFERENCE SYMBOLS
WALL/PARTITION
TYPE
ARCHITECTURAL ABBREVIATIONS GENERAL NOTES
1. NOTES FOUND ON G-SHEETS, ARE GENERAL NOTES AND APPLY TO THE ENTIRE PROJECT TO INCLUDE THE COMPLETE PLAN SET AND
SPECIFICATIONS, UNLESS NOTED OTHERWISE. SHEET NOTES APPLY TO ALL PLANS, ELEVATIONS, SECTIONS, AND DETAILS FOR THAT SHEET, UNLESS NOTED OTHERWISE. KEYNOTES APPLY TO ELEMENTS ON THE SHEET AS INDICATED, UNLESS NOTED OTHERWISE.
2. THE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK. THE DRAWINGS ARE NOT INTENDED TO INDICATE OR DESCRIBE ALL WORK REQUIRED FOR THE FULL PERFORMANCE AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT DOCUMENTS.
3. THE ENUMERATION OF PARTICULAR ITEMS OF WORK IN ONE PORTION OF THE CONTRACT DOCUMENTS SHALL NOT BE CONSTRUED TO
EXCLUDE OTHER ITEMS NECESSARY OR IMPLIED THEREFROM.
4. THE CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF ALL PARTS OF THE WORK SO THAT NO WORK SHALL BE LEFT IN AN UNFINISHED OR INCOMPLETE CONDITION. THE CONTRACTOR SHALL PROVIDE A COMPLETE AND USABLE PRODUCT.
5. THE CONTRACTOR SHALL PROTECT ANY EXISTING, IN-PLACE, AND/OR NEW WORK.
6. ALL WORK NOTED "N.I.C." IS NOT MEANT TO BE PART OF THE CONSTRUCTION SCOPE OF WORK AGREEMENT.
7. THE CONTRACTOR SHALL PAY FOR AND COORDINATE THE REMOVAL AND LEGAL DISPOSAL OF MATERIALS AND RUBBISH.
8. THE CONTRACTOR SHALL CONDUCT SITE UTILITY LOCATES TO DETERMINE ANY CONFLICTS BETWEEN NEW WORK AND EXISTING UTILITIES.
RESOLUTION OF CONFLICTS WITH EXISTING UTILITIES IS INCLUDED IN THE CONTRACTOR'S SCOPE OF WORK.
9. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS. DIMENSIONS AND PLANS ARE NOT WARRANTED AS ACCURATE. VERIFY EXISTING
CONDITIONS THAT MAY AFFECT THE WORK PRIOR TO BID.
10. DO NOT SCALE DRAWINGS; LARGE SCALE DETAILS GOVERN OVER SMALL SCALE DETAILS.
11. NFPA 241, STANDARD FOR SAFEGUARDING CONSTRUCTION, AND ALTERATION OPERATIONS SHALL BE APPLIED.
12. PROVIDE THE MINIMUM EXPANSION, CONTRACTION, AND CONTROL JOINTS IN ALL WORK PER THE PRODUCT MANUFACTURER'S STANDARDS
OR THE APPLICABLE INDUSTRY STANDARDS.
13. ALL DISSIMILAR METALS SHALL BE ISOLATED FROM EACH OTHER TO AVOID GALVANIC CORROSION.
14. EXISTING PAINT SHALL BE PRESUMED TO BE LEAD BASED
15. EXISTING PIPE INSULATION SHALL BE PRESUMED TO BE ASBESTOS CONTAINING
16. EXISTING WINDOW GLAZING SHALL BE PRESUMED TO BE ASBESTOS CONATINING
17. DO NOT CUT INTO, REMOVE, OR ALTER ANY STRUCTURAL MEMBER OR FLOOR SYSTEM UNLESS IT IS SPECIFICALLY NOTED OR SHOWN ON
DRAWINGS.
18. THE CONTRACTOR SHALL PLAN THEIR WORK TO PROVIDE ADEQUATE PROTECTION FOR PERSONS AND PROPERTY AT ALL TIMES, AND EXECUTE THE WORK IN SUCH A MANNER TO AVOID ANY HAZARD TO PERSONS AND PROPERTY AS NECESSARY.
19. ALL PRODUCTS LISTED ON DRAWINGS AND NOT INDICATED IN SPECIFICATIONS SHALL BE SUBMITTED FOR GOVERNMENT APPROVAL.
CONTRACTOR SHALL ADD THESE TO THEIR SUBMITTAL REGISTER.
20. DEMOLITION OR NEW WORK MAY NOT BE SOLELY INDICATED ON THEIR CORRESPONDING SHEETS.
21. CONTRACTOR SHALL REQUEST PARKING, JOB TRAILER, STAGING AND OTHER NECESSARY SPACES.
22. DISPOSE OF DEMOLISHED AND WASTE MATERIALS OFF SITE UNLESS OTHERWISE NOTED.
23. TO PERFORM THE WORK AS AWARDED BY THE BASE BID, OPTION, OR CONTRACT MODIFICATION, THE CONTRACTOR SHALL EITHER PROTECT OR RELOCATE ADJACENT ITEMS, EQUIPMENT, AND STRUCTURES AS NECESSARY TO FACILITATE THE WORK.
24. IN ORDER TO MORE CLEARLY DEPICT WORK BEING IDENTIFIED ON A DRAWING, ITEMS NOTED AS BEING INCLUDED IN THE WORK ARE GENERALLY SHOWN IN HEAVY (BOLD) LINE WEIGHT AND BLACK LINE WORK. GRAY SCALE LINE WORK DENOTES EXISTING CONDITIONS. NOTE:
THERE ARE EXCEPTIONS TO THIS RULE AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO THOROUGHLY REVIEW DRAWINGS AND REQUEST
ADDITIONAL INFORMATION PRIOR TO BIDDING.
