Attachment 0001 - PWS 01 RFAAP Environmental_Draft_02_2026.docx

DOCX document 60 KB Posted

Attached to
Radford Army Ammunition Plant - DRAFT Solicitation #2
Solicitation number
W519TC-26-R-00003
Issued by

About this file

This is a Performance Work Statement (PWS) for Environmental services at Radford Army Ammunition Plant (RFAAP). The PWS establishes a comprehensive framework for environmental compliance and performance management, requiring the contractor to maintain an Environmental Management System (EMS) aligned with government regulations and industry best practices. The contractor is responsible for managing all plant operations to minimize hazardous materials and toxic waste generation, including source reduction and waste disposal ownership. Key objectives include determining major pollutants and sources at RFAAP, developing pollutant reduction goals and control measures, minimizing environmental incidents through preventive measures, and enhancing internal auditing processes for compliance evaluation.

The contractor must comply with all applicable federal, state, and local environmental laws and regulations including the Resource Conservation and Recovery Act, Clean Air Act, Clean Water Act, Toxic Substances Control Act, NEPA, and DoD NEPA procedures. Specific responsibilities include providing unrestricted government access to databases and records, notifying the Procuring Contracting Officer and Environmental Contract Officer Representative within 15 minutes of regulatory visits, submitting meeting notes within 48 hours, applying for and maintaining required environmental permits with 35 working days' notice for major permits, developing an Annual Environmental Compliance calendar, managing hazardous materials through the WEBCASS-E system, and investigating and reporting environmental spills or unauthorized discharges within one hour. The contractor must also develop a Hazardous Materials Management Plan, support environmental audits, establish minimum three Key Performance Indicators (KPIs) for performance tracking, and remediate any spills or releases resulting from contractor operations to appropriate cleanup standards based on site classification.

View the file

Other files

File Type Posted
RFAAP Draft RFP2 QandA - W519TC26R0003 04Jun2026.pdf PDF
Attachment 0006 - PWS 06 RFAAP Security and Antiterrorism_11_2025_Draft.docx DOCX document
Attachment 0002 - PWS 02 Facility Planning_Draft_02_2026.docx DOCX document
Attachment 0025 - CDRL Instructions.pdf PDF
Attachment 0003 - PWS 03 Fire Protection and ES_11_2025_Draft with ET rev 12_2025.docx DOCX document
Attachment 0005 - PWS 05 Occupational Health_11_2025_Draft.docx DOCX document
Attachment 0001 - PWS 01 RFAAP Environmental_Draft_02_2026.docx DOCX document
W519TC-26-R-0003.pdf PDF
Attachment 0010 - PWS 10 RFAAP Energy and Utilities_Draft_02_2026.docx DOCX document
Attachment 0004 - PWS 04 Property PWS_11_2025_Draft.docx DOCX document
Attachment 0007 - PWS 07 RFAAP Maintenance_12_2025_Draft.docx DOCX document
Attachment 0012 - PWS 12 - ARMS_12_2025_Draft.docx DOCX document
Attachment 0018 - PWS 18 - GROUND WATER MONITORING AND INSTALLATION RESTORATION PROGRAM SUPPORT_12_2025_Draft.docx DOCX document
Attachment 0026 - Hazardous Material Classification Specification.xlsx XLSX spreadsheet
Attachment 0023 - DD254 Contract Security Classification Specification.pdf PDF
Attachment 0028 - COCO SECURITY STATEMENT OF WORK 2025.docx DOCX document
Attachment 0002 - PWS 02 Facility Planning_Draft_02_2026.docx DOCX document
Exhibit C - PWS 7 Att B JMC BUILDER Sustainment Guide.pdf PDF
Request for Information - Transfer of Spare Parts.docx DOCX document
Exhibit B - PWS 7 - RFAAP Maintenance FIandE -- Clean DEC 2024 V1.docx DOCX document
Attachment 0011 - PWS 11 RFAAP Facility Ops and Production Reporting_12_2025_Draft.docx DOCX document
Attachment 0009 - PWS 09 - Safety_Draft_02_2026.docx DOCX document
Attachment 0006 - PWS 06 RFAAP Security and Antiterrorism_11_2025_Draft.docx DOCX document
Attachment 0017 - PWS 17 RFAAP Transition Out_Draft_02_2026.docx DOCX document
Attachment 0013 - PWS 13 RFAAP Technology and Cyber Security_Draft_02_2026.docx DOCX document
Attachment 0036 - Past Performance Questionnaire.docx DOCX document
Attachment 0021 - OPSEC SOW.docx DOCX document
Attachment 0015 - PWS 15 - ALTESS SUPPORT SERVICES_12_2025_Draft.docx DOCX document
Attachment 0030 - Non-Disclosure Agreement NEPSCO.docx DOCX document
Exhibit A - CDRLs.pdf PDF
Attachment 0031 - Final FY25 Ammo Plant Mod.pdf PDF
Attachment 0029 - Non-Disclosure Agreement Azimuth.docx DOCX document
Attachment 0022 - SAMPLE OPSEC ACQUISITIONS PLAN.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RADFORD ARMY AMMUNITION PLANT

