PD102_FIRST FLOOR PLUMBING DEMOLITION PLAN.pdf

PDF 277 KB Posted

Attached to
CORROSION CONTROL FACILITY B3407, HIANG, JBPHH, HI
Solicitation number
W50SLF24R0003
Issued by

About this file

This document is a Solicitation Notice for a Request for Proposal (RFP) for the construction of a Corrosion Control Facility B3407 at the Hawaii Air National Guard (HIANG), Joint Base Pearl Harbor-Hickam, Hawaii. The solicitation is set-aside for small businesses under NAICS code 236220 with a size standard of $45,000,000.

The project includes repairs and renovations to an existing F-22 corrosion control, wash rack and fuel cell repair facility. Key requirements include repairing the facility exterior, replacing the roof, renovating maintenance shop space, restrooms, and administrative areas. The project also involves replacing the 2-bay maintenance hangars to accommodate F-22 operations, including upgrades to power, HVAC, fire suppression, plumbing, and electrical systems. Additional work includes concrete pavement, seismic analysis and retrofitting, and a lightning protection system. The contract duration is 550 calendar days after notice to proceed.

The solicitation includes government options for KalWall, paving, epoxy coating, and an entry logo. A pre-proposal conference is scheduled for August 6, 2024, and the solicitation closing date is September 2, 2024. The source selection will be based on technical capability, past performance, and price. The Department of the Army National Guard is the contracting agency for this opportunity.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A A

BB

CC

DD

EE

1" 2"

1 3

SHEET KEYNOTES

A

B

C

D

1 2 3 4 5

A

B

C

D

1 2 3 4 5

SHEET NUMBER

ISSUE DATE

REVISION HISTORY

PROJECT INFORMATION

DRAWN BY:

DESIGNED BY: REVIEWED BY:

PROJECT MANAGER:

PROJECT NUMBER

SHEET TITLE:

GENERAL SHEET NOTES

Frankfurt-Short-Bruza Associates, P.C.

5801 Broadway Extension, Suite 500

Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

6" 1'-6"1'0

1 1/2" = 1'-0"

0 6" 1' 2'

1" = 1'-0"

0 1' 2' 4'

1/2" = 1'-0"

0 2' 4' 8'

1/4" = 1'-0"

0 4' 8' 16'

1/8" = 1'-0"

0 8' 16' 32'

1/16" = 1'-0"

3" 9"6"0

3" = 1'-0"

1' 3'2'0

3/4" = 1'-0"

2' 6'4'0

3/8" = 1'-0"

4' 12'8'0

3/16" = 1'-0"

8' 24'16'0

3/32" = 1'-0"

8/26/2024 12:28:09 PM

C

:\U sers\VVALEN

C

IA\D

ocum ents\55500-N

G

BJ-H

I F22 PLU

S-U

P C C

B3407 - P-23_vvalenciaN

SA8N

.rvt

VV

VV EKS

FIRST FLOOR PLUMBING

DEMOLITION PLAN

1 AUGUST 2024

PD102

H aw ai i A ir N at io na l G ua rd

F- R ig ht -S iz e:

C or ro si on C on tr ol

H ic ka m A

FB

, H on ol ul u, H aw ai i

PU

T YO

U R

C

EN

TR

AL FILE PATH

H

ER

E

NDM

0%

C O

N

TR

AC

T

D O

C U

M

EN

TS

FSB2021-555-00

SCALE:

N

1/8" = 1'-0"

FIRST FLOOR PLUMBING DEMOLITION PLANA1

A. REFER TO P-001 FOR LEGENDS, ABBREVIATIONS AND GENERAL

NOTES.

1.

2.

3.

4.

5.

6.

7.

8.

9.

DEMOLISH EXISTING PLUMBING FIXTURE AND ALL ASSOCIATED

PIPING. DEMOLISH PIPING BACK TO MAINS AND CAP. PATCH

FLOOR PENETRATIONS AND PREP SLAB TO MATCH NEW FLOOR

FINISH IF NEEDED.

DEMOLISH EXISTING FLOOR DRAIN. PLUG AND CAP. PATCH

FLOOR PENETRATIONS AND PREP SLAB TO MATCH NEW FLOOR

FIXTURE.

EXISTING FLOOR DRAIN TO REMAIN.

EXISTING FLOOR CLEANOUT TO REMAIN.

DEMOLISH EXISTING AIR COMPRESSOR AND REGULATOR. VALVE

AND CAP EXISTING PIPING. PREPARE FOR NEW CONNECTIONS.

EXISTING COMPRESSED AIR PIPING TO REMAIN.

DEMOLISH EXISTING BREATHING AIR PURIFICATION SYSTEM.

VALVE AND CAP EXISTING PIPING. PREPARE FOR NEW

CONNECTIONS. EXISTING AIR PIPING TO REMAIN.

DEMOLISH EXISTING FIXTURE AND ALL ASSOCIATED PIPING.

VALVE AND PREPARE PIPING FOR NEW FIXTURE.

EXISTING DOMESTIC COLD WATER TO REMAIN.

EXISTING DOMESTIC WATER HEATER TO REMAIN.

DESCRIPTION DATE

3 Addendum 03 08/26/2024

File details come from the government source that posted it. Updated .