Q and A as of 16 June 2026.docx
DOCX document 33 KB Posted
- Attached to
- Hangar Fire Alarm System
- Solicitation number
- W50S9J-26-B-A010
- Issued by
-
Department of the Army National Guard
About this file
This is a Questions and Answers (Q&A) document dated 16 June 2026 for solicitation W50S9J-26-B-A010, a fire alarm system repair and replacement project for the West Virginia Air National Guard at McLaughlin Air National Guard Base in Charleston, WV. The document addresses inquiries from potential contractors regarding the Hangar Fire Alarm System project, which involves repairing, replacing, or refurbishing the fire alarm and mass notification systems in hangars 407 and 421. The Q&A file does not present specific response dates, award dates, pricing terms, or set-asides in isolation but rather clarifies technical, contractual, and administrative questions that arose during the solicitation period, serving as a supplement to the primary solicitation documents, statement of work, and technical drawings provided to bidders.
Without access to the specific questions and answers contained within the document, the full technical requirements, clarifications on system specifications, contractor eligibility criteria, and administrative procedures cannot be detailed. Interested contractors should reference this Q&A document in conjunction with the main solicitation, statement of work, and architectural/engineering drawings to ensure comprehensive understanding of the project scope and requirements established by the Department of the Army National Guard.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CAO 16 June 2026
QUESTIONS AND ANSWERS
407 and 421 Hangar Fire Alarm System W50S9J-26-B-A010 1679 Coonskin Drive Charleston, WV
1. Will the Government consider a design that does not reuse the existing Siemens panel in Building 407, but instead replaces it so that both Building 407 and 421 are served by a single, unified Potter fire alarm and mass notification system?
· If allowed, are there any constraints (e.g., existing base‑wide monitoring infrastructure, network compatibility, or standardization with other base facilities) that we must specifically address in our design narrative and submittals?
· An acceptable “or equal” system substitution under the current solicitation, provided we demonstrate full compliance with all code and UFC requirements and functional equivalency/improvement; or
· A change that would require a formal modification to the SOW?
Answer: Bidders are to submit their bids based on the original Statement of Work posted to SAM.gov on 12 May 2026.
2. Regarding the NTP and 90 days for completion, is the government willing to work with the winning bidder for an extension on the period of performance due to possible supply chain delays?
Answer: Yes. The government understands the delays and will work with the contractor. Please advise as soon as possible of any delays.
3. Is the contractor to install heat detectors that are addressable or conventional wired as a single zone to an addressable system using an initiating Device Circuit Monitor Module?
Answer: The heat detectors installed will be addressable.
4. Will the aircraft be in the hangar during the installation process?
Answer: Yes, it is a possibility. The contractor will work with Maintenance leadership to deconflict. Aircraft maintenance is scheduled months in advance. They will also work with the contractor for any unforeseen maintenance requirement for day to day operations.
5. Is the existing conduit being used?
Answer: Yes. Contractors are to use the existing conduit.
6. When using a lift in the hangar, what height has been used for previous work?
Answer: 75 feet but contractor will need to verify.
7. In reviewing the Statement of Work and accompanying drawings, we request the following if available:
Complete Fire Alarm Drawings
Please note that there are no Sector 1 and 2 drawings and it appears that portions of Sectors 3 and 4 may not be complete. We would like to request a review of the drawings package and issuance of any sheets (sectors) which may be available but were not included in the original package provided on SAM.gov.
Answer: All sectors are available for both buildings on the drawings uploaded to SAM.gov. Sector 1 and 2 are FP building 407 page 2 and 3 respectively. Sector 3 is all there on FP building 407 page 4 and Bldg 421 page 6. Sector 4 is provided on FP building 407 page 5 and Bldg 421 page 5.
8. Will a copy of the Site Visit Attendees List for the 26MAY26 site Visit be posted to SAM.gov?
Answer: The list of attendees can be found on the Site Survey Summary on sam.gov
9. Will close-up views of all cards/modules in the existing Fire Alarm Control Units (FACU)?
Answer: No additional photos will be provided.
10. Are Record Drawings available for the existing Fire Alarm Control Units in Hangar 407 & 421?
Answer: Contractors to bid on drawings provided in the Statement of Work and uploaded to sam.gov.
11. Existing Initiation Devices: a. Is it the intention of the provided Scope of Work to replace all existing conventional initiation devices with 100% addressable initiation devices to include the following? Manual Pull Stations, Smoke detectors, Heat detectors and Duct detectors.
Answer: Yes, all existing devices to be replaced with addressable devices.
12. Is the existing HEF System to be removed from service per the USAF Sundown Policy as mandated by the 2020 National defense Act?
Answer: The HEF system has been deactivated, and the intent of this contract is not to remove or modify the HEF system
13. . Please confirm which existing devices on the provided fire alarm/MNS plans are “conventional” and are to be removed and replaced under this project
Answer: All devices shown on plans are conventional and to be replaced.
14. Are the conduits/raceways serving the conventional devices dedicated solely to those conventional circuits, or do they contain any wiring associated with the existing Siemens addressable system in Room 137, Building 407?
Answer: Yes, the conduits serving the conventional devices are solely to those conventional circuits, and do not share wiring with the existing siemens addressable system in Building 407.
15. If any raceways are shared with Siemens wiring, will temporary interruptions/controlled outages of Siemens circuits be permitted during demolition and installation, and are there any restrictions (hours, coordination requirements, etc.)?
Answer: interruptions and outages of the fire alarm and MNS system will be permitted during the contract period.
16. Please provide any available Siemens system drawings (riser diagrams, device layouts, NAC/MNS layouts) and a current point list so we can understand what devices and functions are being served by the existing Siemens panel in Room 137, Building 407.
Answer: No additional drawings will be provided during the solicitation.
17. Please confirm whether the existing Siemens panel currently supervises or controls any devices in Building 421.
Answer: The addressable panel in 407 does not currently supervise or control devices in building 421
18. Please confirm that the Government will accept a design where the new MNS is provided on the new Potter system in Building 421, with required signaling to/from the existing Siemens panel in Building 407, instead of a Siemens MNS add‑on.
Answer: The government does not specify the brand of MNS system. The new MNS system must be compatible with the existing Siemens system.