This document package includes drawings, specifications, and a solicitation for the B134 Renovation project. The solicitation seeks fixed-price bids for renovations to Building 134 at McGhee Tyson Air National Guard Base to include finishes, fixtures, mechanical and electrical system upgrades. Bids are due by February 15, 2024 with award anticipated by March 31, 2024. The work must be substantially complete within 365 calendar days of award. The estimated construction cost is between $5-10 million. The solicitation is issued by the Tennessee Army National Guard and seeks licensed contractors to provide all labor, materials, equipment and supervision for the renovations in accordance with the drawings and specifications presented.

View the file

Other files for this federal contract opportunity

Other files attached to Solicitation B134 Renovation, newest first.
File Type Posted
OF 1419 Abstract.pdf PDF
Bid Opening Sign In Sheet.pdf PDF
B134 Original Design Drawings.pdf PDF
Repair B134 Spec - 28 10 05.pdf PDF
W50S98-24-B-00010001 Conformed Copy.pdf PDF
Building 134 Flow Test Report.pdf PDF
W50S98-24-B-00010001.pdf PDF
Site Visit W50S98-24-B-0001 24 Jan 24.pdf PDF
Site-Visit Minutes B134.pdf PDF
Pre-Bid Slides B134.pptx PPTX presentation
Repair B134 - Type B-3 - Specifications (Div 10-33).pdf PDF
Repair B134 - Type B-3 - Specifications (Div 01-09).pdf PDF
Repair B134 - Type B-3 - Drawings.pdf PDF
W50S98-24-B-0001 B134.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROOM FINISH SCHEDULE REMARKS

1. SEE INTERIOR ELEVATIONS FOR EXTENT OF WOOD VENEER WALL PANELS.

2. PAINT " GREEN SCREEN" WALL PT5 AS SHOWN ON FINISH FLOOR PLAN.

3. PROVIDE BACKSPLASH TILE (WT2) ON WALL BETWEEN THE COUNTERTOP BACKSPLASH AND

THE WALL CABINETS, INCLUDING BEHIND THE MICROWAVE SHELVES. REFER TO INTERIOR

ELEVATIONS.

4. PROVIDE PROFILED WALL BASE (B2) ON ALL VENEER WALLS IN THIS AREA, PROVIDE TILE

WALL BASE (B3) ON ALL PAINTED WALLS IN THIS AREA.

5. INSTALL (HDW1) ON ALL MILLWORK AT THIS LOCATION

6. PROVIDE 3/4" PT PLYWOOD PANELS ON THE WALLS AS REQUIRED FOR COMM EQUIPMENT.

FINISH LEGEND GENERAL NOTES:

A. THE USE OF MANUFACTURER, NAME AND BRAND IN THIS LEGEND IS TO ESTABLISH

QUALITY, COLOR, TEXTURE AND SIZE AS A BASIS OF DESIGN. BRAND NAMES, COLORS AND

CODE NUMBERS ARE LISTED FOR REFERENCE. PRODUCT FROM OTHER MANUFACTURERS

WITH COMPATIBLE QUALITY AND COLOR ARE ACCEPTABLE AND SHALL BE SUBMITTED FOR

APPROVAL. COLORS SHALL COMPLY WITH ARCHITECTURAL GUIDELINES.

B. INTERIOR PAINT SELECTIONS APPLY TO ALL WALL SURFACES INCLUDING REVEALS,

VERTICAL FURRED SPACES, GRILLES, DIFFUSERS, ELECTRICAL AND ACCESS PANELS,

PIPING AND CONDUIT ADJACENT TO WALL SPACES UNLESS OTHERWISE NOTED. THESE ARE

TO BE PAINTED TO MATCH ADJCAENT WALL SURFACES UNLESS THEY ARE ALREADY

COLOR-MATCHED.

C. CEILING PAINT SELECTIONS APPLY TO CEILING SURFACES INCLUDING BOTH HORIZONTAL

AND VERTICAL SURACES OF SOFFITS, FURRED DOWN AREAS, GRILLES, DIFFUSERS,

REGISTERS AND ACCESS PANELS EXCEPT FOR EXISTING SURFACES THAT ARE ALREADY

PAINTED. CEILING COLOR APPLIES TO JOISTS, UNDERSIDE OF ROOF DECK ARE EXPOSED

AND NO OTHER CEILING PROVDED.

D. WHERE FLOOR FINISH CHANGES BETWEEN ROOMS, PROVIDE THE TRANSITION AT THE

CENTERLINE OF THE DOOR WHEN IN CLOSED POSITION, UNLESS OTHERWISE NOTED.

E. REFER TO ARCHITECTURAL DRAWINGS FOR EXTERIOR MATERIAL AND FINISH SELECTIONS.

F. ALL WINDOW SILLS SHALL BE QUARTZ (QZ2).

G. CODES IN COLOR COLUMN REFER TO COLORS LISTED ON THIS DRAWING.

H. ALL PORCELAIN AND CERAMIC GROUT SHALL BE EPOXY.

I. REFER TO INTERIOR ELEVATIONS FOR WALL TILE PATTERNS AND LOCATIONS.

J. INTERIOR METAL DOORS AND FRAMES TO BE PAINTED TO MATCH ADJACENT WALL BASE.

K. REFER TO ARCHITECTURAL DRAWINGS FOR WINDOW AND TRIM FINISHES.

L. REFER TO FINISH FLOOR PLAN FOR FLOOR FINISH LOCATIONS.

M. PROVIDE MANUAL OPERATED WINDOW SHADES (RS1), AT ALL EXTERIOR WINDOWS.

N. ALL QUARTZ COUNTERTOPS TO RECEIVE 4"H BACK AND SIDE SPLASHES AS APPLICABLE.

REFER TO INTERIOR ELEVATIONS FOR FINISH SPECIFICATIONS.

