This document is an amendment (Standard Form 30) to a solicitation for the repair of recreation areas at the Tennessee Army National Guard's Training and Education Center (TEC). The amendment revises the specification, incorporates questions and answers, updates the solicitation, and modifies some contract clauses.
Key details include:
- Solicitation Number: W50S98-24-B-0008, PSXE 242029
- Project: Repair TEC Recreational Areas
- Scope: Includes demolition and replacement of an existing running track surface, installation of new concrete pads and pavement, utility work, and other site improvements
- Responses must acknowledge receipt of the amendment prior to the specified due date
- The offeror acceptance period has increased from 10 to 90 days
- The solicitation contains a detailed question and answer section addressing various technical and administrative aspects of the requirement
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PSXE242029
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
1. REVISION OF SPECIFICATION C1-1
2. QUESTIONS AND ANSWERS ARE HERE BY INCORPORATED INTO THIS SOLICITATION - SEE SECTION 00 73 00
1. CONTRACT ID CODE PAGE OF PAGES
1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Sep-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S9824B0008
X 9B. DATED (SEE ITEM 11)
24-Aug-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Sep-2024
CODE
USPFO TN 134 MISSION SUPPORT CONTRACTING
123 BRISCOE DRIVE
MCGHEE TYSON ANG BASE TN 37777-6227
W50S98 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W50S9824B0008
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 01 10 - TABLE OF CONTENTS
The following have been modified:
TABLE OF CONTENTS
TABLE OF CONTENTS
SOLICITATION, OFFER, AND AWARD SF 1442 and SF 1442 BACK
SECTION 00 10 00 - BID SCHEDULE, NOTES
SECTION 00 21 00 - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
SECTION 00 45 00 - REPRESENTATIONS & CERTIFICATIONS
SECTION 00 70 00 - CONTRACT CLAUSES
SECTION 00 73 00 - SPECIAL CONTRACT REQUIREMENTS
SECTION 01 00 00 - GENERAL REQUIREMENTS
ATTACHMENT 1 - STATEMENT OF WORK – PLANS, DRAWINGS, AND SPECS INCLUDED (220
Pages)
ATTACHMENT 2 – REVISIED SPECIFICATION C1-1
SECTION 00 10 00 - SOLICITATION
The offeror acceptance period has increased by 80 from 10 to 90.
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
The following have been added by full text:
QUESTIONS AND ANSWERS
W50S98-24-B-0008 PSXE 242029 Repair TEC Recreational Areas Pre-Bid Questions
1. On drawing C2.3, detail A11 shows a post-tensioned concrete pavement. This method would be significantly more costly than a traditional cast in place 4" inch thick concrete slab with welded wire mesh. If it is anticipated to have foot traffic only then we would recommend a traditional cast in place 4" inch thick concrete slab with welded wire mesh for a more economical cost than a post-tension slab. Please bid per the drawings and specifications.
2. I have examined the drawings and I have not found any dimensions for the roof. Are there other drawings that are not listed yet, which include dimensions? It is not possible to figure the tapered ISO as well as the cricket ISO without dimensions. The drawing also calls for cover board, but gives no thickness. It also calls for walk pads. Without building dimensions we cannot figure the total quantity.
Contractor had the opportunity to conduct site visits to conduct field measurements and verify dimensions. Dimensions will not be provided at this time.
3. The SOW says to demo and replace existing running track surface. However, the plans do not appear to show the existing running track surface to be removed. Is the running track surface to be removed and replaced?
The existing track surface is to be demoed and removed prior to application of the new Novatrack surface. After the demolition of the existing surface, the surface should be prepared in accordance with the Novatrack manufacturer's recommendations.
4. If the running track surface is to be replaced please identify the thickness of the surface.
The thickness of the existing track surface is unknown, contractor to verify. Assume 1/2" or less for the surface thickness.
5. Is the existing running track surface on a concrete pad.
The existing running track surface is on asphalt.
6. It is unclear what the material of the running track is made of. Is it asphalt, or a rubberized aggregate surface, etc?
Existing surface is polyurethane.
7. If the track surface is not to be replaced then how do we remove the existing Novatrack surface to apply the new surface?
This is a means and methods question, left to Contractor.
8. Please provide a section of the running track assembly cutting through the header curbs, the surface layers and the base.
We do not have that information.
9. Does the new communications for the timing pedestal tie into an existing system or network on campus?
a. Refer to “Timing Pedestal Detail” on Sheet E1.1 for connection to existing communications manhole. Reference to detail A6 on sheet C2.5 should refer to C2.2.
10. If the new communications ties into an existing system or network please clearly identify where this tie in is to occur.
See revised sheet C1.1.
11. If the new communications ties into an existing system or network please clearly identify the distance away from the timing pedestal to the tie in location.
See revised sheet C1.1.
12. Is there any programming associated with tying in the new communications for the timing pedestal?
N/A
13. Sheet C1.2 calls for the new 4” perf drain at the concrete knee wall to be tied into 18” storm drain. Where does this tie-in occur?