25. NORMAL INSTALLATION WORKING HOURS WILL BE BETWEEN 0700-1700, MONDAY THROUGH FRIDAY. HOURS OUTSIDE THE NORMAL RANGE REQUIRES COORDINATION AND APPROVAL FROM THE CONTRACTING OFFICER'S REPRESENTATIVE (C.O.R.) TWO WEEKS PRIOR. THE FACILITY WILL BE CLOSED ON GOVERNMENT HOLIDAYS. CONTACT THE C.O.R. FOR A LIST OF GOVERNMENT HOLIDAYS.
26. THE CONTRACTOR SHALL MAKE REQUESTS TO DISCONNECT POWER OR UTILITIES PER SPECIFICATIONS. ALL WORK REQUIRING POWER REMOVAL SHALL BE DONE IN A TIMELY MANNER AND OUTSIDE NORMAL INSTALLATION WORKING HOURS WHEN POSSIBLE. IF SAFE WORKING CONDITIONS EXIST FOR BOTH THE CONTRACTOR AND BUILDING OCCUPANTS, THEN POWER SHALL BE RESTORED FOR BUILDING OCCUPANTS DURING NORMAL WORKING HOURS. THE CONTRACTOR SHALL IMMEDIATELY RESTORE POWER ONCE WORK IS COMPLETE AND SAFE
CONDITIONS EXIST.
27. THE CONTRACTOR SHALL OBTAIN NECESSARY BUILDING AND FIRE PERMITS FROM THE INSTALLATION AUTHORITIES HAVING JURISDICTION.
28. THE CONTRACTOR SHALL COMPLY WITH USAG-RI POLICIES AND PROCEDURES.
29. THE CONTRACTOR SHALL PERFORM WORK IN ACCORDANCE WITH APPLICABLE CODES, ORDINANCES, AND REGULATORY AGENCIES.
30. NOTES APPEAR ON VARIOUS SHEETS FOR DIFFERENT SYSTEMS AND MATERIALS. SHEETS ARE TO BE REVIEWED AND NOTES ON INDIVIDUAL
SHEETS SHALL BE APPLIED TO RELATED DRAWINGS AND DETAILS.
31. A FINISH INDICATION ON A WALL SHALL MEAN THE ENTIRE LENGTH AND HEIGHT OF WALL INDICATED.
32. PROVIDE ACCESS PANELS AS REQUIRED BY APPLICABLE CODES AND AS REQUIRED FOR MECHANICAL, ELECTRICAL AND PLUMBING WORK.
ALL ACCESS PANELS SHALL BE CONCEALED AND LOCATIONS SHALL BE REVIEWED WITH THE ARCHITECT PRIOR TO PROCEEDING.
33. ALL MECHANICAL, ELECTRICAL AND PLUMBING WORK THAT PENETRATES FLOORS, WALLS, OR ROOFING SHALL BE INSTALLED IN A MANNER THAT WILL PRESERVE THE MOISTURE RESISTIVENESS, FIRE RATING, AND STRUCTURAL INTEGRITY OF THE BUILDING.
34. ALL WORK SHALL BE DONE IN A WORKMAN LIKE MANNER. WORK SHALL CONFORM TO APPLICABLE INDUSTRY OR MANUFACTURER'S PUBLISHED STANDARDS FOR QUALITY OF MATERIALS AND WORKMANSHIP, AS WELL AS, ALL REQUIREMENTS IN THESE DRAWINGS AND SPECIFICATIONS. ANY CONFLICTING REQUIREMENTS OF THE SOURCES LISTED ABOVE SHALL BE BROUGHT TO THE ATTENTION OF THE C.O.R.
PRIOR TO PROCEEDING WITH THE WORK.
35. ANY ANCHORS USED TO ATTACH ITEMS TO THE EXTERIOR WALLS MUST BE EPOXY ANCHORS. EXPANSION ANCHORS ARE STRICTLY PROHIBITED. THE USE OF ROTARY IMPACT DRILLS IS NOT AUTHORIZED. TOOLS USED MUST NOT BE IMPACT TYPE.
36. THE CONTRACTOR SHALL COORDINATE SITE ACCESS, STAGING, AND LAYDOWN AREAS WITH THE C.O.R. PRIOR TO COMMENCEMENT OF
WORK.
37. DUMPSTERS MUST COMPLY WITH UFC 4-010-01 DoD MINIMUM ANTI-TERRORISM STANDARDS FOR BUILDINGS. DUMPSTERS CAN BE LOCATED ALONG THE BUILDING DURING WORKING HOURS UPON REQUEST. THE CONTRACTOR WILL MAKE REQUESTS IN WRITING TO THE C.O.R. AT LEAST TWO WEEKS PRIOR TO THE REQUIREMENT. DUMPSTERS WILL BE EMPTY EACH TIME THEY ARE PLACED NEAR BUILDINGS AT THE START OF THE WORKING DAY. DUMPSTERS WILL BE MOVED AWAY FROM THE BUILDING AT THE END OF EACH WORKING DAY. THE C.O.R. WILL
DETERMINED THE DUMPSTER STORAGE LOCATION AT THE END OF THE WORK DAY.
38. THE CONTRACTOR SHALL COORDINATE CRANE USAGE 2 WEEKS IN ADVANCE WITH THE C.O.R., SHALL PROTECT ASPHALT, AND DISTRIBUTE HEAVY POINT LOADS. IF THE CONTRACTOR DAMAGES THE ASPHALT REPAIRS WILL BE PERFORMED IN ACCORDANCE WITH UFC 3-270-01 ASPHALT MAINTENANCE AND REPAIR. DEPENDING UPON SEVERITY OF DAMAGE REPAIRS WILL BE IN ACCORDANCE WITH FULL DEPTH, PARTIAL
DEPTH, AND/OR PATCHING.
