11 - BKTZ202010 Remove Pavement for ATFP drawings 2-11-21.pdf
PDF 17 MB Posted
- Attached to
- Remove Pavement for ATFP Federal contract opportunity
- Solicitation number
- W50S9721B0001
- Issued by
- Department of the Army National Guard
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Abstract_page 3 of 3.pdf | ||
| Bid Signin sheet.pdf | ||
| Bid Abstract_page 1 of 3.pdf | ||
| Bid Abstract_page 2 of 3.pdf | ||
| BKTZ202010 Drawing Amendments 1-Dated 22 April 2021.pdf | ||
| W50S9721B0001 Amendment 0001 Remove Asphalt ATFP Solicitation.pdf | ||
| Asphalt Demo Site Visit Roster.pdf | ||
| Asphalt Demo Site Visit Slides 22 APR 21.pdf | ||
| Preproposal minutes W912L721B0001.pdf | ||
| W50S9721B0001 Remove Asphalt ATFP Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MATERIALS LEGEND
ELEVATIONS
I ' I CONCRETE
SECTION N/A
PLAN REVIEW DATA
N/A
DESCRIPTIONS
N/A
TENNESSEE AIR NATIONAL GUARD
118th WING
NASHVILLE I.A.P. TN
REMOVE PAVEMENT FOR ATFP
BIITZ-202010
GRAPHIC SYMBOLS VICINITY MAP
PLAN
(:_-.-_:-.:: .. ,:,1 CONCRETE
0---- INDICATES SECTION LEVEL
- REBAR
ttti MESH ±±±± WIRE
OPTIONS
N/A
REVISIONS
DESCRIPTION DATE
N ffi BUILDING CD NORTH
ABBREVIATIONS
CONC
CONT
DN
DTL
DWG
EJ
ELEC
ELEV
EXIST
CONCRETE
CONTINUOUS
DOWN
DETAIL
DRAWING
EXPANSION JOINT
ELECTRIC
ELEVATION
EXISTING
HT
ID
MISC
NIC
NTS
EXT
FIN
FLR
EXP
HEIGHT
INSIDE DIAMETER
MISCELLANEOUS
NOT IN CONTRACT
NOTTO SCALE
EXTERJOR
FINISH(ED)
FLOOR
EXPANSION
INDEX OF DRAWINGS
Sheet-CS.0 Cover Sheet
Sheet -1 Project Site and Utility Locations Sheet -2 Bldg 802 Site Plan
Sheet -3 Bldg 802 Elevations/ Drainage
Sheet -4 Bldg 802 Elevations/ Drainage
Sheet -5 Bldg 803 Site Plan
Sheet -6 Bldg 803 Elevation / Drainage
Sheet -7 General Notes
PROJECT LOCATION MAP
N
APPROVAL SIGNATURE BLOCK
SECTION SIGNATURE DATE
WING COMMANDER
BASE CIVIL ENGINEER
USING AGENCY z f---------+------------+----------,~u
SAFETY ~
FIRE DEPARTMENT ~
PROJECT ENGINEER
ENVIRONMENTAL
SECURITY POLICE f--t-t-+--+-+-+-+--+-1 f---------+------------+----------,~
COMMUNICATIONS
WINGATO CS.O
N
1 /4 " R
NEW DRAINAGE HEADWALL
1/4 "
<1 2"
EXISTING GRASS EDGE PERIMETER PATH <I
ASPHALT
'-.__..,,-TO REM Al N"-----
~ REMOVE
f I ASPHALT
"-------'--1--u ' [] )
'REMOVE
1-+------!it----+---, ASPHALT _l
I\ /\ . /\
<1 .
r
. I\
<1 /\ .
__..085 FT/FT
I . /\
I
<1
= <1 iio ./\ /\ co l_ .. i\ I\. A /
EXISTING
ASPHALT
.. <1 ,, /\
,· ___ _:_--1~~-✓-_ _:_ __ · _✓ ____ i__JL.J& f.-'- L\
6" ~
.20 FT/FT
7" _ _... ______ 17"--------i
----------24"-----------i
(12")N EW CON CRETE CURB DETAIL
>-+--------+-< i LO NEW CONCRETE SIDEWALK tt===t===t~ ~ ~ 20, -----1-if SEE DETAIL NEW 8" STORM DRAIN
SEE SHEET 3
>-+--------+-< '"---+-·□• NEW 8" DIA. STORM DRAIN
1o-12"x12" NEW CATCH BASINS
SLOPE GRADE TO EACH SURFACE
DRAIN SEE SHEET 3
BITUMINUS
--WEARING
SURFACE
BITUMINUS
--BINDER
AGGREGATE
--BASE
EXISTING BLDG WALL
SLOPE
NEW GRASS
SODDING NEW CATCH BASIN SURFACE
DRAIN
---SLOPE
NEW CONCRETE CURB
NEW STORM DRAIN
BACK LOWER ENTRANCE-CATCH
BASIN DETAIL-LOWER LEVEL
._..- REMOVE 1
>-+------1<1-----+-< ~ ASPHALT EXISTING BLDG WALL
LO EW CONC ETE SIDEWALK
i---t-------w-------J::::::!.W~ --l------1, - SEE DE AIL
BLDG WALL EDGE
f-+-----'~
- 11 t-+--------,J'~~Pff I tX+-+++-++t-+-t,t-+--t,jj',Yf-H-+-H.r--t-,1 /lt1// Id Ill
~ SANITARY r--1-t-------+-------.---r---r-.__
,, ,, ', ,, lll , (j SEWER '\ / ~REMOVE
111 '--1--c□ WATER (REMOVE ~ □ □ ASPHALT
I
.Ill
1\ \\1
VALVE ASPHALT ~ ,{1
. 63' ·:---------,--+-t----- ~v
EXISTING DOWNSPOUTS
e-- _,_
-- _i.- _i--
I I I
'1
EXISTING
ASPHALT
LL
W/1 i\l t
NEW DRAINAGE HEADWALL
r--fu:==p ==ff~~~~ ~~~$~~FF~ =i'U"'~E~X~IS~TIN;;.G~ SID~E~W~AL~K;;:;.T~O~ R~E~MA~IND.[== = ~ = =r-=r=u::l= ,,/---10
J) / ~
REMOVE V
_, I /; (Q
&' V EXISTING CURB TO REMAIN.
REMOVE
ASPHALT
0.-o
REMOVE
ASPHALT
I v
I ra'-" ;~ ~ot
-------.~, rr-----f--+---+-----+----¾:---'~++--+-r--+-110'--t'------+----+-------,L__--+-t---~
- I I I N\ y ' / /
:§~~XET/ASPH LT ASPHALT/
I
I I I I I ~ , ------/i-----------,,,L-/ __ -fl'------_-i __ s·_,'""----"s-11s·-6" -----=-=--------+------1-J
EXISTING CURB TO REMAIN.
-- I
NEW 8" STORM
SEE SHEET 3
DRAIN SEE NEW 12" CONCRETE CURB DETAIL
NOTE: SAWCUT ASPHALT ALONG BLDG 802, FRONT AND SIDE 20' FEET
FROM BLDG WALL AS SHOWN. REMOVE ASPHALT AND SUBBASE TO WHERE SAWCUT HAS BEEN MADE.
ONCE ASPHALT AND SUBBASE HAVE BEEN REMOVED.AN ADDITIONAL 4"(1NCHES) OF SOIL
IS TO BE REMOVED AND REPLACED WITH TOP SOIL AND SODDING TO TOP EDGE OF NEW CURB.
RAISE ALL PIPES AND WATER VALVES AND SEWER COVERS TO NEW SURFACE LEVEL IF REQUIRED.
NOTE: SEE PROJECT SITE UTILITIES ON SHEET 1
WIRE MESS 6X6X10
i----1 .. -5' /~ __l _L . ........--~-----o---L~~ s::I" tO t
I/ 3500 PSI CONCRETE
4" THK. CRUSHED STONE
CONCRETE SIDEWALK DETAIL
EXISTING SIDEWALK
NEW GRASS
NEW CATCH BASIN AND SODDING
8" STORM DRAIN
NEW CONCRETE CURB
---SLOPE
••••••• -.-.-.-.-.·.-.-.-.-.-.· • 4
EARTH
BLDG ENTRANCE-CATCH
BASIN DETAIL-UPPER LEVEL
3000 PSI CONCRETE
.. • ,i. •
#3 (.375) SIZE REBAR
8"DIA .
r-3'-0"7
EITUWINUS
-'11£ARINO
,u,.-ACE
_BITUI.INUS .,,..
-i6"i-----
8"DIA.
2'-0" 6"IN. GRAVEL BASE v TOP VIEW
SIDE VIEW FRONT VIEW
HEADWALL DETAILS
z ii:
°' 0 ff]
>i a • II:
C ..:I II: z 111111
~ ill z II: !i z
• II
loo co 111111 ..
