W50S9721B0001 Amendment 0001 Remove Asphalt ATFP Solicitation.pdf

PDF 231 KB Posted

Attached to
Remove Pavement for ATFP Federal contract opportunity
Solicitation number
W50S9721B0001
Issued by
Department of the Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to Remove Pavement for ATFP, newest first.
File Type Posted
Bid Abstract_page 3 of 3.pdf PDF
Bid Signin sheet.pdf PDF
Bid Abstract_page 1 of 3.pdf PDF
Bid Abstract_page 2 of 3.pdf PDF
BKTZ202010 Drawing Amendments 1-Dated 22 April 2021.pdf PDF
Asphalt Demo Site Visit Roster.pdf PDF
Asphalt Demo Site Visit Slides 22 APR 21.pdf PDF
Preproposal minutes W912L721B0001.pdf PDF
11 - BKTZ202010 Remove Pavement for ATFP drawings 2-11-21.pdf PDF
W50S9721B0001 Remove Asphalt ATFP Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F8D3CE1042AD01 BKTZ202010

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

1. CONTRACT ID CODE PAGE OF PAGES

J 1 13

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 28-Apr-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S9721B0001

X 9B. DATED (SEE ITEM 11)

09-Apr-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to: 1) Update drawings, 2) update statement of work and 3) Update w age determination TN20210083 4-22-21.///All other terms and conditions remain unchanged///

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

28-Apr-2021

CODE

USPFO TN 118 MISSION SUPPORT CONTRACTING

240 KNAPP BLVD

NASHVILLE TN 37217-2538

W50S97 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W50S9721B0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The following have been modified:

BID SCHEDULE, NOTES

NOTES TABLE OF CONTENTS

SOLICITATION, OFFER, AND AWARD SF 1442 and SF 1442 BACK

SECTION 00010 - BID SCHEDULE, NOTES

SECTION 00100 - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

SECTION 00600- REPRESENTATIONS & CERTIFICATIONS

SECTION 00700 - CONTRACT CLAUSES

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

ATTACHMENT 1- DRAWINGS Project # BKTZ202010 Dated 22 April 2021.

ATTACHMENT 2- STATEMENT OF WORK Project # BKTZ202010 Dated 22 April 2021.

ATTACHMENT 3- WAGE DETERMINATION (See Section 00800)

NOTES

1. All information relating to this IFB, including pertinent changes/amendments and information will be posted on web site https://beta.sam.gov/.

2. Facsimile transmission of bid is not authorized. Electronic submission of bids will NOT be accepted.

3. All information relating to this IFB, including pertinent changes/amendments and information will be posted on web site https://beta.sam.gov/. For security reasons, all potential offerors, plan rooms and printing companies are required to be registered in the GSA System for Award Management (SAM) database. Firms can register via the SAM internet site at https://www.sam.gov/portal/public/SAM/. Interested bidders are required to submit their representations and certifications at the same site.

4. Reserved

5. A complete bid package must contain the following:

(a) Offer, Standard Form (SF) 1442 front and back signed

(b) Section 00010 Line Items- all items must be priced

(c) An Original Bid Bond and original Power of Attorney is required along with the bid on the due date.

(d) Section 00600, Representations and Certifications, completed and return only additional certifications found in this section In addition, the offeror must have entered current and complete data within the past year in Online Representations and Certifications at www.sam.gov.

(e) When completing the “Offeror” portion of the SF 1442 (Blocks 14 – 20), an official having the authority to contractually bind the company must sign the SF 1442 in accordance with FAR 4.102. One copy of the SF1442 is required to have an original signature.

(f) All amendments to the solicitation must be acknowledged.

(g) Mark the front of the envelope with the following: “BID No. W50S97-20-B-0001”, and the Name and Address of Bidder. See Block 13A of SF 1442 for required number of copies.

6. Joint Venture Requirements - Parties wishing to propose as a joint venture must submit, with the Pro Forma documents, an executed copy of the joint venture agreement. The joint venture agreement shall be executed in accordance with FAR 4.102(d). Each joint venture partner shall submit evidence satisfactory to the Contracting Officer that its Board of Directors has approved its participation in the joint venture or by an instrument of similarly binding character in the case of an unincorporated entity. Offerors are reminded that to obtain an award the awardee, to include a joint venture, must be registered in the System for Award Management (SAM) database.

