This document is a Solicitation Notice for a Request for Proposal (RFP) for the construction of a Corrosion Control Facility B3407 at the Hawaii Air National Guard (HIANG), Joint Base Pearl Harbor-Hickam, Hawaii. The solicitation is set-aside for small businesses under NAICS code 236220 with a size standard of $45,000,000.
The project includes repairs and renovations to an existing F-22 corrosion control, wash rack and fuel cell repair facility. Key requirements include repairing the facility exterior, replacing the roof, renovating maintenance shop space, restrooms, and administrative areas. The project also involves replacing the 2-bay maintenance hangars to accommodate F-22 operations, including upgrades to power, HVAC, fire suppression, plumbing, and electrical systems. Additional work includes concrete pavement, seismic analysis and retrofitting, and a lightning protection system. The contract duration is 550 calendar days after notice to proceed.
The solicitation includes government options for KalWall, paving, epoxy coating, and an entry logo. A pre-proposal conference is scheduled for August 6, 2024, and the solicitation closing date is September 2, 2024. The source selection will be based on technical capability, past performance, and price. The Department of the Army National Guard is the contracting agency for this opportunity.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A A
BB
CC
DD
EE
1" 2"
1 3
SHEET KEYNOTES
A
B
C
D
1 2 3 4 5
A
B
C
D
1 2 3 4 5
SHEET NUMBER
ISSUE DATE
REVISION HISTORY
PROJECT INFORMATION
DRAWN BY:
DESIGNED BY: REVIEWED BY:
PROJECT MANAGER:
PROJECT NUMBER
SHEET TITLE:
GENERAL SHEET NOTES
Frankfurt-Short-Bruza Associates, P.C.
5801 Broadway Extension, Suite 500
Oklahoma City, OK 73118-7436
405.840.2931 | fsb-ae.com
6" 1'-6"1'0
1 1/2" = 1'-0"
0 6" 1' 2'
1" = 1'-0"
0 1' 2' 4'
1/2" = 1'-0"
0 2' 4' 8'
1/4" = 1'-0"
0 4' 8' 16'
1/8" = 1'-0"
0 8' 16' 32'
1/16" = 1'-0"
3" 9"6"0
3" = 1'-0"
1' 3'2'0
3/4" = 1'-0"
2' 6'4'0
3/8" = 1'-0"
4' 12'8'0
3/16" = 1'-0"
8' 24'16'0
3/32" = 1'-0"
8/26/2024 12:28:09 PM
C
:\U sers\VVALEN
C
IA\D
ocum ents\55500-N
G
BJ-H
I F22 PLU
S-U
P C C
B3407 - P-23_vvalenciaN
SA8N
.rvt
VV
VV EKS
FIRST FLOOR PLUMBING
DEMOLITION PLAN
1 AUGUST 2024
PD102
H aw ai i A ir N at io na l G ua rd
F- R ig ht -S iz e:
C or ro si on C on tr ol
H ic ka m A
FB
, H on ol ul u, H aw ai i
PU
T YO
U R
C
EN
TR
AL FILE PATH
H
ER
E
NDM
0%
C O
N
TR
AC
T
D O
C U
M
EN
TS
FSB2021-555-00
SCALE:
N
1/8" = 1'-0"
FIRST FLOOR PLUMBING DEMOLITION PLANA1
A. REFER TO P-001 FOR LEGENDS, ABBREVIATIONS AND GENERAL
NOTES.
1.
2.
3.
4.
5.
6.
7.
8.
9.
DEMOLISH EXISTING PLUMBING FIXTURE AND ALL ASSOCIATED
PIPING. DEMOLISH PIPING BACK TO MAINS AND CAP. PATCH
FLOOR PENETRATIONS AND PREP SLAB TO MATCH NEW FLOOR
FINISH IF NEEDED.
DEMOLISH EXISTING FLOOR DRAIN. PLUG AND CAP. PATCH
FLOOR PENETRATIONS AND PREP SLAB TO MATCH NEW FLOOR
FIXTURE.
EXISTING FLOOR DRAIN TO REMAIN.
EXISTING FLOOR CLEANOUT TO REMAIN.
DEMOLISH EXISTING AIR COMPRESSOR AND REGULATOR. VALVE
AND CAP EXISTING PIPING. PREPARE FOR NEW CONNECTIONS.
EXISTING COMPRESSED AIR PIPING TO REMAIN.
DEMOLISH EXISTING BREATHING AIR PURIFICATION SYSTEM.
VALVE AND CAP EXISTING PIPING. PREPARE FOR NEW
CONNECTIONS. EXISTING AIR PIPING TO REMAIN.
DEMOLISH EXISTING FIXTURE AND ALL ASSOCIATED PIPING.
VALVE AND PREPARE PIPING FOR NEW FIXTURE.
EXISTING DOMESTIC COLD WATER TO REMAIN.
EXISTING DOMESTIC WATER HEATER TO REMAIN.
DESCRIPTION DATE
3 Addendum 03 08/26/2024