AFF ABOVE FINISHED FLOOR
ACC DR ACCESS DOOR / PANEL
ADAAG AMERICAN WITH DISABILITIES
ACCESSIBILITY GUIDELINES
ACCESS ACCESSORIES
ADJ ADJUST/ ADJUSTABLE
ACOUST. ACOUSTICAL
AB ANCHOR BOLT
ANOD ANODIZED
AC AIR CONDITIONING
AL / ALUM ALUMINUM
& AND
L ANGLE
APP APPROVED
APPROX APPROXIMATE
ARCH ARCHITECTURAL
@ AT
ATFP ANTI TERRORISM / FORCE PROTECTION
AVG AVERAGE
AWI ARCHITECTURAL WOODWORK INSTITUTE
BHMA BUILDER'S HARDWARE
MANUFACTURER'S ASSOCIATION, INC.
BM BEAM
BLKG BLOCKING
BD BOARD
BTM BOTTOM
BLDG BUILDING
B.O. BOTTOM OF
CFCI CONTRACTOR FURNISHED
CONTRACTOR INSTALLED
CH CHANNEL
CPT CARPET
CLG CEILING
CLG HT CEILING HEIGHT
CTR CENTER
℄ CENTER LINE
C TO C CENTER TO CENTER
CT CERAMIC TILE
CLR CLEAR
CO CLEANOUT
CLOS CLOSET
CO COMPANY
COL COLUMN
CONC CONCRETE
CORR CORRIDOR
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CMU CONCRETE MASONRY UNIT
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
CJ CONTROL JOINT
CY CUBIC YARD
DET DETAIL
DIA DIAMETER
DIM DIMENSION
DISP DISPENSER
DR DOOR
DN DOWN
DS DOWNSPOUT
DESC DESCRIPTION
DWG DRAWING
EA EACH
EF EXHAUST FAN
EL ELEVATION
ERD EMERGENCY ROOF DRAIN
EP EPOXY PAINT
ENGR ENGINEER
EQUIP EQUIPMENT
EQ EQUAL
EXIST EXISTING
EXP EXPANSION / EXPOSED
EJ (EXP JT) EXPANSION JOINT
EXP TO EXPOSED TO STRUCTURE
STRUCT
EXT EXTERIOR
ETD ESTIMATED TRAVEL DISTANCE
FAC FACTORY
FDC FIRE DEPARTMENT CONNECTION
FT FEET
FE FIRE EXTINGUISHER
FIN FINISH
FP FLAT PAINT
FF FINISHED FLOOR
FLR FLOOR
FD FLOOR DRAIN
FLUOR FLUORESCENT
FTG FOOTING
FDN FOUNDATION
FV FIELD VERIFY
GA GAGE OR GAUGE
GALV GALVANIZED
GBF GYPSUM BOARD FURRING
GFCI GOVERNMENT FURNISHED
CONTRACTOR INSTALLED
GFGI GOVERNMENT FURNISHED
GOVERNMENT INSTALLED
GP GLOSSY PAINT
GL GLASS
GOVT GOVERNMENT
GYP GYPSUM
GYP BD GYPSUM BOARD
(GWB)
HKS HOOKS
HR HANDRAIL
HDW HARDWARE
HT HEIGHT
H HIGH
HP HIGH POINT
HM HOLLOW METAL
HORIZ HORIZONTAL
HB HOSE BIBB
HVAC HEATING VENTILATION & AIR
CONDITIONING
IBC INTERNATIONAL BUILDING
CODE
ID INSIDE DIAMETER
IN INCH
INSUL INSULATION
INT INTERIOR
IRC INTERNATIONAL RESIDENTIAL
CODE
JT JOINT
JST JOIST
KP KICK PLATE
LAM LAMINATE
LDG LANDING
LAV LAVATORY
LH LEFT HAND
LHR LEFT HAND REVERSE
LT LIGHT
LTG LIGHTING
LONG LONGITUDINAL
LVR LOUVER
LP LOW POINT
MAS MASONRY
MO MASONRY OPENING
MGR MANAGER
MFR MANUFACTURER
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MTL METAL
MWP METAL WALL PANEL
MIN MINIMUM
MISC MISCELLANEOUS
N.I.C. NOT IN CONTRACT
No. (#) NUMBER
NTS NOT TO SCALE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
OC ON CENTER
OFCI OWNER FURNISHED
CONTRACTOR INSTALLED
OFGI OWNER FURNISHED
GOVERNMENT INSTALLED
OH OPPOSITE HAND
OPNG OPENING
OW OPEN WEB
OPP OPPOSITE
OD OUTSIDE DIAMETER
OSHA OCCUPATIONAL SAFETY AND
HEALTH ACT
OVHD OVERHEAD
PDU POWER DISTRIBUTION UNIT
PT PAINT OR PRESSURE TREATED
PR PAIR
PNL PANEL
PART PARTITION
PLAS PLASTER OR PLASTIC
PL PLATE
PLYWD PLYWOOD
LBS OR # POUNDS
PSF POUNDS / SQUARE FOOT
PSI POUNDS / SQUARE INCH
PMJF PRE-MOLDED JOINT FILLER
PRE-FAB PREFABRICATED
QT QUARRY TILE
REF REFERENCE
REINF REINFORCEMENT
REQ'D REQUIRED
REV REVISIONS / REVISED
RD ROOF DRAIN
RDO ROOF DRAIN OVERFLOW
RHR RIGHT HAND REVERSE
RM ROOM
RO ROUGH OPENING
RB RUBBER BASE
SC SEALED CONCRETE
SCW SOLID CORE WOOD
SCHED SCHEDULE
SECT SECTION
SGP SEMI-GLOSS PAINT
SHT MET SHEET METAL
SHGC SOLAR HEAT GAIN COEFFICIENT
SIM SIMILAR
STC SOUND TRANSMISSION CLASS
SPEC(S) SPECIFICATION
SFRM SPRAYED FIRE RESISTIVE MATERIAL
SQ SQUARE
ST STORM
SS STAINLESS STEEL
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
TIOL / TLT TOILET
TEL TELEPHONE
THK THICK
T'HOLD THRESHOLD
TG TEMPERED GLASS
T.O. TOP OF
TOB TOP OF BEAM
TOC TOP OF CONCRETE
T/C TOP OF CURB
TOS TOP OF STEEL
T/W TOP OF WALL
TU TOUCH-UP
TYP. TYPICAL
UFC UNIFIED FACILITIES CRITERIA
UL UNDERWRITERS LABORATORIES
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
USAG-RI UNITED STATES ARMY GARRISON, ROCK
ISLAND
VERT VERTICAL
VEST VESTIBULE
VCT VINYL COMPOSITION TILE
VCB VINYL COVE BASE
VTR VENT THRU ROOF
W WIDTH
W/ WITH
WC WATER CLOSET
WCO WALL CLEAN OUT
WD WOOD
WNDO WINDOW
W/O WITHOUT
WRGB WATER RESISTANT GYPSUM BOARD
WS WEATHERSTRIPPING
WRO WINDOW ROUGH OPENING
YR YARD
VIEW TITLES
TRUE N
PLAN
NORTH
XXX
X
X# X-###
SCALE
VIEW TITLEA3
X#
X-###DWG. NO. WHERE
ELEVATION IS DRAWN
ELEVATION
NUMBER
DWG. NO. WHERE
ELEVATION IS DRAWN
DWG. NO. WHERE
SECTION IS DRAWN
SECTION
NUMBER
SOW Appendix B
OPEN
PARKING
OFFICE
'-8
230'-0"±
0D
OPEN
PARKING
A-501
D6
A-501 A3 A-501A18
M3 A-101
MIR.
2' -0
2' -0
G1
A-501
G1 A-501
SLOPE TO DRAIN
SL
O
PE
D
O W
N
TO
D R
AI
N
:9
SLOPE DOWN
TO DRAIN 1:96
230'-0"±
SLOPE DOWN
TO DRAIN 1:96
SL
O
PE
D
O W
N
TO
D R
AI
N
:9
SLOPE TO DRAIN
'-1
0"
EL. 100'-0"
T.O. DRAIN
EL. 99'-9"±
'-1
0"
J5 A-501
SL
O
PE
D
O W
N
TO
D R
AI
N
:9
SL
O
PE
D O
W N
TO
D
R
AI
N
:9
C J
EXISTING FLOOR
ELEV. AT PERIMETER
C J
C J
C J
C J C
J
C J C
J
C J
C J
C J
C
JC
J
C J
15'-0" 15'-0" SAME SPACING AS WEST SIDE
CJ
CJCJ
CJ
CJ
CENTER CJ ON
TRENCH DRAIN
CJ
C J
C J
CJ
C J
ALIGN CJ WITH END
OF TRENCH DRAIN
ALIGN CJ
WITH END
OF TRENCH
DRAIN
'-0
'-0
4'-0"AS REQ.
AS
R
EQ
6" SE
C
O
EE
T
ELECTRICAL
TRANSFORMER
LOCATION
100C100B
0A
M3 A-101
A-501
A6
100C
1' -4
ALIGN K1
A-501
1100C
114 FIRE HYDRANT
LOCATION
AP
PR
O
XI
M
AT
EL
Y
0'
F R
O M
H
YD
R
AN
T
TO
F
IR
E
PU
M P
R O
O M
SE
C
O
EE
T
D
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
-1
4/
/2
D
ES
IG
N
ED
B Y:
E.
M
AG
N
U
SO
N D
R
AW
N B
Y:
E.
