This roof inspection report details the conditions of the three sections comprising the roof of Building 139 at Rock Island Arsenal in Illinois. The total roof area is 28,965 square feet across Sections 1, 2 and 3. Each section was inspected on April 3, 2023 and found to have a concrete deck covered by 1/2 inch of perlite and 1 inch of isocyanurate insulation, overlaid with asphalt and gravel. No deficiencies were observed. The report recommends no emergency, remedial or replacement work is needed currently for any of the three sections, with a projected replacement date of zero years.

The related federal contract opportunity is solicitation number W519TC-23-R-2051 for roof and exterior repair work at Building 139 issued by the Department of the Army Materiel Command Contracting Command at Rock Island Arsenal.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Apr 17, 2023 - 7:57AM

Management Report

Rock Island Arsenal Building 139

US Army Rock Island Arsenal 1 Rock Island Arsenal, Rock Island, IL, IL

Prepared For Rock Island Arsenal

Powered By

Sterling Commercial Roofing, Inc.

2711 Locust St.

Sterling IL 61081-1227 P: 815-626-7744 F: 815-626-3628 www.sterlingroofing.com License: 104.015267

Rock Island Arsenal Building 139 US Army Rock Island Arsenal 1 Rock Island Arsenal Rock Island, IL, IL 61299

Site Overview

Total Sections: 3 Total Sq Ft: 28,965 Map Name Sq Ft Est Install Grade

1 Section 1 11,068 NA

2 Section 2 11,422 NA

3 Section 3 6,475 NA

Sterling Commercial Roofing, Inc.

2711 Locust St.

Sterling IL 61081-1227 P: 815-626-7744 F: 815-626-3628 www.sterlingroofing.com

US Army Rock Island Arsenal 1 Rock Island Arsenal Rock Island, IL, IL 61299

Composition Section: Section 1 Size: 11068 Overall Grade: 0

Inspection Date: 04/03/2023 Inspector: Mike Stoneking

Core cut #1 Concrete Deck 1/2 in Perlite 1 in isocyanurate insulation Asphalt& Gravel

Sterling Commercial Roofing, Inc.

2711 Locust St.

Sterling IL 61081-1227 P: 815-626-7744 F: 815-626-3628 www.sterlingroofing.com

US Army Rock Island Arsenal 1 Rock Island Arsenal Rock Island, IL, IL 61299

Observations Section: Section 1 Size: 11068 Overall Grade: 0

Inspection Date: 04/03/2023 Inspector: Mike Stoneking

IMG_7705

IMG_7707

Sterling Commercial Roofing, Inc.

2711 Locust St.

Sterling IL 61081-1227 P: 815-626-7744 F: 815-626-3628 www.sterlingroofing.com

US Army Rock Island Arsenal 1 Rock Island Arsenal Rock Island, IL, IL 61299

Composition Section: Section 2 Size: 11422 Overall Grade: 0

Inspection Date: 04/03/2023 Inspector: Mike Stoneking

Core cut #1 Concrete Deck 1/2 in Perlite 1 in isocyanurate insulation Asphalt& Gravel

Sterling Commercial Roofing, Inc.

2711 Locust St.

Sterling IL 61081-1227 P: 815-626-7744 F: 815-626-3628 www.sterlingroofing.com

US Army Rock Island Arsenal 1 Rock Island Arsenal Rock Island, IL, IL 61299

Observations Section: Section 2 Size: 11422 Overall Grade: 0

Inspection Date: 04/03/2023 Inspector: Mike Stoneking

IMG_7703

IMG_7704

Sterling Commercial Roofing, Inc.

2711 Locust St.

Sterling IL 61081-1227 P: 815-626-7744 F: 815-626-3628 www.sterlingroofing.com

US Army Rock Island Arsenal 1 Rock Island Arsenal Rock Island, IL, IL 61299

Composition Section: Section 3 Size: 6475 Overall Grade: 0

Inspection Date: 04/03/2023 Inspector: Mike Stoneking

Core cut #1 Concrete Deck 1/2 in Perlite 1 in isocyanurate insulation Asphalt& Gravel

Sterling Commercial Roofing, Inc.

2711 Locust St.

Sterling IL 61081-1227 P: 815-626-7744 F: 815-626-3628 www.sterlingroofing.com

US Army Rock Island Arsenal 1 Rock Island Arsenal Rock Island, IL, IL 61299

Budget Matrix Building 139 Rock Island, IL, IL 28965Sq Ft

Overall Grade A = 10 Years or more of service life remaining B = 8-10 Years of service life remaining C = 5-7 Years of service life remaining D = 2-4 Years of service life remaining F = Less than 1 Year of service life remaining

Emergency Remedial Replacement 1 - Section 1 (11,068 Sq Ft) Grade 0 Projected Replacement: 0 Deficiency Qty Total $0.00 $0.00 $0.00

2 - Section 2 (11,422 Sq Ft) Grade 0 Projected Replacement: 0 Deficiency Qty Total $0.00 $0.00 $0.00

3 - Section 3 (6,475 Sq Ft) Grade 0 Projected Replacement: 0 Deficiency Qty Total $0.00 $0.00 $0.00

Emergency Remedial Replacement Budget Totals $0.00 $0.00 $0.00

Powered by TCPDF (www.tcpdf.org)

Sterling Commercial Roofing, Inc.

2711 Locust St.

Sterling IL 61081-1227 P: 815-626-7744 F: 815-626-3628 www.sterlingroofing.com License: 104.015267 http://www.tcpdf.org

File details come from the government source that posted it. Updated .