This is a Questions and Answers document for Solicitation W50S9J-26-B-A010, issued by the Department of the Army National Guard on 3 June 2026, addressing inquiries regarding the Hangar Fire Alarm System project at McLaughlin Air National Guard Base in Charleston, West Virginia. The solicitation concerns the repair and replacement or refurbishment of fire alarm and mass notification systems serving Hangars 407 and 421.
Key clarifications provided include: bidders must submit proposals based on the original Statement of Work posted to SAM.gov on 12 May 2026, with system substitutions permissible only if demonstrating full compliance with code and UFC requirements; the government will consider extensions to the 90-day performance period due to supply chain delays; all existing conventional initiation devices (manual pull stations, smoke detectors, heat detectors, and duct detectors) must be replaced with addressable devices; heat detectors must be addressable rather than conventional wired; aircraft may remain in the hangar during installation, requiring coordination with Maintenance leadership; existing conduit must be reused; lift heights previously used in the hangar have reached 75 feet; complete fire alarm drawings for all sectors are available on SAM.gov; and the existing HEF system has been deactivated and is not subject to modification under this contract per the USAF Sundown Policy mandated by the 2020 National Defense Act. The government declined to provide additional photographs of control unit cards/modules or record drawings beyond those included in the original Statement of Work package.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CAO 3 June 2026
QUESTIONS AND ANSWERS
407 and 421 Hangar Fire Alarm System W50S9J-26-B-A010 1679 Coonskin Drive Charleston, WV
1. Will the Government consider a design that does not reuse the existing Siemens panel in Building 407, but instead replaces it so that both Building 407 and 421 are served by a single, unified Potter fire alarm and mass notification system?
· If allowed, are there any constraints (e.g., existing base‑wide monitoring infrastructure, network compatibility, or standardization with other base facilities) that we must specifically address in our design narrative and submittals?
· An acceptable “or equal” system substitution under the current solicitation, provided we demonstrate full compliance with all code and UFC requirements and functional equivalency/improvement; or
· A change that would require a formal modification to the SOW?
Answer: Bidders are to submit their bids based on the original Statement of Work posted to SAM.gov on 12 May 2026.
2. Regarding the NTP and 90 days for completion, is the government willing to work with the winning bidder for an extension on the period of performance due to possible supply chain delays?
Answer: Yes. The government understands the delays and will work with the contractor. Please advise as soon as possible of any delays.
3. Is the contractor to install heat detectors that are addressable or conventional wired as a single zone to an addressable system using an initiating Device Circuit Monitor Module?
Answer: The heat detectors installed will be addressable.
4. Will the aircraft be in the hangar during the installation process?
Answer: Yes, it is a possibility. The contractor will work with Maintenance leadership to deconflict. Aircraft maintenance is scheduled months in advance. They will also work with the contractor for any unforeseen maintenance requirement for day to day operations.
5. Is the existing conduit being used?
Answer: Yes. Contractors are to use the existing conduit.
6. When using a lift in the hangar, what height has been used for previous work?
Answer: 75 feet but contractor will need to verify.
7. In reviewing the Statement of Work and accompanying drawings, we request the following if available:
Complete Fire Alarm Drawings
Please note that there are no Sector 1 and 2 drawings and it appears that portions of Sectors 3 and 4 may not be complete. We would like to request a review of the drawings package and issuance of any sheets (sectors) which may be available but were not included in the original package provided on SAM.gov.
Answer: All sectors are available for both buildings on the drawings uploaded to SAM.gov. Sector 1 and 2 are FP building 407 page 2 and 3 respectively. Sector 3 is all there on FP building 407 page 4 and Bldg 421 page 6. Sector 4 is provided on FP building 407 page 5 and Bldg 421 page 5.
8. Will a copy of the Site Visit Attendees List for the 26MAY26 site Visit be posted to SAM.gov?
Answer: The list of attendees can be found on the Site Survey Summary on sam.gov
9. Will close-up views of all cards/modules in the existing Fire Alarm Control Units (FACU)?
Answer: No additional photos will be provided.
10. Are Record Drawings available for the existing Fire Alarm Control Units in Hangar 407 & 421?
Answer: Contractors to bid on drawings provided in the Statement of Work and uploaded to sam.gov.
11. Existing Initiation Devices: a. Is it the intention of the provided Scope of Work to replace all existing conventional initiation devices with 100% addressable initiation devices to include the following? Manual Pull Stations, Smoke detectors, Heat detectors and Duct detectors.
Answer: Yes, all existing devices to be replaced with addressable devices.
12. Is the existing HEF System to be removed from service per the USAF Sundown Policy as mandated by the 2020 National defense Act?
Answer: The HEF system has been deactivated, and the intent of this contract is not to remove or modify the HEF system