II: ..
w w en en w z z w ill
SHEET 2
NEW CONCRETE SIDEWALK
SEE SHEET 2
EAST ELEVATION
BLDG. 802
/ til[_::::_::;...;,:...::.._.=.,::c_::::::::':"':. =:-:S;;;;L;;;;O=PE~~!f:=~ Ji~~~...,~-~---~-:;__ o..---PIPE CONTINUANCE
EAST ELEVATION
TOP OF GRADE
CLEANOUT
INSTALL NEW 8"INCH CORRUGATED
POLYETHYLENE DRAINAGE PIPE
NORTH ELEVATION
BLDG. 802
INSTALL NEW CONCRETE HEADWALL
45• WYE OR REDUCING
WHERE NECESSARY
NYLOPLAST CLEAN OlJT
END CAP (OR PVC EOUIVALEN
INSTALL STONE TO DISPERSE WATER FLOW
FLOW FROM :I
ROOF LEADER t
INSTALL NEW 8"INCH CORRUGATED
POLYETHYLENE DRAINAGE PIPE
SPECIFICATION AASHTO M-252, ASTM D-3350,
AND ASTM D-2321,
NOTE:
DRAIN SYSTEM DEPTH AND SLOPE TO BE DETERMINED
BY CONTRACTOR UPON APPROVAL BY COTR. PRIOR
TO INSTALLATION.
NOTE:
SEE PROJECT SITE UTILITIES ON SHEET 1
i ·-+·-· i
NOTE:
45• WYE OR REDUCING
WYE 'M-IERE NECESSARY.
FLOW FLOW
LATERAL CONNECTION DETAIL
VARIABLE
FINISH GRADE
DRAIN PIPE
SEE LAYOUT PLAN)
• I T
YABIABIE
DOWNSPOUT
BUILDING FACE
DOWNSPOUT ADAPTER
45• BEND
VARIABLE
CATCH BASIN DETAIL
1. STANDARTPARK 16X16 CATCH BASIN SW18473
WITH 8" INCH POLYETHYLENE CORRUGRATED
KNOCKOUT OUTLETS.
CLEANOUT DETAIL
p
2. SEE SHEET 2 FOR PLACEMENT OF SURFACE CATCH BASINS
UJ
UJ ...J ...
Cl) <( ;;; "' C/l Zo .;~ UJ O c::: z " 'I' Z -<(O ~m Z IV f-- 0::: " <'> UJ _..... <( :::J O ~ ;;, 1- <C z (!) :3 '!e a • II:
C ..:I II: z 111111 ill II: z
• 111111
II:
w w en en w z z w ill
0 ~ ~ C/J ii LL
Cl'. :1. '& UJ O ;ii;
w ro m Z "'°' - "O "' (9 iii ;;, z -gw
W CD;
....I a. " - io > " .<=
- "' 0..
I N to w C -= z 111111
-= a: w a w Ill Ill ..... w z
~ z z w z 0 w !i 111111 :I ..
lit ;., II II loo -= Ill co = .. =-.. • w a .a w ..a ..
"' w = a:
N w Ill
0 co C a ..a m z ii:
°' 0 ff]
>i
SHEET 3
rn
SOUTH ELEVATION
BLDG. 802
lf, ll·
,t,&f · 0~
¢ 1~· i ·-·+·-· i, i
CATCH BASIN DETAIL
NOTE:
1. STANDARTPARK 16X16 CATCH BASIN SW18473
WITH 8" INCH POLYETHYLENE CORRUGRATED
KNOCKOUT OUTLETS.
2. SEE SHEET 2 FOR PLACEMENT OF CATCH BASIN
FRONT ENTRANCE
NEW GRASS
SODDING
NEW CATCH BASIN AND
8" STOR DRAIN
GRAVEL
BLDG ENTRANCE-CATCH
BASIN DETAIL
EARTH
EXISTING BLOCK WALL
rn rn rn rn
NEW CONCRETE SIDEWALK
SEE SHEET 2
rn rn
BLDG
DRAIN
802 ENTRANCE
SYSTEM LOCATION
TOP OF GRADE
GRAVEL
INSTALL NEW 8"INCH CORRUGATED
POLYETHYLENE DRAINAGE PIPE
INSTALL NEW CONCRETE HEADWALL
INSTALL STONE TO DISPERSE WATER FLOW
SPECIFICATION AASHTO M-252, ASTM D-3350,
AND ASTM D-2321,
NOTE:
DRAIN SYSTEM DEPTH AND SLOPE TO BE DETERMINED
BY CONTRACTOR UPON APPROVAL BY COTR. PRIOR
TO INSTALLATION.
NOTE:
SEE PROJECT SITE UTILITIES ON SHEET 1
EAST ELEVATION
z ii:
°' 0 ff]
>i a • II:
C ..:I II: z 0 -ill II: z
• -II:
w w en en w z z w ill w
"' IC z - w ; w Ill Ill w a z z - w
~ z ~ z !i 0 w - ~ iii ;., II IC 5 loo co ;.. = .. .. w • a
..:I .a w w ..
"' N = 0 a: co w Ill
"' a ..:I ra
SHEET 4
~ L.
~ I "(J' ~
A,_£
I
3000 PSI CONCRETE #3 (.375 SIZE REBAR
B"DIA.
----j 1' f--
SIDE VIEW
B"OIA.
TOP VIEW
FRONT VIEW
HEADWALL DETAILS
AC UNIT
EXISTING
CANOPY TOP
REMOVE EXISTING
ASPHALT
VENT
ss--
11'
NEW CONCRETE HEADWALL
DRAINAGE SYSTEM
NEW CONCRETE CURB
t-------a---1 REMOVE EXISTING ASPHALT
ASPHALT
NEW CONCRET
SIDEWALK
~ ~r---NEW CATCH
GRATED POLYETHYLENE
~ J.-----~ _--'-'.J.Cu::::>J..l."I PIPE
□ EXISTING
PARKING
1/4 " R
---.--"7-~~~==---1/4 "
1/4"
.I\ . I\
<1 .I\ I\
I ,i _..085 FT/FT <1 .I\
I
<1 . I\
CX) • <1
I\ I\
CX)
_L . . A
.. <1
I\ .
I\
✓ I\
611 ~
.20 FT/FT
7" --.j-------- 17" ---------s--1 i------------24"-------------i
BITUMINUS
-WEARING
SURFACE
_BITUMINUS
BINDER
(12")NEW CONCRETE CURB DETAIL
WIRE MESS 6X6X10
i---5'----A--i
"<t
3500 PSI CONCRETE
6" THK. CRUSHED STONE
VENT CONCRETE SIDEWALK DETAIL
EXISTING BLDG WALL
EXISTING
CANOPY TOP
NEW CONCRETE
SIDEWALK
AC UNITS ?--1~ .. ~--~-~ .. ~ ... -.~--~. ~✓ EXISTING EDGE OF CONCRETE
ilii.tm&::' · , §
REMOVE EXISTING
ASH ALT AND REPLACE WITH
NEW 3500 PSI CONCRETE PAD AND
4000 PSI CONCRETE CURB AS SHOWN
BLOG 803
NOTE: SAWCUT ASPHALT ALONG BLDG 803, 20' FEET
FROM BLDG WALL. REMOVE ASPHALT AND SUBBASE AROUND ALL ABOVE GROUND PIPE'S
CONCRETE PAD'S AS SHOWN IN DRAWING TO WHERE SAWCUT HAS BEEN MADE.
ONCE ASPHALT AND SUBBASE HAVE BEEN REMOVED.AN ADDITIONAL 4"(1NCHES) OF SOIL
IS TO BE REMOVED AND REPLACED WITH TOP SOIL AND SODDING TO TOP EDGE OF NEW CURB.
RAISE ALL PIPES AND WATER VALVES AND SEWER COVERS TO NEW SURFACE LEVEL IF REQUIRED.
0 11 ·
061· r;,Bi- · .,..
NOTE:
NEW GRASS
SODDING
NEW CATCH BASIN AND
8" STORM DRAIN
SLOPE
: : : : :::: :: : :: : : : : :: :: :: : : : :: :: : : : : : : : : =::::::::::::::: .- . .d
EARTH
BLDG 803-SURFACE CATCH
BASIN DETAIL
CATCH BASIN DETAIL
1. STANDARTPARK 16X16 CATCH BASIN SW18473
WITH 8" INCH POLYETHYLENE CORRUGRATED
KNOCKOUT OUTLETS.
NEW 12" CONCRETE CURB
I z ii:
°' 0 ff]
>i a • = C ..:I II: z 111111 ill II: z
• 111111
II:
w w en en w z z w ill
SHEET 5
SEE SHEET 5 FOR THIS SECTION OF
CON STRU CTI ON
NOTE:
;,, ,H· I
©<r" ~ lt;/_
~1,f·
CATCH BASIN DETAIL
1. STANDARTPARK 16X16 CATCH BASIN SW18473
WITH 8" INCH POLYETHYLENE CORRUGRATED
KNOCKOUT OUTLETS.
