This document is an Amendment to Solicitation W50S98-24-B0003, which is for the repair of electrical systems basewide. The amendment adds two new clauses to the contract - 52.211-12 Liquidated Damages-Construction and 52.211-13 Time Extensions. The liquidated damages clause states that the contractor will pay $847.52 per calendar day of delay until the work is completed. The time extensions clause allows for extensions to the contract completion date. The amendment is effective August 8, 2024. The overall solicitation is for a contract to repair electrical systems basewide for the Tennessee Army National Guard. Drawings and specifications are included in the Statement of Work. Contractors must request base access from TSgt Morelock and SSgt Phipps.

View the file

Other files

File Type Posted
24B0003 Bid Opening Sign In Sheet.pdf PDF
OF_1419.pdf PDF
PSXE242014 Repair Electrical Systems Basewide Bid Questions_Response_09.03.2024.docx DOCX document
W50S9824B0003P0004.pdf PDF
W50S9824B0003_4.pdf PDF
C2-1 Details Rev 1.pdf PDF
Black Box Media Converter 10_100_1000 Mb_s Copper to LGC210A-R2.pdf PDF
Information Portal Monument_A3.2 - REV 1.pdf PDF
Information Portal Monument_A3.1 - REV 1.pdf PDF
Information Portal Monument_A3.3 - REV 1.pdf PDF
Black Box LFP441 Gigabit Multimode SFP Transceiver LFP441 BandH.pdf PDF
IMG_3770.JPEG JPEG file
10 40 00 - LED DISPLAY.pdf PDF
20240312_155920.jpg JPG image
20240312_155914.jpg JPG image
20240312_160842.jpg JPG image
PSXE242014 Repair Electrical Systems Basewide Bid Questions_ Response_08.08.2024.docx DOCX document
Site Visit Sign In 24B0003.pdf PDF
Pre-Bid Slides 24B0003.pptx PPTX presentation
W50S9824B0003P0003.pdf PDF
Site-Visit Minutes 24B0003.pdf PDF
W50S9824B0003_4.pdf PDF
W50S9824B0003.pdf PDF
W50S9824B0003.pdf PDF
134th Repair Bldg 132 Electrical System_Drawings_04.12.24.pdf PDF
134th Construct Main Gate Marquee_Specifications_04.30.24.pdf PDF
134th Repair Bldg 120 Exterior_Specifications_04.19.24.pdf PDF
134th Construct Main Gate Marquee_Drawings_4-30-24.pdf PDF
W50S9824B0003P0001.pdf PDF
134th Repair Bldg 120 Exterior_Drawings_04.19.24.pdf PDF
W50S98-24-B0003pdf.pdf PDF
W50S98-24-B0003.pdf PDF
Construction SOW PSXE242014 Repair Electrical Systems Basewide 1.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PSXE242014

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Added clauses 52.211-12 and 52.211-13 in section 00 70 00.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Aug-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S9824B0003

X 9B. DATED (SEE ITEM 11)

05-Aug-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Aug-2024

CODE

USPFO TN 134 MISSION SUPPORT CONTRACTING

123 BRISCOE DRIVE

MCGHEE TYSON ANG BASE TN 37777-6227

W50S98 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W50S9824B0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following have been added by reference:

52.211-13 Time Extensions SEP 2000

The following have been added by full text:

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $847.52 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .