167th Arch Design Guide (Jan03).pdf
PDF 8 MB Posted
- Attached to
- Base-Wide Interior Renovations Federal contract opportunity
- Solicitation number
- W50S8V-23-B-0002
- Issued by
- Department of the Army National Guard
About this file
This federal contract solicitation seeks bids for base-wide interior renovation work. The solicitation is a total small business set-aside according to FAR 19.5, with an estimated value between $250,000 and $500,000. The project falls under NAICS code 236220 with a size standard of $45 million. Davis Bacon wage rates apply. Funds are presently unavailable but are expected to be allocated by 30 September 2023. The Army National Guard is the contracting agency. Award will be made based solely on price to the responsible bidder offering the most advantageous proposal in compliance with the solicitation. The deadline to respond is not specified.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract of Offers - Base-wide Interior Renovations Phase II.pdf | ||
| B119 Plumbing As-Builts.pdf | ||
| WV20230034 30 June 2023.pdf | ||
| W50S8V23B00020004.pdf | ||
| Basewide Renovation Phase 2 - 05 - SOW- updated July 2023.pdf | ||
| Base Renovations Phase 2 Questions_Final.pdf | ||
| W50S8V-23-B-0002-0003.pdf | ||
| W50S8V-23-B-0002-0002.pdf | ||
| Base Renovation Phase 2 Site Visit Sign in Log.pdf | ||
| Site Visit PP - Base-wide Interior Renovations Phase 2.pptx | PPTX presentation | |
| Statement of Work - Basewide Renovation Phase 2 dated 13 June 2023.pdf | ||
| W50S8V-23-B-0002-0001 Amendment Document.pdf | ||
| W50S8V-23-B-0002-0001.pdf | ||
| BACKGROUND VETTING FORM - Basewide Interior Renovations Phase 2.docx | DOCX document | |
| Basewide Renovation Phase 2 - SOW - FINAL.pdf | ||
| W50S8V-23-B-0002.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A C K N O W L E D G E M E N T S
This Design Guide for the development of new facilities for the 167th Airlift Wing of the West
Virginia Air National Guard in Martinsburg, West
Virginia was prepared by HSMM Inc. for the US
Property and Fiscal Offi ce, West Virginia.
In addition, these services were performed for the Air
National Guard Readiness Center, Civil Engineering
Directorate, and Andrews Air Force Base, Maryland.
The following people were instrumental in its preparation:
Colonel Jesse A. Thomas, Base Commander
167th Airlift Wing
West Virginia Air National Guard
Martinsburg, West Virginia
Colonel William R. Gain, Vice Commander
167th Airlift Wing
West Virginia Air National Guard
Martinsburg, West Virginia
Colonel Brian A. Truman, Logistics Commander
167th Airlift Wing
West Virginia Air National Guard
Martinsburg, West Virginia
Colonel Roger Nye, Director of Operations
167th Airlift Wing
West Virginia Air National Guard
Martinsburg, West Virginia
Col. Patricia A. Burkhart, Support Group
Commander
167th Airlift Wing
West Virginia Air National Guard
Martinsburg, West Virginia
Lt. Col. Bill B. Burkhart, Base Civil Engineer
167th Airlift Wing
West Virginia Air National Guard
Martinsburg, West Virginia
Captain Paul A. Henry, Deputy Base Civil
Engineer
167th Airlift Wing
West Virginia Air National Guard
Martinsburg, West Virginia
Mr. Gary Hinkle, Program Manager
Air National Guard Readiness Center/CECU
Andrews Air Force Base, Maryland
Mr. Douglas Rowand, Program Manager
Air National Guard Readiness Center/CECU
Andrews Air Force Base, Maryland
Colonel Richard L. Dillion, USPFO
USPFO for West Virginia
Buckhannon, West Virginia
Major Terry Mills, Supervisory Contract
Specialist
USPFO for West Virginia
Contracting Offi ce
Buckhannon, West Virginia
Mrs. Patricia D. Karickhoff, Contract Specialist
USPFO for West Virginia
Contracting Offi ce
Buckhannon, West Virginia
Captain John M. Knabenshue, Contract Specialist
USPFO for West Virginia
Contracting Offi ce
Buckhannon, West Virginia
Team consultants:
HSMM, Inc.
1030 15th Street NW, Suite 500
Washington, DC 20005
202.371.5200
DMJMH+N
394 Pacifi c Avenue, 3rd Floor
San Francisco, CA 94111
415.986.1373
LPDA
310 E. Main Street, Suite 200
Charlottesville, VA 22902
434.296.2108
1 Introduction
1.1 Mission
1.1 Wing History
1.2 History of Design Excellence
1.5 Purpose of the Design Guide
1.5 Project Challenges
1.5 Competency of Selected A/E Firms
1.6 The Design Team
1.7 Design Guide Organization
2 Master Plan
2.1 Boundaries
2.1 Circulation Hierarchies
2.1 Buildings and Adjacencies
2.3 Design Constraints
3 Governing Design Codes and Criteria
3.1 Codes and Local Authorities
3.1 Security: Force Protection
3.1 Sustainable Design
4 Coordination and Project Approach:
Design Process Recommendations
4.1 Architectural Teams/Building Design
4.1 Project Books
4.2 Engineering
4.2 Site Parcels/Match Lines
4.2 Common Specifi cations & Graphics
4.3 Procurement/Standardizaion
5 Site Planning
5.1 Context
5.2 Functional Relationships
5.2 Existing Site Preservations
5.2 Apron and Runway
5.3 Environmental Issues
5.3 NAVAID Interference
5.3 Light Refl ection and Glare
5.4 Noise Issues
5.4 Accessibility Compliance
6 Site Utility Distribution
7 Building Architecture
7.1 Objectives
7.1 Building Themes
7.1 Scale and Massing
7.3 Exterior Materials and Color
7.4 Brick Veneer Detailing
7.4 Roofs and Roof Edges
7.6 Windows
7.6 Doors
7.6 Building Entrances
7.7 Exterior Lighting
7.7 Architectural Detailing
7.7 Seismic
7.7 Maintenance Issues--Exterior
7.7 Energy
7.8 Miscellaneous
7.8 Facility Architecture
7.9 Administrative Buildings
7.13 Hangars
7.18 Industrial Buildings
7.20 Exterior Material Palette
8 Signage
8.1 Building Signage
8.2 Interior Signage
8.4 Exterior Signage
TA B L E O F C O N T E N T S
9 Interior Design
9.1 Overview of Interior Design Guidelines
9.2 Overview of Interiors Acquisition
9.4 Design Guidelines for Structural Interior
Design
9.5 Design Guidelines for Comprehensive
Interior Design
9.6 Lobby/Entry
9.8 Corridors
9.8 Industrial Administration/Shop Areas
9.9 General Open Offi ce Areas
9.10 Command Grade Offi ce Areas
9.11 Conference Rooms
9.12 Classrooms/Training Rooms
9.13 Dining Areas
9.14 Break Rooms
9.14 Copy/Supply Rooms
9.15 Toilets
9.18 Generic Furniture Requirements
9.19 Miscellaneous
9.22 Finish Matrices
9.24 Interior Finish Palette
10 Building Systems
10.1 General Design Standards
10.1 Insulation Systems
10.2 Roofi ng Systems
10.2 Structural Systems
10.3 Metering and Monitoring Devices
10.3 Energy Management and Control Systems
(EMCS)
10.4 Plumbing Systems
10.4 Mechanical HVAC Systems
10.5 Electrical Systems
10.7 Fire Protection-Detected Systems
10.7 Communications
10.8 Security/Intrusion Protection
10.8 Lightning Protection
11 Site Design
11.1 Force Protection
11.2 Main Entry
11.3 Roadways
11.3 Accessibility
11.3 Parking Lots
11.6 Fencing
11.8 Plazas, Mall, Pedestrian Nodes and Courts
11.10 Paving Materials
11.10 Signage
11.11 Site Furnishings
11.13 Use of Unit Logo
11.13 Lighting
11.14 Murals and Public Art
12 Landscape Architecture
12.1 Force Protection
12.1 Design Intent
12.2 Environmental Considerations
12.2 Planting Standards
12.3 Screening and Buffering
12.5 Irrigation Design
12.5 Maintenance Issues
12.6 Streetscape
12.8 Site Zones
12.13 Detention Ponds and Drainage Ways
12.13 Landscape Material Types and Uses
13 Outline Specifi cations
14 Document Standards and
Requirements
Appendix--Acronyms
Mission
The primary mission of the 167th Airlift Wing is “to provide a quality force to accomplish airlift, aerial delivery and mobility missions in support of the nation, and respond to the needs of the State of West
Virginia and its communities.” The unit’s vision is to remain a world-class organization responding to the challenges of the 21st century.
The C-5 Galaxy Transport Aircraft will become the primary vehicle used to support the mission. The C-5 is one of the largest aircraft in the world. It has the ability to transport nearly all of the Army’s combat equipment, including such bulky items as the 74 ton mobile scissors bridge from the US to any theater of combat on the globe.
Wing History
The 167th Airlift Wing was initially constituted as the 369th Fighter Squadron on 20 December 1942, formally activated on 15 January 1943, and assigned to the 359th Fighter Group from 15 January 1943 to 10 November 1945. Assignments included:
Westover Field, Massachusetts on 15 January 1943, Grenier Field, New Hampshire on 6 April 1943, Republic Field, New York on 26 May 1943, Westover
Field, MA from 24 August 1943 until 2 October
1943, East Wretham, England from 18 October 1943 until 4 November 1945 and Camp Kilmer, New
Jersey on 9-10 November 1945. The Aircraft fl own during World War II was the P-47 Thunderbold
(1943-1944) and the P-51 Mustang (1944-1945).
The 369th took part in the Air Offensive, Europe;
Normandy, Northern France, Rhineland; Ardennes-
Alsace; Central Europe Air Combat, EAME Theater.
The squadron was deactivated on 10 November 1945, redesignated the 167th Fighter Squadron and allotted to the Air National Guard (ANG) on 24 May 1946.
The Air National Guard designated the State of West
Virginia as the resident state for the fi ghter squadron.
167th Airlift Wing, Martinsburg, West Virginia
January 2003 1.1
I N T R O D U C T I O N
On 24 May 1946, Charleston’s Kanawha Airport became the home base for the renamed 167th Fighter
Squadron. The unit reactivated on 5 January 1947 and was federally recognized effective 7 March 1947.
The name, mission, size and even the site changed over the next 40 years, but the numbers “167” have remained constant with the West Virginia Air
National Guard.
On 21 September 1955 Martinsburg became the new home to the 167th Fighter Interceptor Squadron and
Lt. Col. Joseph T. Crane, Jr. became the Commander.
The offi cial move from Charleston came on 3
December 1955, when the 167th deactivated and reactivated on 4 December at Martinsburg. Shortly thereafter, equipment moved to the new site and active recruiting commenced to achieve full authorized personnel strength. The aircraft assigned included the P-51 Mustang, T-6 Trainer, and a C-47
Skytrain.
Initially, the base at the Eastern West Virginia
Regional Airport had only one hangar, a motor pool, and a supply building. Many major additions have since been made to the base, including a fi re hall, base operations building, nose dock, civil engineering building, corrosion control/fuel cell facility, engine shop, aerospace ground equipment shop, barracks, clinic, avionics shop and aerial port building.
June 1, 1992, saw the unit’s name change again. This time, the 167th Tactical Airlift Group became the
167th Airlift Group. Reorganization placed the unit in the Air Mobility Command.
In 1995, the unit began conversion training for the C-
130H-3 in the fi rst quarter and transferred most of the
“E” models to Peoria, Illinois. The Civil Engineers deployed to Panama and the Medical Squadron deployed to Honduras. Most of the sections took part in a deployment to Alpena, Michigan in September where chemical exercises and other special training took place. The unit celebrated its 40th anniversary on 10 June 1995 with an open house and dance.
The 167th Airlift Group was redesignated the 167th
Airlift Wing on 1 October 1995. Then on 16 April
1997, the 167th Airlift Wing was assigned under the
Air Mobility Command (AMC), with no change in mission or assignment.
The unit currently has C-130H-3 aircraft. On 9
April 2002, the converstion of the base to XPAA
C-5 aircraft was announced by Senator Byrd. The unit is ready to help defend our nation and aid the surrounding community at a moment’s notice.
History of Design Excellence
The Air National Guard (ANG) has been a leader in the development of Design Standards for its facilities for many years. The ANG has recognized the direct connection between quality facilities and the surrounding environment on mission critical elements including recruitment, retention, and readiness.
Beyond the parallel between the built environment and these issues, the ANG also sees design as a process, and has instituted policies and procedures that bring excellence and uniformity to this process as well as the end product.
The ANG initiated a focus on design well over 20 years ago, with the active participation of ANG projects in the Air Force Design awards program. The quality of the product has resulted in a consistently high percentage of design awards being garnered by the ANG. However, the ANG came to see that Design
Excellence needed to encompass far more than award plaques based largely on facilities that were deemed aesthetically pleasing or innovative. Accordingly, the
ANG determined that truly excellent design needed to meet multiple standards. As a result, the ANG broadened its view of Design, and determined that comprehensive design excellence must include:
• Focus on maintenance and durability. This translates into the selection and use of durable materials, reliable engineering systems, and maximizing standardization.
AIR NATIONAL GUARD DESIGN GUIDE
LPDA
DMJMH+N 1.2
• Suitability of the design for the current or future mission. This translates into providing a design with the maximum fl exibility for future change.
Design elements that should address this include open offi ce plans, suffi cient “land banking” adjacent to facilities to allow for expansions, and multi-phase design concepts.
• Conformance to federal standards which include force protection and sustainable design principals. Force Protection compliance should not be an option. Designs of new facilities should provide for the maximum protection of
ANG personnel and assets. In similar fashion, utilization of sustainable design concepts provides for energy effi cient facilities as well as environmentally responsible usage of recycled materials.
• Compatibility of a given facility with the larger whole of the base or surrounding environment.
Good design must be responsive to the surrounding base environment both functionally and aesthetically. A given facility must be seen as part of the larger base, and its role in the overall base functions and mission support must be fully understood and addressed. In addition, good design requires a comprehensive look and feel for facilities individually as well as the overall composition of the base. Accordingly, good design should harmonize with the surrounding environment, and not be a stand alone architectural statement.
• Use and selection of materials appropriate to the region. In addition to using durable, maintenance-free materials, these materials should be responsive to what is readily available in the geographic region of the project. In this case, West Virginia products should be considered wherever feasible.
• A facility that meets the stated program, budget and schedule goals established at the onset of the project. The process is as important as the product, and part of the process is the establishment of agreed upon schedules and budgets. A building which meets all aesthetic, functional, and maintenance criteria, but which fails to meet schedule and budget criteria should not be considered for design excellence.
This award winning Fire Training Station for the Tennessee ANG uses a combination of durable low maintenance exterior materials such as metal panel systems and brick masonry.
This Civil Engineering Building for the Maine Air National Guard utilizes clerestory lighting to maximize natural light to the interior spaces of the facility.
The Design standards developed for the new Illinois Air National Guard base located at Scott Air Force Base provided guidance in terms of materials, massing, and an overall architectural theme resulting in a unifi ed cohesive campus.
167th Airlift Wing, Martinsburg, West Virginia
January 2003 1.3
The history of this evolution of Design Excellence began with the new base design for the 161st RW at Phoenix Sky Harbor International Airport in
1995. At the onset of this project, the ANG saw the need to establish design standards for programs including base conversions, base relocations, and comprehensive base renovations. This was especially important as up to 15 different fi rms would be producing the site, infrastructure and facility designs.
This initial Design Standard document established broad based design parameters, but the ANG also learned that design standards for the ANG needed higher specifi city as well as more categories to achieve its goals.
In order to address these additional requirements, the Design Standards developed for the next new
ANG base at Scott Air Force Base expanded the depth and scope of the design standards. In addition to traditional design aesthetics, the Scott Standards focused on systems and components, site design, durable materials, and design standards for typical building “types” that occur at an ANG base.
Following the award-winning Scott AFB effort, the
Design Standards were further enhanced as part of the Reno, Nevada Projects. In this edition of the
Design Standards, front to back outline specifi cations standards were added to address minimum standards for building components and engineering systems. Elements such as sustainable design, force protection, interiors, and data communications were incorporated. Design standards for the site infrastructure systems were also addressed.
In the Reno Design Standards, more attention was given to the design process as well. The intent of the design process was to address ways that multiple A/E fi rms could collaborate and unify their design and technical documents. This section addressed means of inter-fi rm communication, use of uniform graphic standards as well as uniform specifi cations and technical document formats.
The national design standard has evolved through several major undertakings including the Chicago relocation, the Phoenix relocation, and the Reno comprehensive renovation to ensure consistent design excellence. The key elements of all Design Standards to date are included in Tab D of the Air National
Guard Project book.
The history of the evolution of Design Standards, and the comprehensive defi nition the ANG applies to “Design Excellence” underscores the ANG commitment to continually challenge its personnel and design consultants to raise the standards for all aspects of its real property. As a result, the ANG enjoys a reputation of producing facilities that stand the test of time, and provide maximum value to ANG personnel worldwide.
