PSXE172003
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
REASON FOR AMENDMENT: Update the options
1. The option for additional PV Array Panels has been updated to multple options.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 12
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Aug-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S9822B0002
X 9B. DATED (SEE ITEM 11)
15-Aug-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Aug-2022
CODE
USPFO TN 134 MISSION SUPPORT CONTRACTING
123 BRISCOE DRIVE
MCGHEE TYSON ANG BASE TN 37777-6227
W50S98 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W50S9822B0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
CLIN 0002
The CLIN extended description has changed from:
Additonal PV Array Panels
To:
Provide all PV panels, mounting posts, table, hardware, conduits,wiring, and installation for the expanded system that includes PV Panelstring 13-4 to 17-4. These are to be added to the Combiner Box CBX-4 thatis part of the base bid for a fully functional expanded system.
The pricing detail quantity has decreased by 9.00 from 10.00 to 1.00.
CLIN 0003 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003 1 Each OPTION Option 2
FFP
Provide all PV panels, mounting posts, table, hardware, conduits, wiring, and installation for the expanded system that includes PV Panel series 1-5 to 6-5 plus DC Combiner Box CBX-5, appropriate inverter, cabinets, switches and breakers. These are to be part of the new array for a fully functional expanded system.
FOB: Destination
SIGNAL CODE: A
PSC CD: Z2EZ
NET AMT
CLIN 0004 is added as follows:
0004 1 Each OPTION Option 3
FFP
Provide all PV panels, mounting posts, table, hardware, conduits, wiring, and installation for the expanded system that includes PV Panel series 7-5 to 12-5. These are to be added to the Combiner Box CBX-5 that is part of Option 2 for a fully functional expanded system.
FOB: Destination
CLIN 0005 is added as follows:
0005 1 Each OPTION Option 4
FFP
Provide all PV panels, mounting posts, table, hardware, conduits, wiring, and installation for the expanded system that includes PV Panel series 13-5 to 17-5. These are to be added to the Combiner Box CBX-5 that is part of Option 2 for a fully functional expanded system.
FOB: Destination
CLIN 0006 is added as follows:
0006 1 Each OPTION Option 5
FFP
Provide all PV panels, mounting posts, table, hardware, conduits, wiring, and installation for the expanded system that includes PV Panel series 1-6 to 6-6 plus DC Combiner Box CBX-6, appropriate inverter, cabinets, switches and breakers. These are to be part of the new array for a fully functional expanded system.
FOB: Destination
CLIN 0007 is added as follows:
0007 1 Each OPTION Option 6
FFP
Provide all PV panels, mounting posts, table, hardware, conduits, wiring, and installation for the expanded system that includes PV Panel series 7-6 to 12-6. These are to be added to the Combiner Box CBX-6 that is part of Option 5 for a fully functional expanded system.
FOB: Destination
CLIN 0008 is added as follows:
0008 1 Each OPTION Option 7
FFP
Provide all PV panels, mounting posts, table, hardware, conduits, wiring, and installation for the expanded system that includes PV Panel series 13-6 to 17-6. These are to be added to the Combiner Box CBX-6 that is part of Option 5 for a fully functional expanded system.
FOB: Destination
CLIN 0009 is added as follows:
0009 1 Each OPTION Option 8
FFP
Provide all PV panels, mounting posts, table, hardware, conduits, wiring, and installation for the expanded system that includes PV Panel series 1-7 to 6-7 plus DC Combiner Box CBX-7, appropriate inverter, cabinets, switches and breakers. These are to be part of the new array for a fully functional expanded system.
FOB: Destination
CLIN 0010 is added as follows:
0010 1 Each OPTION Option 9
FFP
Provide all PV panels, mounting posts, table, hardware, conduits, wiring, and installation for the expanded system that includes PV Panel series 7-7 to 12-7. These are to be added to the Combiner Box CBX-7 that is part of Option 8 for a fully functional expanded system.
FOB: Destination
CLIN 0011 is added as follows:
0011 1 Each OPTION Option 10
FFP
Provide all PV panels, mounting posts, table, hardware, conduits, wiring, and installation for the expanded system that includes PV Panel series 13-7 to 17-7. These are to be added to the Combiner Box CBX-7 that is part of Option 8 for a fully functional expanded system.