M
AG
N U
SO
N
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
B U
IL
D
IN
G
IG
SA
R
EP
AI
R
A
C
E
G
J
L
N
C H
EC
KE
D B
Y:
C
SB
3 5 7 9 11 13 15 17 192 4 6 8 10 12 14 16 18 20
B
D
F
H
K
M
P
1 3 5 7 9 11 13 15 17 192 4 6 8 10 12 14 16 18 20
D
IM
EN
SI
O N
P
LA
N D
EM
O
LI
TI
O N
P
LA
N
A-1011/16" = 1'-0"
DEMO PLANA5
TR
U
E N
PLAN
NORTH
GENERAL DEMO NOTES
DEMO PLAN KEYNOTES
REMOVE AND DISPOSE OF EXISTING WOOD DOOR,
TRACK, AND ASSOCIATED HARDWARE
REMOVE AND DISPOSE OF RAILROAD TRACKS AND
CONCRETE FLOOR
A. PRIOR TO THE COMMENCEMENT OF WORK THE BUILDING
MUST BE CLEANED OF PIGEON DROPPINGS IN ORDER TO
FACILITATE A SAFE WORKING ENVIRONMENT
B. REMOVE MUD DAUBER NEST FROM THE EXTERIOR OF THE
BUILDING
C. METAL SHELVING UNITS LINING THE EXTERIOR WALLS
SHALL BE REMOVED AND STORED IN BUILDING 106, ROCK
ISLAND ARSENAL, AT A LOCATION DIRECTED BY THE COR
PRIOR TO THE COMMENCEMENT OF DEMOLITION. THREE
(3) SHELVING UNITS SHALL BE REINSTALLED AFTER THE
COMPLETION OF CONSTRUCTION IN A LOCATION
DIRECTED BY THE COR
DEMO LEGEND
CUT A MASONRY OPENING IN WALL TO ACCOMMODATE
THE INSTALLATION OF THE NEW MAN DOOR AND FRAME,
SEE D1/SK-1 FOR LATCH SIDE JAMB LOCATION
REMOVE AND DISPOSE OF EXISTING OFFICE WALLS,
DOOR, COUNTERTOPS, ETC. DOWN TO BARE CONCRETE
REMOVE OR MODIFY POLYCARBONATE COVER AND
FRAME AS NECESSARY TO ACCOMMODATE MECHANICAL
EQUIPMENT
CONCRETE FLOOR TO BE REMOVED
INDICATES ITEM TO BE DEMOLISHED
1/16" = 1'-0"
DIMENSION PLANF4
TR
U
E N
PLAN
NORTH
A. FIELD VERIFY ALL DIMENSIONS IN FIELD
B. USE U.S. HERITAGE GROUP CUSTOM ROCK ISLAND
ARSENAL PHL 3.5 MORTAR FOR ALL MASONRY REPAIR
C. INSTALL DRY SPRINKLER SYSTEM WITH A NITROGEN
GENERATOR THROUGHOUT THE BUILDING, THE SYSTEM
SHALL BE DESIGNED BY A CERTIFIED FIRE PROTECTION
ENGINEER IN ACCORDANCE WITH NFPA 88A, NFPA 13, AND
UFC 3-600-01
D. CUT CONTROL JOINTS AT RIDGES AND VALLEYS OF FLOOR
SLAB AND AS INDICATED ON DRAWINGS
E. INSTALL NEW 7" THICK, 4500 PSI CONCRETE FLOOR WITH A
HEAVY-DUTY WEAR-RESISTANT BROOM FINISH
THROUGHOUT BUILDING
DIMENSION PLAN KEYNOTES
GENERAL ARCHITECTURAL NOTES
INSTALL NEW OVERHEAD COILING DOOR AND ABOVE
DOOR MICROWAVE MOTION SENSOR (BASIS OF DESIGN:
BIRCHER HERCULES 2S), PROGRAM SENSOR TO DETECT
APPROACHING VEHICLES AND IGNORE HUMAN TRAFFIC,
USE EXTENSION MOUNTING BRACKET AS REQUIRED;
INSTALL SURFACE MOUNTED COMMERCIAL 3-BUTTON
CONTROLS ADJACENT TO THE DOOR ON BOTH INSIDE
AND OUTSIDE, OUTSIDE TO BE WEATHER-RESISTANT
AND KEYED FOR SECURE ACCESS CONTROL, THE KEY
SHALL BE THE SAME FOR BOTH EAST AND WEST DOOR
CONTROLS
INSTALL TWO (2) VANDAL AND WEATHER RESISTANT
KEYPADS ON A 84" DUAL HEAD STEEL PEDESTAL (BASIS
OF DESIGN: PEDESTAL PRO 84-DSP-4-12-12) WITH
SEPARATE GOOSENECKS, KEYPADS SHALL ACTIVATE
OVERHEAD DOOR FROM THE EXTERIOR; 3-BUTTON
CONTROLS FROM THE INTERIOR
- SEE DETAIL J3/SK-1
INSTALL 6' WIDE SIDEWALK BETWEEN NEW DOOR AND
PARKING LOT, THE RUNNING SLOPE OF SIDEWALK SHALL
NOT EXCEED 1:20, LANDINGS SHALL BE SUBSTANTIALLY
LEVEL WITH A CROSS SLOPE NOT TO EXCEED 1:48 BUT
SHALL CREATE POSITIVE DRAINAGE; SAW CUT CONTROL
JOINTS AT 6' O.C.
CENTER SIDEWALK ON EXISTING PARKING STALL; ADD
DIAGONAL "NO-PARKING" STRIPING AT EXISTING STALL;
TRUNCATED DOME DETECTABLE WARNING SURFACE AT
TRANSITION FROM PARKING LOT TO SIDEWALK
EXISTING ELECTRICAL TRANSFORMER ON PAD TO
REMAIN
1/4" = 1'-0"
DOORM3
6 INSTALL MAN DOOR & FRAME IN NEW MASONRY OPENING
ELECTRICAL TRANSFORMER ON CONCRETE PAD TO
REMAIN
AD
D
EN
D U
M N o.
AD
D
EN
D U
M N o.