Applicable to set-aside solicitations: Joint Ventures must meet applicable size standards (See FAR Subpart 19.1).

Submit with the proposal any size determination for the Joint Venture entity received from the Small Business Administration. A Joint Venture where-in one party is not a small business may be referred to the Small Business Administration ( IAW FAR 19.302 (b)) to determine eligibility. All questions regarding Joint Ventures must be directed to the Small Business Administration (SBA) and not the Contracting Officer.

NOTE: An Original Bid bond and Original Power of Attorney is required with submission of the bid. The bid bond is due on the date as stated on the SF1442 block 13. The bid bond must be on a SF24 form. Rejection of a bid bond shall be in accordance with FAR 28.101-4 Noncompliance with bid guarantee requirements.

SECTION 00700 - CONTRACT CLAUSES

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

DRAWINGS Project # BKTZ202010, 7 Sheets Dated February 2021-- Amendment 01- 3 Sheets Dated 22 April 2021.

STATEMENT OF WORK Project # BKTZ202010, 4 Sheets Dated February 2020--Amendment 01- 4 Sheets Dated 22 April 2021.

(End of clause)

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

STATEMENT OF WORK

STATEMENT OF WORK

REMOVE PAVEMENT FOR ATFP

BERRY FIELD, NASHVILLE, TENNESSEE

1) GENERAL

a) The work covered by this Statement of Work (SOW) consists of furnishing all labor, equipment, and materials to improve the force protection around building 802 and building 803 by removing existing asphalt areas and increasing standoff to parking areas in accordance with this written statement of work, all construction plans, specifications, and the building code. The work location is the 118th Wing, Nashville, Tennessee.

Contractor will be fully responsible for compliance with all base, local, state, and federal laws and regulations that apply to include environmental and occupational safety.

2) PERFORMANCE PERIOD

a) The performance period for this project is 90 calendar days.

3) SCOPE OF WORK

a) Contractor will perform all work as described herein and as shown on drawings for project BKTZ202010, Remove Pavement for ATFP.

b) Work around building 802

1. Remove existing asphalt pavement within 20 feet of building 802 as shown on plans.

2. Install new concrete sidewalks to existing doors.

3. Install new catchbasins, downspout extensions, drainage pipes, and concrete headwalls.

4. Install new curb and gutter with 12” high face.

5. Add topsoil and grass sodding where asphalt was removed.

6. Includes other work indicated on drawings.

c) Work around building 803

1. Remove existing asphalt pavement within 20 feet of building 803 as shown on plans.

2. Install new concrete sidewalks to existing doors.

3. Install new catchbasins, downspout extensions, drainage pipes, and concrete headwalls.

4. Install new curb and gutter with 12” high face.

5. Add topsoil and grass sodding where asphalt was removed.

6. Includes other work indicated on drawings.

7. Install (4) new removable bollards.

d) Contractor Manpower Reporting

1. The contractor will report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for Air Force collection site. The contractor is required to completely fill in all required data fields using the following web ad-dress: https://afcmra.hqda.pentagon.mil/

2. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September

30. While inputs may be reported any time during the FY, all data must be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk at http://www.ecmra.mil/.

3. Unit Identification Code (UIC) for the Requiring Activity: L41CFMLV

4. Issuing Office DoDAAC: W912L7

e) Contract Requirements

1. The contractor will adhere to all contract requirements in the solicitation and subsequent contract or delivery order.

2. In addition to those items in the solicitation/contract, the contractor will also be responsible to:

a. Obtain all dig permits, crane permits, or any other permits prior to starting construction.

b. Verify all field and plan measurements and notify the contracting officer’s representative (COR) of any discrepancies.

c. Perform all required construction staking.

d. Prepare project site for construction by placing adequate signage and other devices indicating construction zone for vehicular traffic and pedestrians.

e. Submit all project submittals to the COR for approval prior to the manufacture or placement of any construction materials.

f. Perform all material testing as required by specifications and building code.

g. Maintain adequate erosion control measures around any disturbed soil areas and prevent any soil discharge into stormwater systems.

h. Perform site finishing and cleanup to include grass establishment.

i. Remove all work related debris and dispose of it off the base property upon completion of project.

j. Contractor will acquire portable toilets for use by employees and any subcontractors working on this project.

4) REFERENCES

a) In general, all technical specifications are provided within the Construction Documents.

In the event any project element is not covered in the specifications provided, the contractor will refer to the Specification Hierarchy for direction related to the element.

All work in this project will adhere to the Unified Facilities Criteria.

5) SPECIFICATION HIERARCHY

a) The specification hierarchy is the collection of technical specifications to be used for all projects. The contractor should refer to the specifications provided in the Construction Documents first before moving to the next technical specification listed in the specification hierarchy. The hierarchy is listed in the order of precedence (i.e. “1” supersedes “2”). The hierarchy is as follows:

1. Specifications provided with Construction Documents

a. Technical Specifications

b. Construction Drawings

2. For MATOC contracts, the 118th Base Design Standards

3. Unified Facilities Guide Specifications on www.wbdg.org.

4. Unified Facilities Criteria available on www.wbdg.org.

6) SECURITY REQUIREMENTS

a) Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within Government controlled installation, facility, or area. The contractor will comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

7) CONTRACT DELIVERABLE SCHEDULE

'End of Statement of Work’

WAGE DTERMINATION

"General Decision Number: TN20210083 04/23/2021

Superseded General Decision Number: TN20200083

State: Tennessee

Construction Type: Building

County: Davidson County in Tennessee.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available

Deliverable Time Period Deliverable Threshold

10% Upon Notice to Proceed

(NTP)

Submitted bonds and project schedule

30% 30 days after NTP 30% of work completed. All material submittals approved.

60% 50 days after NTP 60% of work completed

90% 75 days after NTP Pre-final inspection. Work 90% complete.

100% 90 days after NTP Punch list 100% complete. Finish seeding, strawing and clean area. Project documentation supplied to contracting officer.

at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/01/2021 1 04/23/2021

BOIL0455-001 03/01/2018

Rates Fringes

Boilermaker....................$ 30.07 21.61

BRTN0005-009 05/01/2020

Rates Fringes

BRICKLAYER.......................$ 29.04 2.65

CARP0223-002 04/24/2016

Rates Fringes

CARPENTER (Cabinet Installation and Scaffold Builder Only)....................$ 23.95 11.36

ELEC0429-005 01/01/2020

Rates Fringes

ELECTRICIAN......................$ 27.72 13.48

ENGI0369-007 05/01/2013

Rates Fringes

OPERATOR: Forklift..............$ 24.47 10.85

IRON0492-008 05/01/2020

Rates Fringes

IRONWORKER, STRUCTURAL AND

REINFORCING......................$ 29.55 15.06

* PLUM0572-006 05/01/2020

Rates Fringes

PIPEFITTER, Includes HVAC Pipe Installation................$ 36.60 17.99

SHEE0177-004 05/01/2019

Rates Fringes

SHEET METAL WORKER, Includes HVAC Duct and Metal Roof Installation.....................$ 28.51 13.97

SUTN2009-082 09/21/2009

Rates Fringes

CARPENTER, Includes Drywall Hanging, and Form Work (Excludes Cabinet Installation, and Scaffold Building)........................$ 17.83 3.69

CEMENT MASON/CONCRETE FINISHER...$ 17.68 0.00

LABORER: Asphalt Raker..........$ 12.85 0.00

LABORER: Common or General......$ 12.41 1.04

LABORER: Landscape..............$ 9.60 0.80

LABORER: Mason Tender - Brick...$ 13.51 0.00

LABORER: Roof Tearoff...........$ 9.75 0.49

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 16.27 0.00

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 17.68 0.00

OPERATOR: Bulldozer.............$ 15.47 3.33

OPERATOR: Crane.................$ 19.16 3.35

OPERATOR: Mechanic..............$ 18.66 3.39

OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 14.25 0.00

OPERATOR: Roller................$ 12.83 0.00

PAINTER: Brush, Roller and Spray............................$ 13.15 0.00

PLUMBER, Excludes HVAC Pipe Installation.....................$ 20.03 9.00

ROOFER: Built up Roof...........$ 12.74 0.00

ROOFER: Rubber Roof.............$ 16.82 4.77

ROOFER: Single Ply Roof.........$ 16.50 0.32

TILE FINISHER....................$ 10.00 0.74

TRUCK DRIVER: Dump Truck........$ 12.16 0.00

TRUCK DRIVER: Material Truck....$ 12.16 1.66

TRUCK DRIVER: Pickup Truck......$ 11.70 3.92

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

(End of Summary of Changes)