O. REFER TO SHEET I-600 & I-601 FOR SIGNAGE PLAN & DETAILS.

P. PROVIDE RESINOUS FLOOR COATINGS OVER ENTIRE CONCRETE FLOOR SLAB PER SPEC

SECTION 09 67 23.13 IN AREA AS INDICATED ON ENLARGED FINISH FLOOR PLAN.

ABBREVIATION LEGEND

LUXURY VINYL TILE

TERRAZZO

CARPET TILE

FLOOR TILE

WALLBASE

PAINT

WALL TILE

ACOUSTIC CEILING TILE

ACOUSTIC WOOD CEILING

EXPOSED CEILING / STRUCTURE

GYSPUM WALL BOARD

WALK-OFF MAT

LVT

TR

CPT

FT

B

PT

WT

ACT

AWC

EXP

GWB

WOM

METAL SOFFIT PANELS

CORNER GUARD

CABINET HARDWARE

METAL LOCKER

METAL

CG

HDW

LK

SINGLE ROLLER SHADERS

FOLDING PARTITION

TOILET PARTITIONS

WOOD STAIN

SK

TP

WS

QUARTZQZ

EPOXYEP

VINYL FILMVF

C H

M

H

IL

L

A L

L R

IG

H

T S

R E

S E

R V

E D c

T H

IS

D

O C

U M

E N

T

A N

D T

H E

I D

E A

S A

N D

D E

S

IG

N S

I N

C O

R P

O R

A T

E D

H E

R E

IN

A S

A N

I N

S T

R U

M E

N T

O F

P R

O F

E S

S

IO

N A

L S

E R

V

IC

E

IS

T

H E

P R

O P

E R

T Y

O

F C

H

M H

IL

L

A N

D I

S N

O T

T O

B E

U S

E D

IN

W H

O L

E O

R I

N P

A R

T

F O

R A

N Y

O T

H E

R P

R O

J E

C T

W

IT

H O

U T

T H

E W

R

IT

T E

N A

U T

H O

R

IZ

A T

IO

N

O

C

H

M H

IL

L

R E

U S

E O

F D

O C

U M

E N

T S

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0

VERIFY SCALE

DATE

PROJ

DWG

D S

G N

D R

C H

K A

P V

D

A P

V D

B Y

R E

V

IS

IO

N

D A

T E

N O

FILENAME: PLOT DATE/TIME:

A

1 2 3 4 5 6

B

C

D

S

O U

T H

J A

M A

IC

A

E N

G L E

W O

O D

C

O

T E

L E

(3

-0

A

X

(7

-9

4th

A

IR

R E

EL

IN

G W

IN

G

FU

C H

M

H

IL

L

H D

R J

V

R E

P A

IR

B

U

IL

D

IN

G

M c G

H E

E T

Y S

O N

A N

G

P S

X E

T E

N N

E S

S E

E A

IR

N

A T

IO

N

A L G

U A

R D

M c G

H E

E T

Y S

O N

A

IR

P O

R T

A

L C

O A

T N

As indicated

BIM 360://US TN-D3167700-TANG-MCGHEE TYSON B134/D3167700_B134_AR.rvt 4/5/2023 4:56:50 PM

T Y

P E

B -3

F

IN

A L

MARCH 2023

D3167700

A-610

A S

H A

N N

O N

S

IN

G L

E D

P

E A

R S

O N

D P

E A

R S

O N

R O

O M

F

IN

IS

H

S C

H E

D U

L E

A R

C H

IT

E

C T

U R

A L

FINISH LEGEND

ITEM CODE DESCRIPTION MANUFACTURER MODEL COLOR SIZE NOTES

FLOORING

CPT1 OVERALL CARPET TILE INTERFACE HAPPENING / CHENILLE WARP RETROSPECTIVE #3677 20" x 20" INSTALLATION METHOD: BRICK

CPT2 PRIVATE OFFICE CARPET INTERFACE TANGLED & TAUT ONYX/RIB #106815 9" x 39" (PLANK STYLE) INSTALLATION METHOD: ASHLAR

EP1 EPOXY STONHARD TM CHARCOAL

FT1 PORCELAIN TILE (FIELD) CROSSVILLE USA SHADES MIST #AV244 24" X 36" FINISH: HONED, GROUT JOINT: 1/8", EPOXY GROUT

COLOR: MAPEI "SILVER" #27

FT2 PORCELAIN TILE (ACCENT) CROSSVILLE USA SHADES FROST #AV241 24" X 24" FINISH: HONED, GROUT JOINT: 1/8", EPOXY GROUT

COLOR: MAPEI "FROST" #77

FT3 PORCELAIN TILE (ACCENT) CROSSVILLE USA SHADES THUNDER #AV248 12" X 24" FINISH: HONED, GROUT JOINT: 1/8", EPOXY GROUT

COLOR: MAPEI "IRON" #107

FT4 MOSAIC FLOOR TILE CROSSVILLE USA COLOR BLOX MOSAICS I SEE THE MOON #A1117 3" X 3" FINISH: UNPOLISHED, GROUT JOINT: 1/8", EPOXY GROUT

