Attachment 0004 REDUCED LAT AND FAT TESTING 05-16-2023.docx

DOCX document 20 KB Posted

Attached to
M772 & M776 Mechanical Time Super Quick (MTSQ) Fuzes
Solicitation number
W519TC-23-R-0030
Issued by

View the file

Other files

File Type Posted
Attachment 0015 LOT ACCEPTANCE SHIPPING DOCUMENTATION PROCESS 05-16-2023.pdf PDF
Solicitation W519TC-23-R-0030 Amendment 0001.pdf PDF
Attachment 0002 GUIDANCE ON DOCUMENTATION OF CDRLS 01-02-2023.pdf PDF
Attachment 0003 CONFIGURATION CHANGE MANAGEMENT DOCUMENTATION 01-02-2023.rtf RTF text file
Attachment 0013 SOW FOR THE INERT MODELS 07-06-2022.pdf PDF
Attachment 0005 GFP LIST 11-22-2022.xlsx XLSX spreadsheet
Attachment 0006 OPSEC COVER SHEET 06-23-2022.pdf PDF
Attachment 0012 ALTERNATE SAMPLING PLAN 10-26-2022.pdf PDF
Attachment 0015 LOT ACCEPTANCE - SHIPPING DOCUMENTATION PROCESS 02-11-2021.pptx PPTX presentation
Attachment 0004 REDUCED LAT AND FAT TESTING 10-26-2022.docx DOCX document
Attachment 0009 MIL-STD-1916 DOD TEST METHOD STANDARD 04-01-1996.PDF PDF
Attachment 0008 AMMUNITION REQUIREMENTS FORM 11-22-2022.docx DOCX document
Exhibit A CONTRACT DATA REQUIREMENTS LIST 01-02-2023.pdf PDF
Attachment 0001 PRICE MATRIX 01-19-2023.xlsx XLSX spreadsheet
Attachment 0011 ASC FORM 715-7 COVER SHEET FOR HAZARDOUS MATERIAL 01-24-2023.docx DOCX document
Attachment 0014 COCO SECURITY SOW 01-24-2023.docx DOCX document
Solicitation W519TC-23-R-0030.pdf PDF
Attachment 0007 SOW FOR OPSEC CYBER SECURITY 06-23-2022.pdf PDF
Attachment 0010 DETAIL STATISTICAL PROCESS CONTROL REQUIREMENTS 10-26-2022.docx DOCX document
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 0004

REDUCED LAT and FAT TESTING PLAN Date: May 16, 2023

A reduced test program has been developed to reduce the cost of LAT and FAT for the M772 & M776 fuzes, and to more accurately reflect the maturity of the MTSQ fuze design. Input from JUNGHANS MicroTech and CCDC-AC Quality Assurance were used to create the reduced testing and sampling plan.

The proposed LAT for the M772 and M776 fuzes are listed below in Tables 1 and 2, respectively.

Group
Charge
QE (mils)
Temp
Set Time (s)
Samples
Comments
1
1
~ 0
70°F (21°C)
S
12
Arming Safety
2
1
800-1000
70°F (21°C)
16.5
10
Post Trans-Vibration
5
4
1400
70°F (21°C)
44
10
Reduced from 20 to 10
6
2
1156
-50°F (-46°C)
28
10
Reduced from 20 to 10
7
2
1156
145°F (63°C)
28
10
Reduced from 20 to 10

Total Samples: 52 Table 1 Proposed M772 LAT

Group
Charge
QE (mils)
Temp
Set Time (s)
Samples
Comments
1
1
~ 0
70°F (21°C)
S
12
Arming Safety
2
1
1511
70°F (21°C)
19
10
Post Trans-Vibration
4
4
800
70°F (21°C)
26
10
Reduced from 20 to 10
5
4
800
-50°F (-46°C)
26
10
6
4
800
145°F (63°C)
26
10

Total Samples: 52 Table 2 Proposed M776 LAT

The proposed First Article Ballistic Test for M772 MTSQ Fuze are listed below in Tables 3 & 4.

Arming Safety Test (70°F/21°C)

Charge
QE (mils)
Set
Quantity
1
~ 0
S
12

Table 3 Proposed Arming Safety Test for M772 Mechanical Time Functioning Test

Group
Charge
QE (mils)
Temp
Set Time (s)
Samples
Comments
1
1
800-1000
70°F (21°C)
16.5
10
Post Trans Vib
2
4
1400
70°F (21°C)
44
15
3
2
1156
70°F (21°C)
28
15
4
2
1156
-50°F (-46°C)
28
15

Table 4 Proposed Time Function Test for M772 The proposed First Article Ballistic Test for M776 MTSQ Fuze are listed below in Tables 5 & 6.

Arming Safety Test (70°F/21°C)

Cartridge
Charge
QE (mils)
Set
Quantity
Inert 60mm
1
~ 0
S
12

Table 5 Proposed M776 Arming Safety Test

Mechanical Time Functioning Test

Cartridge
Charge
QE (mils)
Temp
Set (sec)
Quantity
Comments
60mm
1
1511
70°F (21°C)
19.0
10
Post Trans Vib
60mm
4
800
70°F (21°C)
26.0
15
60mm
4
800
-50°F (-46°C)
26.0
15
60mm
4
800
145°F (63°C)
26.0
15

Table 6 Proposed M776 Time Function Test

File details come from the government source that posted it. Updated .