6/
/2
C
SB
AS PART OF THE DESIGN-BUILD OF THE SPRINKLER
SYSTEM CREATE A ROOM TO ACCOMMODATE THE RISER
AND FIRE PUMP FOR THE SPRINKLER SYSTEM; INCLUDE
AN INSULATED HOLLOW METAL DOOR AND FRAME ON
THE EXTERIOR WALL WITH GRADE 1 STORE ROOM
LOCKSET ACCESSIBLE VIA A 4' WIDE SIDEWALK; USE
CONCRETE BLOCK FOR FOR THE WALLS AND
NON-COMBUSTIBLE ASSEMBLY FOR THE CEILING;
ENCLOSURE TO BE FIRE RATED AS REQUIRED BY
APPLICABLE BUILDING CODES
1/16" = 1'-0"
NORTH ELEVATIOND6
PILASTER
REFERENCE NE N1 N2 N3 N4 N5 N6 N7 N8 N9 N10 N11 N12 N13 N14 N15 N16 N17 N18 NW
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
10'-5"
24'-5" ±
48'-10"±
1/16" = 1'-0"
WEST ELEVATIONA3 1/16" = 1'-0"
SOUTH ELEVATIONA6 1/16" = 1'-0"
EAST ELEVATIONA18
NW SW SW S18 S17 S16 S15 S14 S13 S12 S11 S10 S9 S8 S7 S6 S5 S4 S3 S2 S1 SEWB WA SE NEEA EB
PILASTER
REFERENCE
M3 A-501
D4 A-501
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
HARDWARE SET 1:
1 EACH EXIT DEVICE, BHMA A156.3, TYPE 3, PUSH
PAD
1 EACH OUTSIDE TRIM, BHMA A156.3, FUNCTION 08
1 EACH STRIKE, 300 SERIES STAINLESS STEEL, BHMA
A156.18, 630
3 EACH HINGES, BHMA A156.1, A51111
1 EACH SURFACE CLOSER, BHMA A156.4, PARALLEL
ARM C02061
1 EACH GASKETS, BHMA A156.22, HEAD AND JAMB,
R0E155
1 EACH DOOR SWEEP WITH RAIN DRIP, BHMA
A156.22, R5D536
1 EACH THRESHOLD, BHMA A156.21, J36100
4"
2" 2"
100B 100C
DOOR SCHEDULE
REMARKSHDW
SET
MIN. FIRE
RATINGTYPE MAT'L
FRAME
FINISH
DOOR
No. WIDTH HEIGHT THICK TYPE MAT'L FINISH
1 -PT1HM PT1 HMA1 3/4"7'-0"3'-0" 1 a, c
GENERAL DOOR SCHEDULE
NOTES
1. DOORS TO BE FACTORY FINISHED
REMARKS
a. PROVIDE EXTERIOR METAL DOOR WITH
HALF GLASS IN COMPLIANCE WITH UFC
4-010-01, SECTION 3-11 AND A MAXIMUM
U-VALUE OF 0.63.
b. THE VERTICAL LOAD OF THE DOOR
AND OPERATOR STALL BE
SUPPORTED BY THE DOOR GUIDES
c. SEE SPECIFICATION FOR DETAILED
HARDWARE REQUIREMENTS
LEGEND
* EXISTING TO REMAIN
HM HOLLOW METAL
PT1 DARK BRONZE (SW 7048 OR SIM.)
SS STAINLESS STEEL
DOORSFRAMES
1/4" = 1'-0"
DOOR & FRAMEL8
AS
S
C H
ED
U
LE
D
SCHED.
A
3' -4
AS
S
C H
ED
U
LE
D
SCHED.
6"
6" 6"
1 -PT1HM PT1 HMA1 3/4"7'-0"3'-0" 1 a, c
'-0
(F
IE
LD
V
ER
IF
Y)
14'-0"± (FIELD VERIFY)
100A
100D * -** * ***** *
16'-0"14'-0"
1" 2 SS PT1 - SS PT1 - b, c-
XXXXXX
1/4" = 1'-0"
SIDEWALKG1
1/2" EXPANSION JOINT W/
BACKER ROD & SEALANT
P.C.C. PAVEMENT, 6"
MODIFIED SUBBASE, 6"
1.50% TARGET
1'-0" 2'-0" 2'-0" 1'-0"
PLACE 6" X 6" WELDED
WIRE FABRIC, 10
GAUGE STEEL
3" 3"
6'-0"
PLACE STEEL CHAIRS TO ELEVATE
THE WELDED WIRE MESH OFF OF
THE GROUND. THE CHAIRS SHALL
BE PLACED IN A 2' X 2' GRID.
1/4" = 1'-0"
DOORK1
ALIGN TOP OF STONE
SILL AND TOP OF
SIDEWALK
SLOPE
DOWN
13"±
VERIFY
CENTER DOOR FRAME
ON WALL
COPPER REGLET
FLASHING OVER
EXTERIOR FACE OF
STEEL ANGLE
HEAD CONDITION
THRESHOLD
6" X 3 1/2" X 3/8"
STAINLESS STEEL
ANGLE EACH SIDE OF
THE MASONRY WALL,
BOTTOM FLANGE TO
BEAR A MIN. OF 6" ON
BRICK WALL, SET
FLANGE BEARING IN
MASONRY JOINT (DO
NOT CUT BRICK)
6"
1/4" = 1'-0"
PEDESTALJ3
EDGE OF EXISTING
DRIVE
3' -0
7'
-0
3' -6
16"X16"
CONCRETE PIER
W/ 1/2" CHAMFER
CORNERS
1'-0"
4"X4" SQUARE
STEEL TUBE
12 X 16 STAINLESS
STEEL HOUSING
WITH INTEGRATED
KEYPAD
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
6X6 WELDED WIRE
FABRIC REINFORCING @
2" BELOW TOP OF SLAB
4" OF 3/4" CRUSHED
LIMESTONE BASE
1/4" = 1'-0"
FLOOR SLABJ5
TRENCH DRAIN
7", 4500 PSI CONC. SLAB
WITH BROOM FINISH
XXXXXXXX
UNDER SLAB
VAPOR RETARDER
1/2" PERIMETER
EXPANSION JOINT
2'-0"
R-15 EXTRUDED
POLYSTYRENE INSULATION
TYP. AT PERIMETER
HATCH KEY
APPROXIMATE AREA OF STONE
VENEER TO BE REBUILT (40 SF)
ST
O
N E
SI
LL
C O
R N
IC
E
METAL
FASCIA
AR
C
H
IT
R
AV
E
PI
LA
ST
ER
C
AP
IT
AL
BA
SE
W
(3/4" MIN.)
