Attachment 0004 2022-0292 Appendix C - Submittal Register (1).pdf

PDF 136 KB Posted

Attached to
Building 139 Roof and Exterior Repair
Solicitation number
W519TC-23-R-2051
Issued by

About this file

This submittal register outlines the required submissions for a federal contract to repair the roof and exterior of Building 139 at an Army facility. The solicitation number is W519TC-23-R-2051 and involves submittals across various construction and repair specifications. Key required submissions include accident prevention and waste management plans, product data sheets, testing reports, warranties, as-built drawings, training certifications, and hazardous waste manifests. Submissions are due prior to construction, during construction, and as close-out documents. The register lists each required submission paragraph, classification, required approval timeline and provides space to track submission actions and approvals.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 11 PAGES

Building 139 Roof and Exterior Repar

01 33 00 SD-01 Preconstruction Submittals

1.8 GSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

1.6.1 GAPP - Construction

1.6 GAccident Prevention Plan (APP)

SD-06 Test Reports

1.11 FIONotifications and Reports

1.11.2 GAccident Reports

1.11.3 FIOLHE Inspection Reports

SD-07 Certificates

1.5.1.3 FIOCrane Operators/Riggers

1.6.3.1 GStandard Lift Plan

1.7 FIOActivity Hazard Analysis (AHA)

1.8.1 FIOHot Work Permit

1.11.4 FIOCertificate of Compliance

01 45 00.10 20 SD-01 Preconstruction Submittals

1.6 GQC Plan

01 74 19 SD-01 Preconstruction Submittals

1.5 GConstruction Waste Management

Plan SD-06 Test Reports

1.7.2 FIOQuarterly Reports

01 78 00 SD-03 Product Data

1.7.1 FIOWarranty Management Plan

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Appendix C

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 11 PAGES

01 78 00 1.7.1 FIOAs-Built Record of Equipment and Materials

02 41 00 SD-01 Preconstruction Submittals

1.2.2 GDemolition Plan

02 82 00 SD-03 Product Data

1.2.2 GAmended Water

1.3.9 GSafety Data Sheets (SDS) for All

Materials

2.1 GEncapsulants

3.1.2.1 GRespirators

3.1.8 GVacuums

3.1.10 GGlovebags

SD-06 Test Reports

1.5.5 GAir Sampling Results

3.2.12.2 GEncapsulation Test Patches

3.2.13.5 GClearance Sampling

3.3.3.2 GAsbestos Disposal Quantity

Report SD-07 Certificates

1.3.4 GEmployee Training

1.3.5 GNotifications

1.3.7 GRespiratory Protection Program

1.3.10 GAsbestos Hazard Abatement

Plan

1.3.11 GTesting Laboratory

1.3.12 GLandfill Approval

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 11 PAGES

02 82 00 1.3.12 GDelivery Tickets

1.3.12 GWaste Shipment Records

1.3.13 GTransporter Certification

1.3.14 GMedical Certification

1.5.1 GPrivate Qualified Person

Documentation

1.5.2 GDesignated Competent Person

1.5.3 GWorker's License

1.5.4 GContractor's License

1.5.9 GFederal, State or Local Citations

on Previous Projects

2.1 GEncapsulants

3.1 GEquipment Used to Contain

Airborne Asbestos Fibers

3.1.3.3 GWater Filtration Equipment

3.1.8 GVacuums

3.1.8 GVentilation Systems

SD-11 Closeout Submittals

1.3.5 GPermits and Licenses

1.3.5 GNotifications

1.3.7.1 GRespirator Program Records

1.5.7 GProtective Clothing

Decontamination Quality Control Records

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 11 PAGES

02 82 00 1.5.8 GProtective Clothing Decontamination Facility Notification

1.7.1 GRental Equipment

02 83 00 SD-01 Preconstruction Submittals

1.5.1.1 GCompetent Person

1.5.1.2 GTraining Certification

1.5.2.3 GOccupational and Environmental

Assessment Data Report

1.5.2.4 GMedical Examinations

1.5.2.8 GLead, Cadmium, Chromium

Waste Management Plan

1.5.3 GLicenses, Permits and

Notifications

1.5.4 GOccupant Protection Plan

1.5.2.2 GLead, Cadmium, Chromium

Compliance Plan

3.1.1.3 GLead, Cadmium, Chromium

Compliance Plan

3.4.1.1 GInitial Sample Results

3.5.2.1 GWritten Evidence of TSD

Approval SD-03 Product Data

1.6.1 GRespirators

1.6.4 GVacuum Filters

1.6.7 GNegative Air Pressure System

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 11 PAGES

02 83 00 2.1 GMaterials and Equipment

2.1.1 GExpendable Supplies

3.1.1.3 GPressure Differential Log

SD-06 Test Reports

1.3.3 GSampling and Analysis

1.5.2.3 GOccupational and Environmental

Assessment Data Report

1.5.2.3 GSampling Results

SD-07 Certificates

1.5.1.3 GTesting Laboratory

1.5.1.4 GThird Party Consultant

Qualifications

3.1.1.1 GOccupant Notification

3.5.1.1 GClearance Certification

SD-11 Closeout Submittals

3.5.2.1 GHazardous Waste Manifest

3.5.2.1 GTurn-In Documents or Weight

Tickets 03 01 00 SD-01 Preconstruction Submittals

1.5.4 GWork Plan

1.6.1 GWork Plan

SD-03 Product Data

2.5 FIOConventional Concrete

2.6 FIOPolymers

2.7 FIOMiscellaneous Materials And

Equipment

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 11 PAGES

03 01 00 SD-05 Design Data

1.5.1 GRepair Procedures

2.8 FIOMixture Proportioning

SD-08 Manufacturer’s Instructions

2.5 FIOConventional Concrete

2.6 FIOPolymers

04 20 00 SD-02 Shop Drawings

3.3.2.1 GCut CMU

3.2.5 GBracing Calculations

SD-06 Test Reports

3.6.1.1 FIOField Testing of Mortar

3.6.1.2 FIOField Testing of Grout

SD-08 Manufacturer’s Instructions

2.4.1.3 FIOAdmixtures for Masonry Mortar

2.4.2.2 FIOAdmixtures for Grout

07 22 00 SD-02 Shop Drawings

1.3 GInsulation Board Layout

1.3 GVerification of Existing Conditions

SD-03 Product Data

2.1 GInsulation

1.4 GCover Board

2.3 GFasteners

2.1.2 SRecycled Content For Insulation

SD-06 Test Reports

1.7.1 GFlame Spread Rating

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 11 PAGES

07 22 00 1.6 GInstaller Qualifications

1.6 GCertificates Of Compliance For

Felt Materials SD-08 Manufacturer’s Instructions

2.3 GFasteners

2.1 GInsulation

07 53 23 SD-02 Shop Drawings

1.3.1 FIORoof Plan Drawing

1.3.1 FIOWind Load Calculations

1.3.1 FIOBoundaries of Enhanced

Perimeter

1.3.1 FIOCorner Attachments of Roof

System Components

1.3.1 FIOSlopes and Drain Locations

SD-03 Product Data

2.2 FIOCement

2.1.1 GEPDM Sheet

2.1.3 FIOSeam Tape

2.1.5 FIOBonding Adhesive

2.1.4 FIOLap Splice Adhesive

2.1.7 FIOWater Cutoff Mastic/Water Block

2.1.6 FIOLap Cleaner, Lap Sealant, and

Edge Treatment

3.3 FIOFlashings

2.1.8 FIOFlashing Accessories

2.1.8.1 FIOFlashing Tape

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 11 PAGES

07 53 23 2.1.9 FIORoof Insulation

1.8 GWarranty

SD-05 Design Data

1.4.4 GWind Uplift Calculations

SD-07 Certificates

1.4.1 FIOQualification of Manufacturer

1.4.2 FIOQualification of Applicator

1.4.4 GWind Uplift Resistance

1.4.3 GFire Resistance

SD-08 Manufacturer’s Instructions

3.2 GApplication

3.2.3 GApplication Method

3.3.2 GMembrane Flashing

2.1.3 FIOSeam Tape

3.2.4 FIOTape Seams / Lap Splices

3.2.5 FIOAdhesive Seams / Lap Splices

3.2.6 FIOPerimeter Attachment

3.2.4 FIOPrimer

1.6 GCold Weather

SD-11 Closeout Submittals

1.8 FIOWarranty

3.8 FIOInformation Card

07 60 00 SD-02 Shop Drawings

3.1.11 GGravel Stops and fascia

3.1.12 GFlashing for Roof Drains

3.1.8 GBase Flashing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 11 PAGES

07 60 00 3.1.9 GCounterflashing

3.1.13 GFlashing at Roof Penetrations

and Equipment Supports

2.1.4 GReglets

SD-04 Samples

1.4.2 GFinish Samples

SD-08 Manufacturer’s Instructions

1.4.3 GInstructions for Installation

SD-10 Operation and Maintenance Data

1.4.3 GCleaning and Maintenance

07 92 00 SD-03 Product Data

2.1 GSealants

08 51 13 SD-02 Shop Drawings

2.1 GWindows

1.6 FIOFabrication Drawings

SD-03 Product Data

2.1 GWindows

2.2.7.1 GHardware

2.2.2 GFasteners

1.7 GWindow Performance

2.3 GThermal-Barrier Windows

2.4 GMullions

2.1.5 GWeatherstripping

2.2.7 GAccessories

2.2.3 FIOAdhesives

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 11 PAGES

08 51 13 1.7.4 GThermal Performance SD-04 Samples

1.3.3.1 FIOFinish Sample

1.3.3.2 GWindow Sample

SD-05 Design Data

1.3.4 GDesign Analysis

SD-06 Test Reports

1.3.5 FIOMinimum Condensation

Resistance Factor 08 81 00 SD-03 Product Data

2.3 FIOInsulating Glass

1.3 FIOGlazing Accessories

2.4.2.1 FIOSealants

SD-04 Samples

2.3 FIOInsulating Glass

09 24 23 SD-02 Shop Drawings

3.3 FIOLath

SD-03 Product Data

3.5 FIOProportions and Mixing

09 90 00 SD-03 Product Data GCoating

2.1 FIOProduct Data Sheets

SD-04 Samples

2.2 GColor

SD-08 Manufacturer’s Instructions

3.2.1 FIOApplication Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 11 PAGES

09 90 00 2.1 FIOMixing

1.7.1 FIOManufacturer's Safety Data

Sheets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR