Statement of Work
For the
Inert Models of the M772 & M776 MTSQ Timing Fuze
Prepared by:
CCDC AC Fuze Division
06 July 2022
7 /6 /2 0 2 2
X S hala P enev olpe
S igned by : P EN EV O L P E .S H AL A .M .1 2 3 9 7 1 9 9 2 5
CCDC Armaments Center
Electrical Engineer, Fuze Division, GS-12
Indirect Fires Fuzing Branch
973-724-1324
Shala.m.penevolpe.civ@army.mil
Controlled by: DEVCOM-AC
CUI Category: PROCURE
Distribution Statement: D
POC: Shala M. Penevolpe, FCDD-ACM-FF, Picatinny Arsenal, NJ
Attachment 0013 mailto:Shala.m.penevolpe.civ@army.mil
STATEMENT OF WORK
INERT M772/M776 MTSQ Fuze Models
1. OBJECTIVE
The objective of this Statement of Work (SOW) is to enable the U.S. Government to purchase INERT cutaway models and full-up INERT models in support of ongoing PM CAS contracts. Deliverables under the base contract will be for INERT Cutaway models and INERT models, part of CLINs 000X and 000X
2. BACKGROUND
The U.S. Government requires INERT models of the fuze to brief the fuze design to team members, program management, and the user community under the production base contract being awarded.
3. APPLICABLE DOCUMENTS
3.1 DRAWINGS
The MTSQ fuze models shall be fabricated in accordance with the following drawings:
12624567 Fuze, MTSQ, M772 Assembly
12361000 Fuze, MTSQ, M776
4. REQUIREMENTS
4.1 Inert Cutaway Models
4.1.1 The contractor shall fabricate and deliver to the Government inert cutaway models.
4.1.2 The inert cutaway model shall consist of a full-up assembled fuze with a 90-degree cross section of material removed to expose internal features and subassemblies. The cross section shall be oriented to minimize destruction of internal features. Unnecessary lubricants or adhesives shall be omitted.
Components which are difficult to install or cross section, such as O-rings, shall be omitted upon
Government approval. Explosives shall be replaced with inert, non-hazardous, compatible materials with an equivalent final form. Components or features which when present reveal sensitive data or permit reverse engineering, shall be altered or omitted to prevent disclosure of sensitive data; Government approval of the altered design is required. The model shall be engraved or have a non-removable permanent marking to identify the assembly as inert per Government policy. The model shall be delivered with a display stand fixture to securely hold and display the model. The model shall not be permanently attached to the fixture. The final design shall be compliant with the security classification guide and approved by the Government prior to fabrication.
4.1.3 The contractor shall modify drawings as necessary for fabrication of the cutaway inert models. The contractor shall deliver the modified drawings to the Government for review and approval before work is started on the sectioned models.
4.2 Inert Models
4.2.1 The contractor shall fabricate and deliver to the Government inert models.
4.2.2 The inert model shall consist of the functional full-up assembled fuze with compatible, mass equivalent, inert material used in place of explosive materials. Components or features which when present reveal sensitive data or permit reverse engineering, shall be altered or omitted to prevent disclosure of sensitive data; Government approval of the altered design is required. The model shall be engraved or have a non-removable permanent marking to identify the assembly as inert per Government policy. The final design shall be compliant with the security classification guide and approved by the
Government prior to fabrication. The models shall be delivered in standard fuze packaging in accordance with the drawing.
4.2.3 The contractor shall modify drawings as necessary for fabrication of the inert models. The contractor shall deliver the modified drawings to the Government for review and approval before work is started.
5. GFM
GFM will not be provided during the performance of this inert model SOW
6. SHIPPING INSTRUCTIONS
When quantities of each model are requested, items shall be shipped to the address specified on the associated modification.