PERFORMANCE WORK STATEMENT (PWS)

PWS 1: Environmental April 2026

1. Environmental Objectives

1.1 The objective of this PWS is to establish a comprehensive framework for environmental compliance and performance that aligns with government regulations, industry best practices, and the unique operational needs RFAAP.

1.2 The Contractor shall be evaluated on its ability to meet the requirements of this PWS and the established Key Performance Indicators (KPIs).

1.3 The Contractor shall maintain an Environmental Management System (EMS) to protect public health and the environment and foster a culture of environmental responsibility among employees and stakeholders in accordance with (IAW) all requirements as outlined in Section 3.

1.4 The Contractor shall manage plant operations and methods of all Department of Defense (DoD) operations to eliminate or minimize the use, or generation of, hazardous materials and/or toxic waste. The Contractor’s environmental program shall include efforts aimed at source reduction and use of engineering alternatives to minimize hazardous waste generation at RFAAP. The Contractor shall assume responsibility for ownership, management, and disposal of all contractor-generated solid, non-hazardous, and hazardous waste.

1.4.1 The Army has designated the WEBCASS-E, Hazardous Material Inventory Database (HMID) Module as the single Army Enterprise level capability for HAZMAT and HAZWASTE authorization, tracking, and reporting.

1.4.2 Note: The HMID module does not replace Army enterprise systems such as those used for HAZMAT procurement and distribution.

1.5 The Contractor shall determine the major pollutants and sources at RFAAP and develop pollutant reduction goals, control measures, and management best practices.

1.6 The contractor shall proactively minimize environmental incidents, such as spills, leaks, emissions exceedances, and improper waste disposal, by implementing robust preventive measures, improving operational controls, implementing advanced engineering and administrative controls, etc.

1.7 The contractor shall enhance its internal auditing processes to ensure comprehensive evaluation of environmental compliance, identify areas for improvement, and proactively address risks to achieve regulatory compliance and operational excellence.

2. Requirements:

2.1 The contractor shall comply with all current local, state, and U.S. federal environmental laws, regulations, and Executive Orders to include, but not limited to:

2.1.1 Resource Conservation and Recovery Act (42 USC § 6901)

2.1.2 Safe Drinking Water Act (42 USC § 300f)

2.1.3 Clean Air Act (42 USC § 7401)

2.1.4 Clean Water Act (33 USC 1251)

2.1.5 Toxic Substances Control Act (15 USC 2601)

2.1.6 Emergency Planning and Community Right to Know Act (42 USC § 1101)

2.1.7 National Environmental Policy Act of 1969 (NEPA), as amended (42 USC § 4321 et seq.)

2.1.8 DoD NEPA Implementing Procedures, 30 June 2025

2.1.9 DoD NEPA Implementing Procedures Appendix A (Department of Defense Categorical Exclusions (CATEXs), 30 June 2025

2.1.10 Army NEPA Guidance (SAIE-ZA memorandum, subject: Army Guidance – Department of Defense National Environmental Policy Act Implementing Procedures), 8 August 2025.

2.1.11 Comprehensive Environmental Response, Compensation and Liability Act (42 USC § 9601)

2.1.12 Federal Insecticide, Fungicide, and Rodenticide Act (7 USC 6)

2.1.13 Army Regulations 200-1, and 200-2 and 420-1

2.1.14 Federal Facilities Compliance Act (42 USC § 9620)

3. Communication, Support, Documentation & Permits:

3.1 The Contractor shall provide unrestricted read only access to the Government to review the Contractor’s databases, archived records, and information repository of all data associated with past and present operations at RFAAP and the New River Unit (NRU) operations as they relate to PWS 1. This includes, but is not limited to, blueprints, drawings, operating procedures, maintenance procedures, management manuals, reports, letters log/correspondence files and plant protection standards. Hard copies and/or electronic copies shall be made available upon request.

3.2 The Contractor shall notify the Procuring Contracting Officer (PCO) and the RFAAP Environmental Contract Officer Representative (COR) within 15 minutes of any visit/inspection by federal, state, or local representatives, announced or unannounced. Visits shall not proceed without an RFAAP Environmental COR present. If the RFAAP Environmental COR is not available, an alternative Government staff member will be assigned or a waiver from the environmental point of contact to proceed without a government staff member will be granted to the contractor. The Contractor shall proceed without Government Staff if the Government is not available within 30 minutes of notification. No later than (NLT) 48 hours after completion of the visit, the Contractor shall provide meeting notes/minutes to the RFAAP PCO. (CDRL A01-001) A list of all material requested and/or supplied to the visitors shall be submitted with the meeting notes/minutes. The Contractor shall coordinate all inquiries (telephone calls, correspondence, etc.) regarding RFAAP’s environmental matters with the RFAAP Environmental COR in a timely manner.

3.3 The Contractor shall ensure appropriate coordination with the Government Environmental Staff when communication is made with federal, state and local regulators. This includes written and verbal communications.

3.3.1 The Contractor shall not engage in any negotiations with environmental regulators that will obligate the other party in any manner other than agreed to between the two entities.

3.4 The Contractor shall have primary contact and responsibility for environmental matters which arise as a result of its acts and omissions, as well as the acts and omissions of any of its subcontractors and tenants.

3.5 The Government shall retain primary contact and responsibility for environmental matters that occur prior to the Contractor taking operational control of RFAAP, unless otherwise specified in the contract. The Contractor shall coordinate on all significant communications (i.e., modifications, Notice of Violations (NOVs), or permits, etc.) and negotiations with regulators, and share the correspondences with the Government.

3.6 The Contractor shall defend, negotiate and/or provide assistance in the defense and negotiation of enforcement actions such as Notices of Violation, Notices of Deficiency, Orders, citizens’ suits, etc., which address, or relate to, alleged environmental deficiencies. Additionally, the Contractor shall manage and maintain operational compliance with regulatory notices/orders, which address deficiencies in compliance. The Contractor shall ensure Government notification and coordination with any matters involving federal, state, or local regulatory correspondence are completed within established timeframes and agreed upon by the Contractor and RFAAP Environmental COR. The Contractor shall bear all expenses associated with any non- compliance(s) resulting from Contractor action or inaction, and all expenses necessary to maintain compliance with regulatory requirements. In the event the Government is assessed a monetary fine for violations caused by the Contractor’s performance, actions, or inactions, the Contractor shall reimburse the Government for the amount of the fine and any other costs incurred in resolving the Contractor’s violation.

3.7 The Contractor shall apply for, obtain, and maintain necessary permits and modifications thereto. Permit applications shall be completed with the Army as the ‘facility owner’ and the Contractor named as the ‘facility operator. The Contractor shall sign any applications, modifications, reports, and certifications required by law, regulation, or permit, including those required of operators, dischargers, responsible officials, generators, or otherwise as indicated in the pertinent environmental regulation. The Army shall be identified as and/or sign as owner, where required. Primary facility operating permit applications (i.e. Title V Permit, Resource Conservation and Recovery Act (RCRA) Permit and Virginia Pollutant Discharge Elimination System (VPDES) Permit) shall be provided to the RFAAP Environmental COR for review at least 35 working days prior to submittal to a federal, state, or local regulatory agency. All other permit applications shall be provided to the RFAAP Environmental COR for review seven (7) working days prior to submittal to a federal, state, or local regulatory agency. The RFAAP Environmental COR shall be provided with copies of permits obtained.

3.8 The Contractor shall initiate and complete required environmental documentation as required by Public Law 91-190, National Environmental Policy Act (NEPA) and AR 200-1. Significant NEPA documentation such as Environmental Assessments (EA), Findings of No Significant Impact (FNSI), and Environmental Impact Statements (EIS) are not required to be written by the Contractor. However, the Contractor shall support the Army in developing those documents by providing applicable data and information as needed. Upon request, the Contractor shall review and provide comments on NEPA documents. The Contractor shall coordinate all efforts and documentation through the RFAAP Environmental COR. The Record of Environmental Consideration (REC) shall include all background information necessary for the government to understand the scope of the project and potential environmental impacts. RECs shall be submitted for government approval and signature. The costs incurred to comply with NEPA shall be programmed and charged to the associated project or entity.

3.9 Within one hour of discovery of any environmental spills, unauthorized discharge, excursion to the environment, NOVs or enforcement actions, the Contractor shall notify the PCO and RFAAP Environmental COR. Notifications shall be made in writing. The Contractor shall provide formal information and documentation required by federal, state, and local laws, environmental regulations, and permits.