COLOR: MAPEI "CHARCOAL" #47

LVT1 LUXURY VINYL TILE SHAW CONTRACT SOUNDSCAPE #4063V ALMOND #63703 6" X 48" INSTALLATION METHOD: STAGGER

TR1 TERRAZZO TERROXY RESIN SYSTEMS TERRAZZO & MARBLE TM #20-1954 REFER TO KEYNOTES ON ENLARGED FINISH FLOOR

PLAN FOR DIVIDER STRIP SIZES

TR2 TERRAZZO TERROXY RESIN SYSTEMS TERRAZZO & MARBLE TM #20-2004 REFER TO KEYNOTES ON ENLARGED FINISH FLOOR

PLAN FOR DIVIDER STRIP SIZES

TR3 TERRAZZO TERROXY RESIN SYSTEMS TERRAZZO & MARBLE #TMCD1624 REFER TO KEYNOTES ON ENLARGED FINISH FLOOR

PLAN FOR DIVIDER STRIP SIZES

TR4 TERRAZZO TERROXY RESIN SYSTEMS TERRAZZO & MARBLE #TMCD1625 REFER TO KEYNOTES ON ENLARGED FINISH FLOOR

PLAN FOR DIVIDER STRIP SIZES

WOM1 WALK-OFF MAT J+J INVISION ALTER EGO #7070 OPERATIVE #1837 24" X 24" INSTALLATION METHOD: MONOLITHIC

BASE

B1 WALL BASE WITH TOE ROPPE 700 SERIES CHARCOAL #123 4"H USE 100'-0"L ROLL GOODS TO MINIMIZE SEAMS

B2 PROFILED WALL BASE SYSTEM ROPPE NOBILITY #55 CHARCOAL #123 6"H USE MAXIMUM RUN AVAILABLE TO MINIMIZE SEAMS

B3 TILE WALL BASE CROSSVILLE USA SHADES MIST #AV244 6" X 24" FINISH: HONED, GROUT JOINT: 1/8", EPOXY GROUT

COLOR: MAPEI "SILVER" #27. ALIGN GROUT JOINTS W/

FLOOR TILE, PROVIDE CONTINUOUS TRIM PIECE AT TOP

OF TILE BASE FOR FINISHED LOOK

B4 WALL BASE WITH TOE ROPPE 700 SERIES BLACK #100 4"H USE 100'-0"L ROLL GOODS TO MINIMIZE SEAMS

WALLS

PT1 PAINT SHERWIN WILLIAMS PASSIVE #SW7064 / 236-C1 FINISH: SATIN

PT2 PAINT SHERWIN WILLIAMS INTELLECTUAL GRAY #SW7045 /

245-C3

FINISH: SATIN

PT3 PAINT SHERWIN WILLIAMS ATTITUDE GRAY #SW7060 /

237-C5

FINISH: SATIN

PT4 PAINT SHERWIN WILLIAMS WEB GRAY #SW7075 / 235-C6 FINISH: SATIN

PT5 GREEN SCREEN PAINT COLOR MATCH RGB COLOR VALUE 0, 177, 64 FINISH: SATIN

WT1 PORCELAIN TILE CROSSVILLE USA SHADES MIST #AV244 12" X 24" FINISH: HONED, GROUT JOINT: 1/8", EPOXY GROUT

COLOR: MAPEI "SILVER" #27

WT2 BACKSPLASH TILE DALTILE UNIFORM MOSAICS DARK GREY #UC15 3D CUBE EPOXY GROUT COLOR: MAPEI "IRON" #107

CEILINGS

ACT1 ACOUSTIC CEILING TILE ARMSTRONG CEILINGS CERAMAGUARD 605 WHITE 24" X 48" 15/16" SQUARE LAY-IN

ACT2 ACOUSTIC CEILING TILE ARMSTRONG CEILINGS ULTIMA WHITE 24" X 24" 9/16" BEVELED TEGULAR

AWC1 ACOUSTIC WOOD CEILING ARMSTRONG CEILINGS WOODWORKS CHANNELED TEGULAR MATCH WV2 24" X 24" PERFORATION: W9, 9/16" SQUARE TEGULAR IN COLOR

BLACK

EXP EXPOSED CEILING / STRUCTURE SHERWIN WILLIAMS TRICORN BLACK #SW6258 /

251-C1

EXPOSED STRUCTURE TO BE CLEANED & PAINTED,

FINISH: SATIN

GWB GYPSUM WALL BOARD SHERWIN WILLIAMS CEILING BRIGHT WHITE #SW7007

/ 257-C2

FINISH: SATIN, REFER TO REFLECTED CEILING PLAN

METAL METAL SOFFIT PANELS CHARCOAL TO MATCH ROOF & VERTICAL PANELS

MISCELLANEOUS

CG1 CORNER GUARD ROCKWOOD MANUFACTURING STAINLESS STEEL CORNER GUARD CLEAR STAINLESS #3TFN7 2 1/2" X 2 1/2" X 48"H INSTALL ON ALL GYP. BD. OUTSIDE CORNERS

HDW1 CABINET HARDWARE HICKORY HARDWARE SKYLIGHT CABINET PULL #HH075328-SS STAINLESS STEEL TO BE INSTALLED ON ALL MILLWORK

LK1 METAL LOCKER LYON LOCKERS DOUBLE TIER LOCKER DOVE GREY "DD" 18"W X 18"D X 72"H REFER TO SPECIFICATIONS FOR MORE INFO

QZ1 QUARTZ CAMBRIA LUXURY SERIES SKARA BRAE EDGE PROFILE: 1/8" EASED, PROVIDE SEALANT BETWEEN

COUNTERTOP & BACKSPLASH. REFER TO DETAILS FOR

MORE INFORMATION

QZ2 QUARTZ CAMBRIA MARBLE COLLECTION NEWPORT EDGE PROFILE: 1/8" EASED, PROVIDE SEALANT BETWEEN

COUNTERTOP & BACKSPLASH. REFER TO DETAILS FOR

MORE INFORMATION

RS1 SINGLE ROLLER SHADE MECHOSHADE ECOVEIL #1550 SERIES, 3% OPENNESS SHADOW GREY #1570 PROVIDE A MINIMUM R16 CLUTCH & 1.5" DIAMETER TUBE, INCLUDE PRE-FINISHED FACSIA/HOUSING TO MATCH

ADJ. WINDOW FRAME, BREAK AT MULLIONS. INSTALL AT

ALL EXTERIOR WINDOW LOCATIONS

SK1 FOLDING PARTITION SKYFOLD ZENITH SERIES CARNGEIE, XOREL, "LINEN" #6291,

COLOR: #9

PROVIDE MARKERBOARD PANELS IN CENTER PANELS AS

SHOWN IN ELEVATION

TP1 TOILET PARTITIONS BRADLEY CORP. SOLID PHENOLIC CORE PARTITIONS FORMICA "SARUM TWILL" #8827-58

VF1 VINYL FILM 3M FASARA CLOUD DUAL GRADIENT

SH2FGCL

CENTER OF GRADIENT TO BE MOUNTED AT 5'-0"H AFF

WS1 WOOD STAIN SHERWIN WILLIAMS MINWAX PERFORMANCE SERIES TINTABLE WOOD

STAIN

WILLOWBEND #MW-431

WS2 WOOD STAIN SHERWIN WILLIAMS MINWAX PERFORMANCE SERIES TINTABLE WOOD

STAIN

MATCH STAIN TO NATIONAL WALLCOVERING WALNUT

#RWV-3042. NATURAL FLAT CUT

WS3 WOOD STAIN SHERWIN WILLIAMS MINWAX PERFORMANCE SERIES TINTABLE WOOD

STAIN

MATCH STAIN TO NATIONAL WALLCOVERING AMERICAN

CHERRY #RWV-3028. NATURAL, FLAT CUT

ROOM FINISH SCHEDULE

ROOM

NUMBER ROOM NAME FLOOR FINISH WALL BASE WALL FINISHES ACCENT WALL CEILING FINISH CABINETS COUNTERTOP REMARKS

101 VESTIBULE WOM1 B4 PT1 - GWB

102 FOYER TR1 - TR4 B2/B3 PT1/WV1/WV2 - GWB ROOM FINISH SCHEDULE REMARK #1

103 RETENTION OFFICE CPT1 B1 PT1 PT3 ACT2

104 SAFETY CPT1 B1 PT1 PT3 ACT2

105 COMMANDER'S

EXECUTIVE

CPT2 B2 PT1 PT4 ACT2

106 COMMAND CHIEF CPT2 B2 PT1 PT4 ACT2

107 WING

COMMANDER

SUPPORT

CPT1/LVT1 B2 PT1 PT4 ACT2

108 STORAGE CPT1 B1 PT1 - ACT2

109 COLLABORATION CPT1 B2 PT1 PT4 ACT2

110 OFFICE CPT2 B2 PT1 PT4 ACT2

111 WING

COMMANDER

CPT2 B2 PT1 PT4 ACT2

112 TLT FT1/FT4 WT1 PT1/WT1 - GWB WV3 QZ1 ROOM FINISH SCHEDULE REMARK #5

113 CLOSET FT1 B3 PT1 - GWB

114 SUPPLIES CPT1 B1 PT1 - ACT2

115 CORRIDOR LVT1 B2 PT1 PT4 ACT2 WV3 QZ1 ROOM FINISH SCHEDULE REMARK #3 & #5

116 VICE WING

COMMANDER

CPT2 B2 PT1 PT4 ACT2

118 FINANCE STORAGE CPT1 B1 PT1 - ACT2

119 FINANCE OFFICE CPT2 B1 PT1 PT3 ACT2

120 FINANCE OFFICE CPT2 B1 PT1 PT3 ACT2

121 FINANCE OFFICE CPT2 B1 PT1 PT3 ACT2

122 FINANCE CPT1 B1 PT1 PT3 ACT2

123 ELECTRICAL EP1 B4 PT1 - ACT2

124 FINANCE TRANSACTION CPT1 B1 PT1 - ACT2

125 FINANCE WAITING CPT1 B2 PT1 PT3 ACT2 QZ2

126 IG OPEN OFFICE CPT1 B1 PT1 PT3 ACT2

127 IG OFFICE CPT2 B1 PT1 PT3 ACT2

128 IG OFFICE CPT2 B1 PT1 PT3 ACT2

129 BREAK ROOM FT1 B3 PT1 - GWB/ACT2 WV3 QZ2 ROOM FINISH SCHEDULE REMARK #3 & #5

130 ENTRANCE WOM1 B4 PT1 - GWB

131 CORRIDOR FT1 B3 PT1 - GWB/ACT2

132 CHAPLAINS CPT1 B1 PT1 PT3 ACT2

133 EXECUTIVE OFFICER CPT2 B1 PT1 PT3 ACT2

134 CORRIDOR CPT1 B1 PT1 - ACT2

135 EO OPEN OFFICE CPT1 B1 PT1 PT3 ACT2

136 EO OFFICE CPT2 B1 PT1 PT3 ACT2

137 MEETING CPT1 B1 PT1 PT3 ACT2

138 WAITING CPT1 B1 PT1 PT3 ACT2

139 WING CHAPLAIN CPT2 B1 PT1 PT3 ACT2

140 JAG OPEN OFFICE CPT1 B1 PT1 - GWB/ACT2

141 JAG OFFICE CPT2 B1 PT1 PT3 ACT2

142 JAG OFFICE CPT2 B1 PT1 PT3 GWB/ACT2

143 CORRIDOR CPT1 B1 PT1 - ACT2

144 SARC CPT2 B1 PT1 PT3 GWB/ACT2

145 STORAGE CPT1 B1 PT1 - ACT2

146 CONFERENCE ROOM CPT1 B2 PT2 WV2 GWB/ACT2 ROOM FINISH SCHEDULE REMARK #1

147 SIPR CPT1 B4 PT1 - ACT2

148 CSS CPT1 B2 PT1 - GWB/ACT2

149 DISPLAY FT1 B2 PT1 - AWC1

150 HALL FT1 B2/B3 PT1 - GWB ROOM FINISH SCHEDULE REMARK #4

151 CONF. / TRAINING CPT1 B2 PT2 WV2 GWB/ACT2 ROOM FINISH SCHEDULE REMARK #1

152 TABLE/CHAIR STORAGE CPT1 B1 PT1 - ACT2

153 VEST WOM1 B4 PT1 - GWB

154 COMM EP1 B4 PT1 - EXP ROOM FINISH SCHEDULE REMARK #6

155 JAN EP1 B4 PT1 - ACT2

156 MEN'S TLT FT1-FT3 WT1 WT1 WT2 ACT1 WV3 QZ1

157 MEN'S SHOWER FT1-FT3/FT4 WT1 WT1 WT2 GWB WV3 QZ1

158 WOMEN'S SHOWER FT1-FT3/FT4 WT1 WT1 WT2 GWB WV3 QZ1

159 WOMEN'S TLT FT1-FT3 WT1 WT1 WT2 ACT1 WV3 QZ1

160 CORRIDOR FT1 B3 PT1 - ACT2

161 FSS OPEN OFFICE CPT1 B1 PT1 PT3 ACT2

162 HRO CPT2 B1 PT1 PT3 ACT2

163 SUPERINTENDENT CPT2 B1 PT1 PT3 ACT2

164 M.P.F. COMMANDER CPT2 B1 PT1 PT3 ACT2

165 CHIEF CPT2 B1 PT1 PT3 ACT2

166 BETM CPT2 B1 PT1 PT3 ACT2

167 TESTING CPT1 B1 PT1 - ACT2

168 PSM CPT2 B1 PT1 PT3 ACT2

169 TRAINING CPT1/LVT1 B1 PT1 PT3 GWB/ACT2 WV3 QZ2 ROOM FINISH SCHEDULE REMARK #3 & #5

170 STORAGE CPT1 B4 PT1 - ACT2

171 I.P.R. OFFICE / SIPR CPT2 B1 PT1 PT3 ACT2

172 CORRIDOR CPT1 B1 PT1 - ACT2

173 CORRIDOR FT1 B3 PT1 - ACT2

174 RECRUITING CPT2 B1 PT1 PT3 ACT2

175 RECRUITING CPT2 B1 PT1 PT3 ACT2

176 RECRUITING CPT2 B1 PT1 PT3 ACT2

177 RECRUITING CPT2 B1 PT1 PT3 ACT2

178 TRANSACTION FT1 B3 PT1 - ACT2

179 WAITING CPT1/FT1 B3 PT1 PT3 ACT2 QZ1

180 VESTIBULE WOM1 B4 PT1 - GWB

181 TLT FT1 WT1 WT1 WT2 GWB WV3 QZ2

182 STORAGE CPT1 B4 PT1 - ACT2

183 PASS & ID CPT2 B1 PT1 PT3 ACT2

184 RECRUITING CPT2 B1 PT1 PT3 ACT2

185 COMM EP1 B4 PT1 - ACT2 ROOM FINISH SCHEDULE REMARK #6

186 PA OPEN OFFICE CPT1 B1 PT1 PT3 ACT2

187 HISTORICAL CPT1 B1 PT1 - ACT2

188 PA STORAGE CPT1 B4 PT1 - ACT2

189 PA OFFICE CPT1 B1 PT1 PT3 GWB/ACT2

190 PA STUDIO CPT1 B4 PT1 PT5 ACT2 ROOM FINISH SCHEDULE REMARK #2

191 SOUND BOOTH CPT1 B4 PT1 - ACT2

192 MECHANICAL EP1 B4 PT1 - PAINT

193 ELECTRICAL EP1 B4 PT1 - PAINT

VESTIBULE

FOYER

RETENTION

OFFICE

COMMANDER'S

EXECUTIVE

COMMAND

CHIEF

OFFICE

WING

COMMANDER

CORRIDOR

STORAGE

VICE WING

COMMANDER

SAFETY

FINANCE

WAITING

FINANCE

TRANSACTION

FINANCE

STORAGE

FINANCE

FINANCE

OFFICE

FINANCE

OFFICE

FINANCE

OFFICE

IG OFFICE

IG OPEN

OFFICE

IG OFFICE

BREAK

ROOM

CONFERENCE

ROOM

CONF. /

TRAINING

SIPR

CSS

DISPLAY

VEST

JAN

COMM

HALL

WOMEN'S

TLT

WOMEN'S

SHOWER

MEN'S TLT

MEN'S

SHOWER

HISTORICAL

COMM

PA STUDIO

ELECTRICAL

MECHANICAL

CORRIDOR

TLT

STORAGE

WAITING

RECRUITING

TRANSACTION

RECRUITING

PASS & ID

RECRUITING

RECRUITING

I.P.R.

OFFICE /

SIPR

C O

R R

ID

O

R

STORAGE

SUPERINTENDENT

BETM

CHIEF

M.P.F.

COMMANDER

FSS OPEN

OFFICE

ELECTRICAL

HRO

PSM

TESTING

RECRUITING

TRAINING

SUPPLIES

TLT

TABLE/CHAIR

STORAGE

SARC

EO OFFICE

MEETING

JAG OFFICE

JAG OPEN

OFFICE

JAG OFFICE

CHAPLAINS

WING

CHAPLAIN

STORAGE

EO OPEN

OFFICE

WAITING

CLOSET

PA OFFICE

PA

STORAGE

ENTRANCE

SOUND

BOOTH

EXECUTIVE

OFFICER

D4

I-101

WING

COMMANDER

SUPPORT

EQ

EQ

EQ

EQ

EQ EQ

PT3

PT4

PT4

PT4

PT4

PT

PT

PT

PT

PT4

PT

PT3

PT3 PT3

PT3

PT3

PT3

PT3

PT3

PT

PT

PT3

PT

PT3

PT3

PT3

PT3

PT3

PT3

PT3

PT3

PT

PT

PT3

PT3

PT3

PT

PT

PT

PT

PT

PT

4' -0

'-0

12'-0" 3'-4"

PT

PT

PT3

PA OPEN

OFFICE

CORRIDOR

CORRIDOR

CORRIDOR

4' -6

ALIGN

A1

A2

C3

A2

A2

A2

A2

A2

A2

A2

A2

A2

A2 A2

A2

A2

A1

A1

A1

A2

A2A2

A2

A2A2

C3

C3

C3 C3

C3

C3

A2

C3 C3

A3

A2

A2

C4

B4

B4

A4

A3

A4

A4

FLOOR LEGEND

FLOOR TILE (FT1)

FLOOR TILE (FT2)

FLOOR TILE (FT3)

CARPET TILE (CPT1)

CARPET TILE (CPT2)

TERRAZZO (TR1)

TERRAZZO (TR2)

TERRAZZO (TR3)

TERRAZZO (TR4)

LUXURY VINYL TILE (LVT1)

EPOXY (EP1)

WALK-OFF MAT (WOM1)

FLOOR TILE, SHOWERS (FT4)

FINISH PLAN GENERAL NOTES:

A. WHERE COLOR IS SHOWN AS BEING SPECIFIC TO ONE MANUFACTURER, AN EQUIVALENT

COLOR BY ANOTHER MANUFACTURER MAY BE SUBMITTED FOR APPROVAL.

MANUFACTURERS AND MATERIALS SPECIFIED ARE NOT INTENDED TO LIMIT THE SELECTION

OF EQUAL COLORS FROM OTHER MANUFACTURER. THE WORD "COLOR AS USED HEREIN

INCLUDES SURFACE COLOR PATTERN.

B. REFER TO ROOM FINISH SCHEDULE ON SHEET A-610 FOR FINISH SELECTIONS IN EACH

ROOM.

C. REFER TO THE COLOR AND MATERIALS LEGEND ON SHEET A-610 FOR FINISH

ABBREVIATIONS AND SPECIFICATIONS.

D. HATCHING IS INTENDED TO ILLUSTRATE FLOOR MATERIAL ONLY. FOR FLOOR PATTERNS

SEE ENLARGED PLANS WHERE INDICATED.

E. FLOOR MATERIAL/FINISHES AS SPECIFIED FOR EACH AREA MUST EXTEND UNDERNEATH ALL

EQUIPMENT, UNLESS OTHERWISE NOTED.

F. WHERE FLOOR FINISH CHANGES BETWEEN ROOMS, PROVIDE THE TRANSITION AT THE

CENTERLINE OF THE DOOR WHEN IN CLOSED POSITION, UNLESS OTHERWISE NOTED.

G. ALL VERTICAL SURFACES TO RECEIVE W ALL BASE UNLESS OTHERWISE NOTED.

H. ACCENT PAINT COLOR SHALL RUN CORNER TO CORNER AND FLOOR TO CEILING, UNLESS

OTHERW ISE NOTED.

I. ALL DIMENSIONS SHALL EXTEND FROM FINISH FACE OF WALL, UNLESS OTHERWISE NOTED.

J. FINISH MATERIALS SPECIFIED SHALL BE INSTALLED PER MANUFACTURER'S GUIDELINES,

UTILIZING MANUFACTURER'S RECOMMENDED INSTALLATION PRODUCTS.

K. PAINT ALL EXPOSED SURFACES. BOTH HORIZONTAL AND VERTICAL PLANES OF GYPSUM

BOARD SOFFITS TO MATCH ADJ. WALL SURFACE UNLESS OTHERWISE NOTED.

L. PAINT EXPOSED CONDUIT, PIPING, DEVICES ETC. ON VERTICAL SRFACES TO BE PAINTED TO

MATCH ADJACENT WALL FINISH. ALL EXPOSED ITEMS SUCH AS, BUT NOT LIMITED TO,

INTERIOR GRILLES, REGISTERS, DIFFUSERS, ACCESS PANELS ETC WILL BE PREFINISHED

AND WILL MATCH ADJACENT WALL FINISH, UNLESS OTHERWISE NOTED.

M. ALL EXISTING WALLS TO REMAIN SHALL BE REPAIRED, PATCHED AND SMOOTHED TO

MATCH ADJACENT NEW WALLS AND FINISHED AS SCHEDULED.

N. INTERIOR METAL DOORS AND FRAMES TO BE PAINTED TO MATCH ADJACENT WALL BASE.

O. ALL WALLS AND EXPOSED GYPSUM BOARD SURFACES TO BE PAINTED PT1, UNLESS

OTHERW ISE NOTED.

FINISH FLOOR PLAN SYMBOLS LEGEND

ACCENT WALL PAINTPT#

CENTERLINE

FINISH TO ALIGN W ITH

ADJACENT WALL

ALIGN

DIMENSION

X1 SIGNAGE TAG

X'-X"

MATCHLINE

A# FLOOR TRANSITION. REFERENCE SHEET A-606

C H

2M H

IL

L

AL

L R

IG

H

TS

R

ES

ER

VE

D c

TH

IS

D O

C U

M E

N T, A N

D T

H E

ID

E

AS

A

N D

D E

SI

G

N S

IN

C

O R

P O

R

AT

E D

H

ER

EI

N

, A S

AN

IN

ST

R

U M

EN

T

O F

PR

O

FE

S

SI

O

N

AL

S

ER

VI

C

E, IS

T H

E P

R O

PE

R

TY

O

F C

H 2M

H

IL

L

AN

D

IS

N O

T

TO

B E

U S

ED

, I

N W

H O

LE

O

R

IN

P

AR

T, F

O R

A N

Y O

TH

ER

P R

O

JE

C T

W

IT

H O

U T

TH

E

W R

IT

TE

N A

U

TH

O R

IZ

AT

IO

N

O F

C H

2M H

IL

L.

R

EU

SE

O

F D

O C

U M

E N

TS

BAR IS ONE INCH ON

ORIGINAL DRAW ING.

1"0

VERIFY SCALE

DATE

PROJ

DWG

D

SG

N D

R C

H K

AP

VD

AP

VD

BY

R

EV

IS

IO

N

D

AT

E N

O

FILENAME: PLOT DATE/TIME:

A

1 2 3 4 5 6

B

C

D

S O

U

TH

J

AM

AI

C

A

EN

G

LE

W O

O D

, C O

TE

LE

3)

-0

F

AX

0)

-9 th

AIR

RE

ELI

NGWING

FU

CH

2M

H

ILL

HD

R

JV

R

EP

A

IR

B U

IL

D

IN

G

M cG

H

EE

T

YS

O N

A N

G

PS

XE

TE

N N

ES

SE

E A

IR

N

AT

IO

N

AL

G U

AR

D

M cG

H E

E

TY

SO

N

A

IR

PO

R

T, A

LC

O

A

TN

As indicated

BIM 360://US TN-D3167700-TANG-MCGHEE TYSON B134/D3167700_B134_AR.rvt 4/5/2023 2:08:58 PM

TY

PE

B -3

F

IN

AL

MARCH 2023

D3167700

I-101

B.

ER

N

ST

IN

G

S.