FULL SCALE
POINTINGA1
2.5xW
NEW MORTAR WITH
CONCAVE PROFILE
FA
C
E O
F M
AS
O
N R
Y
EXISTING
MORTAR
EXISTING
MASONRY
EXISTING
MASONRY
D
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
-1
4/
/2
D
ES
IG
N
ED
B Y:
E.
M
AG
N
U
SO
N D
R
AW
N B
Y:
E.
M
AG
N U
SO
N
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
B U
IL
D
IN
G
IG
SA
R
EP
AI
R
A
C
E
G
J
L
N
C H
EC
KE
D B
Y:
C
SB
3 5 7 9 11 13 15 17 192 4 6 8 10 12 14 16 18 20
B
D
F
H
K
M
P
1 3 5 7 9 11 13 15 17 192 4 6 8 10 12 14 16 18 20
D
ET
AI
LS
EL
EV
AT
IO
N S
SC
H
ED
U
LE
S
1/4" = 1'-0"
EAST ENTRY ARCHM3
1/4" = 1'-0"
ELEMENTSD4
A-501
SHEET KEYNOTES
SHEET NOTES
REBUILD BRICK CORNICE; USE EXISTING BRICKS WHEN
POSSIBLE, MATCH EXISTING IN COLOR, SIZE, AND FINISH
WHERE EXISTING BRICKS ARE NOT AVAILABLE; REMOVE
AND REPLACE METAL FASCIA AS NECESSARY TO
EXECUTE THE WORK
REBUILD BRICK VENEER OVER ARCH, REUSE EXISTING
BRICK AS MUCH AS POSSIBLE, WHERE NOT POSSIBLE
MATCH NEW BRICK TO EXISTING COLOR AND TEXTURE
STRIP, REPAIR, AND PAINT ALL WOOD LOUVERS; REMOVE
AND REPLACE SEALANT AROUND LOUVERS
REPOINT ALL EXPOSED HEAD JOINTS AT STONE SILL
A. REPOINT PILASTER BASES AND ADJACENT BRICKWORK AS
NECESSARY AT THE FOLLOWING PILASTERS: N2, N3, N5,
N7, N8, N11, N15, N17, N18, NW, WB, SE, EA
(APPROXIMATELY 250 SF OF BRICK, SEE DETAIL A1/A-501)
B. REMOVE AND REBUILD THE TOP TWO COURSES OF THE
BRICK CORNICE WHERE THE TOP COURSE HAS FALLEN
OUT OF LEVEL BY MORE THAN 1.5°; USE EXISTING BRICKS
WHEN POSSIBLE, WHERE NOT POSSIBLE MATCH EXISTING
BRICK IN COLOR, SIZE, AND FINISH; USE AVAILABLE
EXISTING BRICKS ON THE NORTH ELEVATION WITH NEW
BRICK BEING RELEGATED TO THE SOUTH ELEVATION;
REMOVE AND REPLACE METAL FASCIA AS NECESSARY TO
EXECUTE THE WORK
(APPROXIMATELY 300 LINEAR FEET OF REBUILD AND
REPAIR)
AD
D
EN
D U
M N o.
6/
/2
C
SB
EXISTING
ELECTRICAL
PANEL
EXISTING
ELECTRICAL
TRANSFORMER
27'-0 7/8"±29'-6 3/8" 3'-3 3/8"
29'-6 3/8" 29'-6 3/8" 3'-3 3/8"
29'-6 3/8"51'-2"27'-0 7/8"
FCO OI-1
FCO
FCO FCO FCO
OPEN PARKING
VTR
EXISTING
EXTERIOR
WALL
EXISTING WOOD
LOUVER. PROVIDE
BIRDSCREEN ON
THE INSIDE
1-1/2" WIDE FLANGE TURNED
OUT. ATTACH TO WOOD
FRAME WITH LAG SCREWS.
ADDITIONAL SHEETMETAL AS
NEEDED TO FILL ARCHED
OPENING.
FULL SIZE
SHEETMETAL
PLENUM
(APPROXIMATELY
56"W X 174"H X 18"D)
48X24 TWO POSITION
DAMPER. RUSKIN
MODEL CD-60 OR EQUAL.
EXISTING
EXTERIOR
WALL
EXISTING WOOD
LOUVER. PROVIDE
BIRDSCREEN ON
THE INSIDE
1-1/2" WIDE FLANGE TURNED OUT.
ATTACH TO WOOD FRAME WITH
LAG SCREWS. ADDITIONAL
SHEETMETAL AS NEEDED TO
FILL ARCHED OPENING.
FULL SIZE
SHEETMETAL
PLENUM
(APPROX. 56"W
X 174"H X 30"D)
EF-1
EF-2
1/4" = 1'-0"
INTAKEA1
1/4" = 1'-0"
EXHAUST FANF1
D
AT
E
AP
PR
M
AR
K D
ES
C
R
IP
TI
O
N
SU
BM
IT
TE
D B
Y:
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
D R
AW
IN
G N
O
U .S
. A R
M Y
G
AR
R
IS
O N
R
O C
K
IS
LA
N
D A
R
SE
N
AL
D
IR
EC
TO
R
AT
E O
F
PU
BL
IC
W O
R
KS
R O
C K
IS
LA
N D
, I L
9-
-1
4/
/2
D
ES
IG
N
ED
B Y:
E.
M
AG
N
U
SO
N D
R
AW
N B
Y:
E.
M
AG
N U
SO
N
AP
PR
O
VE
D B
Y:
G
. K O
SK
I, D
IR
EC
TO
R O
F
PU
BL
IC
W O
R
KS
S.