2. SEE SHEET 2 FOR PLACEMENT OF CATCH BASIN
NEW CATCH BASIN AND
8" STORM DRAIN
EAST
NEW GRASS
SODDING
i-------'.-20'-0"-----1.
NEW CONCRETE CURB
'.,::.:::. f-;::~·>:):·~~-.
EARTH
BLDG ENTRANCE-CATCH
BASIN DETAIL
SLOPE-FLOW
GRAVEL
NEW CATCH BASIN
ELEVATION
NORTH
\ I
SLOPE-FLOW
i T T I
L f .--.~ 11 .. . .• ..
EXISTING AC UNITS
SLOPE-FLOW
GRAVEL
INSTALL NEW 8"INCH CORRUGATED
POLYETHYLENE DRAINAGE PIPE
NEW CATCH BASIN
SPECIFICATION AASHTO M-252, ASTM 0-3350,
AND ASTM D-2321,
NOTE:
DRAIN SYSTEM DEPTH AND SLOPE TO BE DETERMINED
BY CONTRACTOR UPON APPROVAL BY COTR. PRIOR
TO INSTALLATION.
NOTE:
SEE PROJECT SITE UTILITIES ON SHEET 1
\ f I
L
ELEVATION
3000 PSI CONCRETE
#3 (.375) SIZE REBAR
8"DIA.
--j 1' f-- r 3'-0" 7 t ~ 2'-0" ~
~ 6"1N. GRAVEL BASE
1 f-- 3'-0" ------jT
6" 8"DIA.
TOP VIEW
SIDE VIEW FRONT VIEW
HEADWALL DETAILS
BLDG. 803
NOTE: SAWCUT ASPHALT ALONG BLDG 803, 20' FEET
FROM BLDG WALL. REMOVE ASPHALT AND SUBBASE AROUND ALL ABOVE GROUND PIPE'S
CONCRETE PAD'S AS SHOWN IN DRAWING TO WHERE SAWCUT HAS BEEN MADE.
ONCE ASPHALT AND SUBBASE HAVE BEEN REMOVED,AN ADDITIONAL 4"(1NCHES) OF SOIL
IS TO BE REMOVED AND REPLACED WITH TOP SOIL AND SODDING TO TOP EDGE OF CURB.
SEE SHEET 5
z ii:
°' 0 ff]
>i a • II:
C ..:I II: z 0 -ill II: z
• -II:
w w en en w z z w ill w C II: z -II: w w • Ill Ill a w z - z w
~ z ~ z !i 0 w - ~ ill ;., II II: 5 loo co =- = .. .. w • a
..:I .a w w .. "' "" = a: 0 w co Ill
C a ..:I Ill
SHEET 6
---·1/4 II
('\I , <J
2" IT]
1/4 II
L BITUMINUS
WEARING
/\ <J .
~ 00 <JI\ l\ 00<1 l .. i\ .. <J
I-'-.. __ <'.l_. __ _,___._ _____ _
. l\ .085 FT/FT <J l\
/\ . I .
l\ I\
✓ l\
I SURFACE
l\ @] BITUMINUS
BINDER
I
AGGREGATE
BASE
--~ 6-1/2" -----j 7"
.20 FT/FT
17., lwGI
24" ~
CURB DETA L
1 .
2.
3.
GENERAL NOTES
3 0 4 m m ( 1 2 ") CONCRETE D ET AC H ED
304mm (12") CONCRETE COMBINED CURB AND GUTTER TABLE
TOTAL WIDTH OF VERTICAL VERTICAL VERTICAL DEPTH
WIDTH ~ GUTTER IWGI DROP [I] IN DEPTH [QJ [y] OF GUTTER
IN INCHES IN INCHES INCHES OF GUTTER AT FLOW LINE
750mm (24") 580mm (23") 50mm (2") 203mm (8") V-203mm (8")
VERTICAL DEPTH (V) MUST ALWAYS EXCEED 150mm (6").
THE FRONT FACE OF THE CONCRETE CURBS FOR ALL DEGREES OF CURVATURE SHALL CONFORM TO
THE CONTOUR OF THE CURVE AND NO CHORD SECTIONS WILL BE PERMITTED.
CONCRETE EXPANSION JOINT MATERIAL IS TO BE 20mm ( ~") PREMOLDED FIBER IN ACCORDANCE
WITH SECTION 905 - JOINT MATERIALS OF THE STANDARD SPECIFICATIONS.