AK

IN

S

D . P

EA

R

SO

N

D . P

EA

R

SO

N

FI

N

IS

H

P

LA

N

IN

TE

R

IO

R

S

SHEET KEYNOTES

1/8" = 1'-0"D1 FLOOR PLAN - FINISH PLAN

1/4" = 1'-0"D4 ENLARGED FINISH PLAN

1 PROVIDE 1/4" THICK TERRAZZO DIVIDER STRIP AT THIS LOCATION. ALL OTHER

TERRAZZO DIVIDER STRIPS TO BE 1/8" THICK UNLESS OTHERWISE NOTED. ALL

DIVIDER STRIPS TO BE ZINC

8 0 8

Scale: 1/8 INCH = 1 FOOT

4 0 4 8

Scale: 1/4 INCH = 1 FOOT

TYPE B-3 - DRAWINGS
G-002 - INDEX OF DRAWINGS AND LOCATION MAP
CIVIL
V-101 - EXISTING CONDITIONS SURVEY
CD101 - DEMOLITION PLAN
C-101 - SITE LAYOUT PLAN
C-102 - GRADING AND DRAINAGE PLAN
C-501 - SITE DETAILS
C-502 - SITE DETAILS
C-503 - SITE DETAILS
C-504 - SITE DETAILS
STRUCTURAL
S-001 - GENERAL NOTES
S-002 - GENERAL NOTES & ABBREVIATIONS
SD100 - OVERALL DEMO PLAN
SD101 - WALL DEMO ELEVATION
S-100 - OVERALL FIRST FLOOR PLAN
S-110 - OVERALL ROOF FRAMING PLAN
S-301 - ROOF FRAMING SECTIONS
S-302 - ROOF FRAMING SECTIONS
S-401 - ENLARGED PLANS AND DETAILS
S-402 - ENLARGED PLAN, SECTION AND DETAIL
S-501 - SECTIONS AND DETAILS
S-502 - SECTIONS AND DETAILS
S-503 - SECTIONS AND DETAILS
S-505 - SECTIONS AND DETAILS
S-510 - SECTIONS AND DETAILS
ARCHITECTURAL
A-001 - LEGENDS AND ABBREVIATIONS
A-002 - MOUNTING HEIGHTS
A-003 - WALL TYPES
AL101 - LIFE SAFETY PLAN
AL102 - CODE ANALYSIS
AD101 - DEMOLITION FLOOR PLAN
AD102 - DEMOLITION ROOF PLAN
A-101 - DIMENSION FLOOR PLAN
A-102 - TAGGED FLOOR PLAN
A-103 - REFLECTED CEILING PLAN
A-104 - ROOF PLAN
A-201 - EXTERIOR ELEVATIONS
A-301 - BUIDING SECTIONS
A-302 - BUIDING SECTIONS
A-310 - WALL SECTIONS
A-311 - WALL SECTIONS AND DETAILS
A-312 - PARTIAL BUILDING SECTIONS
A-313 - WALL SECTIONS AND DETAILS
A-314 - WALL SECTIONS AND DETAILS
A-401 - ENLARGED PLANS
A-402 - ENLARGED PLANS
A-501 - WINDOW DETAILS
A-510 - ROOF DETAILS
A-511 - ROOF DETAILS
A-520 - PLAN DETAILS
A-521 - PLAN AND CEILING DETAILS
A-550 - GROUND MOUNTED BUILDING SIGN
A-601 - DOOR SCHEDULE AND DETAILS
A-602 - EXTERIOR AND INTERIOR WINDOW ELEVATIONS
A-603 - INTERIOR ELEVATIONS
A-604 - INTERIOR ELEVATIONS
A-605 - INTERIOR ELEVATIONS
A-606 - INTERIOR SECTIONS AND DETIALS
A-610 - ROOM FINISH SCHEDULE
INTERIORS
I-101 - FINISH PLAN
I-102 - FURNITURE PLAN
I-103 - FURNITURE PLAN
I-104 - FURNITURE PLAN
I-202 - INTERIOR RENDERINGS
I-600 - SIGNAGE PLAN
I-601 - SIGNAGE DETAILS
FIRE PROTECTION
F-001 - GENERAL NOTES AND LEGEND
F-002 -
F-110 - FLOOR PLAN
F-501 - DETAILS
F-502 - DETAILS
F-601 - RISER DIAGRAM
FIRE ALARM
FA001 - GENERAL NOTES AND LEGEND
FA110 - FLOOR PLAN
FA501 - DETAILS
FA502 - DETAILS II
FA601 - RISER MATRIX
MECHANICAL
M-001 - GENERAL ABBREVIATIONS AND SYMBOLS
M-110 - HVAC FLOOR PLAN
M-111 - HVAC HYDRONIC PLAN
M-120 - HVAC ROOF PLAN
M-401 - ENLARGED PLANS
M-501 - HVAC DETAILS
M-502 - HVAC DETAILS
M-601 - HVAC SCHEDULES
M-602 - HVAC SCHEDULES
M-603 - HVAC SCHEDULES
M-700 - SCHEMATICS
M-701 - SEQUENCE OF OPERATION AND CONTROL DIAGRAMS
M-702 - SEQUENCE OF OPERATION AND CONTROL DIAGRAMS
M-703 - SEQUENCE OF OPERATION AND CONTROL DIAGRAMS
M-704 - SEQUENCE OF OPERATION AND CONTROL DIAGRAMS
M-705 - SEQUENCE OF OPERATION AND CONTROL DIAGRAMS
PLUMBING
P-001 - GENERAL ABBREVIATIONS AND SYMBOLS
PD100 - DEMOLITION PLAN
P-100 - FLOOR PLAN FOUNDATION
P-110 - FLOOR PLAN WATER AND GAS
P-111 - FLOOR PLAN WASTE AND VENT
P-120 - ROOF PLAN
P-501 - DETAILS
P-502 - DETAILS
P-601 - SCHEDULES
P-901 - WASTE AND VENT ISOMETRIC
P-902 - WATER AND GAS ISOMETRIC
ELECTRICAL
E-001 - LEGEND
E-002 - ABBREVIATIONS
ED110 - DEMOLITION LIGHTING PLAN
ED111 - DEMOLITION POWER PLAN
EL110 - LIGHTING FLOOR PLAN
EG120 - LIGHTNING PROTECTION PLAN
EP110 - POWER FLOOR PLAN
EP111 - MECHANICAL POWER PLAN
E-401 - ENLARGED PLANS
E-402 - ENLARGED PLANS
E-501 - DETAILS
E-502 - DETAILS
E-503 - DETAILS
E-601 - SINGLELINE DIAGRAM
E-610 - LUMINAIRE SCHEDULES
E-620 - CONNECTION SCHEDULES
E-630 - PANELBOARD SCHEDULE
E-631 - PANELBOARD SCHEDULE
TELECOMMUNICATIONS
T-001 - GENERAL NOTES, LEGEND AND ABBREVIATIONS
T-110 - FLOOR PLAN
T-401 - ENLARGED TELECOM ROOM 1047AND ELEVATION
T-402 - ENLARGED TELECOM ROOM 1056AND ELEVATION
T-403 - ENLARGED TELECOM ROOM 1062AND ELEVATION
T-501 - DETAILS
T-502 - DETAILS
T-503 - DETAILS
ws-i - DETAILS
T-505 - DETAILS
T-506 - DETAILS
T-601 - DIAGRAM