B
AC
H
, C H
IE
F
O F
EN
G
IN
EE
R
B U
IL
D
IN
G
IG
SA
R
EP
AI
R
A
C
E
G
J
L
N
C H
EC
KE
D B
Y:
C
SB
3 5 7 9 11 13 15 17 192 4 6 8 10 12 14 16 18 20
B
D
F
H
K
M
P
1 3 5 7 9 11 13 15 17 192 4 6 8 10 12 14 16 18 20
M
EC
H
AN
IC
AL
D R
AW
IN
G S
EL
EC
TR
IC
AL
D
R
AW
IN
G
S
MEP-101
1/16" = 1'-0"
ELECTRICAL PLANL6
TR
U
E N
PLAN
NORTH
1/16" = 1'-0"
MECHANICAL PLANE6
ELECTRICAL NOTES
A. PROVIDE ALL NECESSARY LABOR, TOOLS AND MATERIALS
TO CLEAN, COMMISSION AND TEST THE EXISTING
TRANSFORMER LOCATED INSIDE BLDG 138 AND PROVIDE
A COPY OF THE TEST SHEET TO THE COR FOR THEIR
EVALUATION
B. REMOVE AND REPLACE THE EXISTING DISTRIBUTION
PANEL WITH A NEW 18 BREAKER PANEL WITH 200 AMP,
208V, 22KA RATED MAIN BREAKER. THE NEW
REPLACEMENT PANEL SHALL INCLUDE THE FOLLOWING
MINIATURE CIRCUIT BREAKER (MCB):
- PROVIDE TWO (2) MCB EACH 3 PHASES, 208V 20AMP
RATED EACH FOR FEEDING THE TWO EXHAUST FANS
- PROVIDE TWO (2) SINGLE PHASE, ONE POLE, 20 AMP
MCB TO FEED THE NEW TEN (10) POWER OUTLETS,
FIVE (5) OUTLETS PER POLE
- PROVIDE ONE (1) SINGLE PHASE, ONE POLE, 20 AMP
MCB TO FEED THE NEW DOOR OPENER
- PROVIDE ONE (1) SINGLE PHASE, ONE POLE, 20 AMP
MCB TO FEED THE NEW LOUVER
- PROVIDE ONE (1) SINGLE PHASE, ONE POLE, 20 AMP
MCB TO FEED THE EXISTING DOOR OPENER
- PROVIDE ONE (1) SINGLE PHASE, ONE POLE, 20 AMP
MCB TO FEED THE EXISTING LIGHTING SYSTEM
- PROVIDE FOUR (4) SINGLE PHASE, ONE POLE, 20 AMP
MCB AS SPARES
C. PROVIDE ALL NECESSARY LABOR, TOOLS, AND
MATERIALS TO INSTALL TEN NEW POWER, DOUBLE
PRONG, 20 AMP POWER OUTLETS. LOCATE NEW OUTLETS
AS INDICATED ON DRAWING L6/MEP-101.
D. THE CONTRACTOR SHALL PROVIDE AND INSTALL A NEW
WIRING SYSTEM CONSISTING OF 12AWG CONDUCTORS
(PHASE, NEUTRAL AND GROUND) ENCLOSED WITHIN 1
INCH RIGID GALVANIZED STEEL (RGS), INCLUDE PROPER
MOUNTED SUPPORTS. THE NEW WIRING SYSTEM SHALL
BE CONFIGURED TO CONNECT EVERY GROUP OF THE
OUTLETS AND ALL THE OTHER ADDITIONAL LOADS
(EXHAUSTED FANS, THE LOUVER, DOOR OPENER) TO THE
CIRCUIT BREAKERS HOUSED WITHIN THE EXISTING
ELECTRICAL PANEL BOARD. ALL WORK SHALL COMPLY
WITH THE ARTICLES 21,240, 250, 300,310 AND 344 OF THE
NATIONAL ELECTRICAL CODE (NEC) AND UFC
REQUIREMENTS.
E. PROVIDE ALL NECESSARY LABOR, TOOLS, AND
MATERIALS FOR COMMISSIONING AND TESTING THE
EXISTING GROUNDING SYSTEM AND PROVIDE A COPY OF
THE READINGS TO THE COR FOR THEIR EVALUATION. THE
CONTRACTOR SHALL FIX AND REPAIR ANY DAMAGED,
LOOSE, OR MISSING PARTS ON THE GROUND AND BOND
SYSTEM TO OBTAIN BEST GROUNDING READING (25
OHMS OR LESS). IF GROUNDING READING IS GREATER
THAN 25 OHM PROVIDE ONE (1) ADDITIONAL GROUND ROD
AND BARE GROUND CONDUCTORS CONNECTED TO THE
EXISTING GROUNDING SYSTEM.
DUPLEX RECEPTACLE OUTLET
ELECTRICAL LEGEND
MECHANICAL KEYNOTES
1 EXHAUST FAN, SEE DETAIL F1/MEP-101
2 INTAKE, SEE DETAIL A1/MEP-101
EXHAUST FAN (EF) SCHEDULE
PLAN MARK BASIS OF DESIGN MODEL
AIRFLOW
(CFM) ESP (IN WC) MOTOR
DRIVE SPEED MOUNTING
APPROX.
WEIGHT
(LBS)
REMARKS
HP VOLTS
EF-1, EF-2 COOK 36EW416D08 5825 .5 1.0 208-3-60 BELT NOTE 1 PLENUM
WALL 248 2
RETURN AIR FAN SCHEDULE NOTES:
1. PROVIDE FAN SPEED CONTROLLER FOR BALANCING.
2. PROVIDE GRAVITY SHUTTER AND MOTOR SIDE WIREGUARD.
SOW Appendix B
| Sheets and Views |
| G-SET-G-001 |
| G-SET-G-002 |
| G-SET-G-003 |
| A-101-A-101 |
| A-501-A-501 |
| MEP-101-MEP-101 |
File details come from the government source that posted it. Updated .