EXPANSION JOINTS ARE TO BE PLACED AS FOLLOWS:
1. AT TANGENT POINTS OF CIRCULAR CURBS
2. BETWEEN CURBS AND ABUTTING RIGID OBJECTS
3. AT OTHER PLACES WHERE STRESSES MAY DEVELOP
4. SO AS TO LINE UP WITH PAVEMENT JOINTS WHERE THE ADJACENT PAVEMENT IS CONCRETE
5. MAXIMUM SPACING IS TO BE 30,000mm ( 100')
4. CONTRACTION JOINTS ARE TO BE SPACED AT 3000mm (1 O'). THE SPACING OF 3000mm (1 O') MAY BE REDUCED FOR CLOSURES, BUT NOT LESS THAN 1800mm (6').
5. EDGES OF JOINTS SHALL BE FINISHED ON 8mm ( ¾") RADII.
GENERAL NOTES
THE CONTRACTOR SHALL INSTALL AN 8"INCH DIAMETER CORRUGRATED POLYETHYLENE
PIPE DRAINAGE SYSTEM, WITH CATCH BASINS, CLEANOUTS AND HEADWALL. THE NEW
SYSTEM IS TO BE CONNECTED TO BLDG'S 802 EXISTING DOWNSPOUT ROOF SYSTEM,
WHICH IS LOCATED ON THE NORTH ELEVATION, LOWER LEVEL SIDE. FIVE CATCH BASINS
ARE TO BE LOCATED IN THE NEW GRASS AREA'S AND GRADE SLOPED TO EACH BASIN TO ALLOW
ANY SURFACE WATER FROM ACCUMULATING.
THE FRONT ENTRANCE, SOUTH ELEVATION SIDE OF BLDG 802 WILL ALSO BE INSTALLED A DRAIN SYSTEM
TO CONTAIN FIVE CATCH BASINS, A HEADWALL AND AN 8" CORRUGRATED PIPE SYSTEM AS SHOWN ON SHEET
DRAWINGS.
BLDG 803's DRAINAGE SYSTEM WILL CONSIST OF FIVE 16"X16" CATCH BASINS, A HEADWALL AND 8" INCH
CORRUGRATED POLYETHYLENE PIPE. THE DRAINAGE SYSTEM IS TO BE LOCATED 11 FEET FROM BLDG WALL
TO CENTER OF GRASS AREA, SURFACE SHALL BE SLOPED TO EACH BASIN TO REMOVE ANY EXCESS WATER.
THE NEW DRAINAGE SYSTEMS FOR BLDG's 802 AND 803 SHALL MEET ALL STATE, LOCAL AND FEDERAL GUIDLINES
AND SPECIFICATIONS AASHTO M-252 AND ASTM D-3350 AND ASTM D-2321 REQUIREMENTS.
SAWCUT ASPHALT AT EACH BLDG SITE AS SHOWN AND INSTALL NEW CONCRETE CURB. REMOVE ALL ASPHALT AND SUBBASE, WITHIN THE AREAS FOR EACH BLDG. ONCE REMOVED AN ADDITIONAL 4" INCHES OF SOIL IS TO BE REMOVED AND REFILLED WITH TOPSOIL
AND GRASS SODDING TO TOP EDGE OF CONCRETE CURB.
THE CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY ALL FIELD MEASUREMENTS FOR DEPTH AND SLOPE FOR DRAIN SYSTEM.
CONTRACTOR SHALL, PRIOR TO INSTALLATION OF DRAINAGE SYSTEM AND CONCRETE CURBING GET APPROVAL FROM PROJECT COTR.
z ii:
°' 0 ff]
>i a • II:
C ..:I II: rll z w 0 Ii-111111 ill iO II: !iZ z
..:I • II
loo
-= 111111 co .. a: II: ..
w w z w en w en
"' w z z w ill
SHEET 7
w w Ill Ill w z z w w :I ..
II
Ill
= • a .a w ..
= a: w Ill
| SHEET 0. CSO Cover Sheet |
| SHEET 2 BLDG 802 Site Plan |
| SHEET 3 BLDG 802 Elevations - Drainage |
| SHEET 4 BLDG 802 Elevations - Drainage |
| SHEET 5 BLDG 803 Site Plan |
| SHEET 6 BLDG 803 Elevations - Drainage |
| SHEET 7 General Notes |
File details come from the government source that posted it. Updated .