FOB: Destination
CLIN 0012 is added as follows:
0012 1 Each OPTION Option 11
FFP
Provide all PV panels, mounting posts, table, hardware, conduits, wiring, and installation for the expanded system that includes PV Panel series 1-8 to 6-8 plus DC Combiner Box CBX-8, appropriate inverter, cabinets, switches and breakers. These are to be part of the new array for a fully functional expanded system.
FOB: Destination
CLIN 0013 is added as follows:
0013 1 Each OPTION Option 12
FFP
Provide all PV panels, mounting posts, table, hardware, conduits, wiring, and installation for the expanded system that includes PV Panel series 7-8 to 11-8. These are to be added to the Combiner Box CBX-8 that is part of Option 11 for a fully functional expanded system.
FOB: Destination
The following Delivery Schedule item for CLIN 0002 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
270 dys. ANP 10 F7X318 - 134ARW/CEF
JAY FERGUSON
320 POST AVE
LOUISVILLE TN 37777
865-336-4212 FOB: Destination
F7X318
To:
CAGE
270 dys. ANP 1 F7X318 - 134ARW/CEF
JAY FERGUSON
320 POST AVE
LOUISVILLE TN 37777
865-336-4212
The following Delivery Schedule for CLIN 0003 has been added:
CAGE
270 dys. ANP 1 F7X318 - 134ARW/CEF
JAY FERGUSON
320 POST AVE
LOUISVILLE TN 37777
865-336-4212
The following Delivery Schedule for CLIN 0004 has been added:
CAGE
270 dys. ANP 1 F7X318 - 134ARW/CEF
JAY FERGUSON
320 POST AVE
LOUISVILLE TN 37777
865-336-4212
The following Delivery Schedule for CLIN 0005 has been added:
270 dys. ANP 1 F7X318 - 134ARW/CEF
320 POST AVE
LOUISVILLE TN 37777
865-336-4212
The following Delivery Schedule for CLIN 0006 has been added:
CAGE
270 dys. ANP 1 F7X318 - 134ARW/CEF
JAY FERGUSON
320 POST AVE
LOUISVILLE TN 37777
865-336-4212
The following Delivery Schedule for CLIN 0007 has been added:
CAGE
270 dys. ANP 1 F7X318 - 134ARW/CEF
JAY FERGUSON
320 POST AVE
LOUISVILLE TN 37777
865-336-4212
The following Delivery Schedule for CLIN 0008 has been added:
CAGE
270 dys. ANP 1 F7X318 - 134ARW/CEF
JAY FERGUSON
320 POST AVE
LOUISVILLE TN 37777
865-336-4212
The following Delivery Schedule for CLIN 0009 has been added:
320 POST AVE
LOUISVILLE TN 37777
865-336-4212
The following Delivery Schedule for CLIN 0010 has been added:
CAGE
270 dys. ANP 1 F7X318 - 134ARW/CEF
JAY FERGUSON
320 POST AVE
LOUISVILLE TN 37777
865-336-4212
The following Delivery Schedule for CLIN 0011 has been added:
CAGE
270 dys. ANP 1 F7X318 - 134ARW/CEF
JAY FERGUSON
320 POST AVE
LOUISVILLE TN 37777
865-336-4212
The following Delivery Schedule for CLIN 0012 has been added:
CAGE
270 dys. ANP 1 F7X318 - 134ARW/CEF
JAY FERGUSON
320 POST AVE
LOUISVILLE TN 37777
865-336-4212
The following Delivery Schedule for CLIN 0013 has been added:
320 POST AVE
LOUISVILLE TN 37777
865-336-4212
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following Acceptance/Inspection Schedule was added for CLIN 0003:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
N/A N/A N/A Government
The following Acceptance/Inspection Schedule was added for CLIN 0004:
The following Acceptance/Inspection Schedule was added for CLIN 0005:
The following Acceptance/Inspection Schedule was added for CLIN 0006:
The following Acceptance/Inspection Schedule was added for CLIN 0007:
The following Acceptance/Inspection Schedule was added for CLIN 0008:
The following Acceptance/Inspection Schedule was added for CLIN 0009:
The following Acceptance/Inspection Schedule was added for CLIN 0010:
The following Acceptance/Inspection Schedule was added for CLIN 0011:
The following Acceptance/Inspection Schedule was added for CLIN 0012:
The following Acceptance/Inspection Schedule was added for CLIN 0013:
(End of Summary of Changes)