3.9.1 For the purpose of this requirement, a discharge includes, but is not limited to, any spilling, leaking, pouring, pumping, emitting, emptying, dumping, or seepage into the environment. The Contractor shall investigate the facts of each discharge and develop and submit to the PCO a written pollution incident report within 24 hours of any discharge incident that is reportable to environmental state and/or federal agencies. Photos shall be taken when a spill is discovered, recovered, and after corrective action and cleanup have been completed. (CDRL A01-002)

3.10 The Contractor shall develop responses to findings, violations, and recommendations identified in compliance surveys, inspections, audits, or reports issued by DoD or other federal, state, or local agencies.

3.11 The Contractor shall participate in and support the Government with environmental audits to include, but not limited to, the Environmental Performance Assessment System audit.

3.12 The Contractor shall develop an Annual Environmental Compliance calendar that tracks important dates and deadlines related to critical regulations, permits, training, deadlines, reporting obligations, plan/document management updates and reviews. The calendar shall list tasks and their related environmental media, due dates, to whom the task is reported to and the task origin, such as regulatory citation or permit name/ID. The Contractor shall maintain the compliance calendar to always show a forward-looking 12 months. The Contractor shall provide the RFAAP Government on-site staff access to the calendar.

3.13 The Contractor shall develop a Hazardous Materials Management Plan (HMMP) and manage hazardous materials (HM) and hazardous wastes (HW) according to Army policy. The Contractor shall obtain user access and privileges for WEBCASS-E as required.

3.14 The Contractor shall prohibit the storage and disposal of non-defense-owned toxic and hazardous materials on RFAAP for non-DoD production IAW the provisions of 10 USC 2692. Material brought onto RFAAP that will be consumed or incorporated into products within a reasonable time frame, (approximately one year), and removed from RFAAP upon completion of the manufacturing process is not considered to have been “stored.” This exclusion applies to the contractor as well as subcontractors and tenants. An exception must be obtained from the Secretary of the Army prior to nondefense toxic and hazardous materials being stored or disposed of on the installation. This request for exception must be prepared by the contractor and forwarded through command channels. The Secretary of the Army determines if the material is required or generated by a private person in connection with the authorized and compatible use of an industrial type facility of the DoD. The facility contractor or the subcontractor(s) shall remove from RFAAP the excess material in a proper manner within 180 calendar days after completion of any contract (subcontract) and IAW RCRA, state law and/or other regulatory requirements.

4. Environmental Restoration Efforts:

4.1 Any spills/releases that occur on-site as a result of Contractor operations (including the Contractor’s subcontractors and tenants) which also occur on any part of the facility or Installation Restoration Program site such as SWMU, HWMU, AOPC (Area of Potential Concern) or SSA Site screening Area shall be cleaned. For non-landfill areas, this means that the cleanup level shall be achieved commensurate with the status of the SWMU, HWMU, AOPC, SSA. All SWMUs with No Further Action (NFA) status shall be cleaned to residential standards for the contaminant released by the contractor. Any SWMU not in NFA shall be cleaned to the industrial standard after the appropriate SWMU notification is complete. Any releases/spills occurring in a non-SWMU area shall be cleaned to residential standards in order to avoid future Army liabilities inherited from a Contractor’s operations.

4.1.1 The Contractor, tenants and subcontractors shall comply with the Land Use Controls (LUCs) resulting from the Statement of Basis documents for the SWMUs, HWMUs and AOCs that require LUCs. The Contractor shall review all dig permits and proposed construction sites utilizing the most up to date Geographical Information System (GIS) data to ensure that the LUCs are not violated and to ensure that groundwater monitoring wells are not impeded or damaged.

5. KPI Tracking:

5.1 In addition to any KPIs specified in this PWS, the Contractor shall identify a minimum of three (3) KPIs that measure performance, effectiveness, timeliness, and/or efficiency of Environmental efforts at RFAAP. These additional KPIs shall be included in the KPI report (CDRL A01-003). The initial submission shall be submitted to the PCO for review and approval 30 calendar days after operational control and monthly thereafter.

5.1.1 The contractor shall define the calculation method for each KPI and any sub-KPIs in the first submission of the PWS 1 KPI report ACA for government approval.

5.1.2 The PWS 1 KPI Report shall provide targets for improvement for each KPI, with justification as to why the target was determined. Targets may be based on industry standards or baseline data acquired in the first quarter of performance tracking. Targets may be adjusted on an annual basis or sooner, if necessary, with Government approval.

5.2 When KPIs are trending negative or consistently below target (for at least three consecutive months), the Contractor shall provide a plan or strategy adjustment to work back towards the target. The plan and/or strategy shall include details on actions to be performed, timeline for improvement, and personnel responsible to achieve the target.