See sheet C1.2. Dashed line connecting to existing 18”. Connection occurs at the same location as the note leader indicates.
14. Sheet C1.1 shows several runs of PVC and HDPE storm draining. Is any of this storm drainage new? Please clearly identity all new and existing storm lines, grates and manholes.
See Sheet C1.2 for all new HDPE storm lines.
15. Pin general please clearly identify all new and existing underground utilities shown on the plans.
See attached revised Sheet C1.1.
16. Sheet C1.1 shows several underground communication lines. Obviously, there is a new comm line from the new timing pedestal to the communication box next to the flag pole to be removed, but is there any other new underground comm lines or boxes? Please clearly identify new and existing.
See attached revised Sheet C1.1.
17. The SOW says to include water stations but there is only one shown at the Exercise Stations. Is this the only water station?
There is only one water station. See Detail A10 on Sheet C2.1.
18. Does the exercise station pad need to be post tension concrete to match that of the PT Test area?
No. See Detail A10 on Sheet C2.1.
19. The existing track is caulked on both sides between the track surface and the header curbs. Will this caulk need to be removed and replaced?
Yes, the caulk should be removed prior to the installation of the new track surface and replaced after the new track surface is installed and per Novatrack’s recommendations for edge conditions.
20. Sheet C1.1 calls for Vividplay rubber playground tile at the new PT Test area. Does the concrete slab at the area of floor tiles need to be recessed so the surface of the tile is flush with the surface of the Novatrack application on the surrounding concrete slab?
The entire PT Test Run/Sit-up Area shall have the Novabond surface applied. The floor tiles shall be installed on top of the surface, not recessed. Please utilize the 8” deep beveled tile pieces by Vividplay around the sides and the edge closest to the PT Test Run area.
21. Please provide a basis of design for the timer to be used at the timing pedestal.
N/A
22. Sheets E1.1 and E2.1 show new light poles on new bases, but the only note found says new light poles on existing bases. Please identify any new light pole bases.
a. Note #8 does not apply. Associated with PSXE242020
23. Do all concrete joints receive compression seals in the joints in addition to backer rod and caulking?
A 1/2” expansion joint shall be installed at all locations where new sidewalk meets existing sidewalk. Additionally, a 1/2” expansion joint shall be installed between new sidewalk and the exercise station concrete as well as between the exercise station concrete and the post tensioned PT Test concrete.
24. Sheet C2.2 calls out 4 6’ benches from Global Industrial with Blue Fusion Guard finish to match existing. A photo of the existing benches have been provided to Global Industrial and said they do not have a bench with blue fusion guard finish or anything which matches the look. Please provide more information regarding the bench to be used on this project.
Existing benches are manufactured by Global Industrial. Every effort should be made by the Contractor to match existing benches in finish protection and color. COR shall have final approval.
25. Please provide information regarding the criteria for passing or failing a background check. What types of offenses are allowed and which are not allowed?
This will be addressed on a case by case basis during the badging process.
26. On drawing E1.1the far left and far right pole lights have “Note 2” listed for them which states “Existing pole light fixture to remain. No work.” The fixtures and pole bases are shown in dark black which typically indicates new work along with an “S2” for the fixture type which is shown in the fixture schedule. Is there work to be done on these two poles or are they “No work” as stated in Note 2?
a. No work as stated in Note #2.
27. On drawing E1.1 Note 3 states “Existing light fixture to be replaced. Remove existing pole and pole base and rework circuit to new pole and pole base location as shown”. We cannot locate a Note 3 on the drawing. Does this note apply?
a. Note #3 does not apply. Associated with PSXE242020
28. Per note 9 on drawing E1.1, where is the “existing site lighting panel” located?
a. It is believed that the existing site lighting panel is located with the Transformer at the rear of Building 207, Contractor to verify.
29. Per note 12 on drawing E1.1 states to refer to sheet C2.5 detail A6 and sheet C1.1. Sheet C2.5 does not exist. Please advise.
a. Reference to detail A6 on sheet C2.5 should refer to C2.2.
30. On drawing E1.1 Note 8 states “new pole, base and fixture. Connect to existing circuitry as shown”. We cannot locate a note 8 on the drawing. Does this note apply?
a. Note #8 does not apply. Associated with PSXE242020
31. Per the light fixture schedule on drawing E2.1 it shows a fixture type S4. We cannot locate a fixture type S4 on the drawings. Does this fixture type apply?
a. Fixture does not apply. Associated with PSXE242020
32. Per the “pole base detail” on drawing E2.1, it shows for fixture types S2, S4 and S5.
There are no fixture type S5’s in the light fixture schedule. Only S2, S3 and S4. Should there be a type S5 in the fixture schedule or should the pole base detail be for types S2, S3 and S4?
a. Pole base detail for fixture types S2, S3 and S4. Ignore reference to S5.
33. Please provide the name of a Certified Telecommunications Contractor who has performed work on this base system.
The Government maintains the on base communications network.