Brick, precast, metal roofs, and a strong entry element/building spine give the Ohio Air National Guard Squadron Operations a distinctive appearance.
Use of durable, practical materials on building interiors insure a quality appearance with minimal maintenance.
AIR NATIONAL GUARD DESIGN GUIDE
DMJMH+N 1.4
Purpose of the Design Guide
The Standards and Guidelines have been specifi cally written to integrate the National Design Standards of the Air National Guard with the project-specifi c requirements of the WVANG Martinsburg base. The purpose of this effort is to specifi cally tailor the Air
National Guard Design Guide for all construction required to successfully implement the conversion to
C-5 aircraft for the 167th Airlift Wing, Martinsburg, West Virginia. The ANG Design Guide is an existing document, now in its sixth edition, which is developed for ANG base relocations, expansions and other comprehensive ANG construction projects.
The Guide is intended to provide architectural and engineering teams with clear direction in the areas of building design and technical criteria. The underlying goal is to produce an overall base design that is unifi ed in both the visual image of the facilities, as well as the systems and components of the buildings and infrastructure. This is especially important given the likelihood that multiple architectural and engineering fi rms will undertake projects at the
WVANG. This Guide is intended to unify their collective efforts. To the extent that these fi rms will be working concurrently on different projects, this guide also makes recommendations relative to the design process in order to ensure that the various fi rms are coordinating their efforts.
Standards, by defi nition, seek to impose certain restrictions as well as establish specifi c levels of quality in materials selected. The text indicates these standards by utilizing a “bulleted” format.
Guidelines, utilizing a standard text font, provide a broader discussion of the execution of design with statements of expectation to assist the designers in developing facilities that meet the goals of the
WVANG.
It is not the intent to inhibit the creative process of a given design team, but rather to establish both specifi c direction (Standards) and general direction
(Guidelines). The A/E team is encouraged to advance alternate concepts in those cases where they believe a better design or solution is available. However, this must also be tempered against the overall requirement that the total long-range build-out of the base be unifi ed.
It is the intent of these Standards and Guidelines to set forth a framework that establishes a level of quality and compatibility for the WVANG facilities.
Project Challenges
One of the unique opportunities and challenges of this project is to achieve a level of consistency and coordination throughout all the projects in the relocation, in terms of design and construction of the building systems and components. Providing this consistency and coordination will provide seamless and integrated designs. This is particularly relevant to electrical, mechanical, and plumbing systems, which will enable the long-term maintenance of the facility to be streamlined and simplifi ed.
Competency of Selected A/E Firms
Each fi rm selected has promoted itself as knowledgeable and experienced in the design and construction of the facilities required. Therefore, the WVANG expects the fi rm to supplement any omissions found in the Design Guide. The WVANG expects the fi rm to advise them of all discrepancies and omissions, agreeing that some may require no change in design services/fees while some may be signifi cant enough to warrant a change in design services/fees.
January 2003 1.5
The Design Team
This Guide has been prepared by Hayes, Seay, Mattern & Mattern, Inc. along with their consultants including LPDA and DMJMH+N under contract to the National ANG Headquarters, Andrews AFB.
Hayes, Seay, Mattern & Mattern, Inc. (HSMM) is a full-service, multi-disciplined architectural and engineering fi rm founded in 1947 to provide comprehensive, professional A-E services, from planning through construction administration.
Utilizing philosophy of shaping a total environment, rather than merely enclosing a space, HSMM creates responsive design environments that express the aesthetic desires of our clients while remaining functional and cost effective. HSMM’s architectural and engineering teams work closely with our clients throughout the design process to ensure their overall satisfaction. Recognized throughout the eastern
United States for its skills in planning, programming and design, HSMM has earned a well-deserved reputation among military, government and private sector clients for performance, achievement and quality.
LPDA is a consulting fi rm offering services in landscape architecture and site planning since 1970.
As Landscape Architects and Site Planners, LPDA has developed an expertise in the planning and design of a variety of facilities both public and private.
LPDA is known for its work in parks and recreation, greenways, transportation design, downtown streetscapes, department of defense, higher education and historic properties. LPDA is proud of its ability to develop well designed, solidly based plans with a strong conceptual framework.
DMJMH+N is the architecture, engineering, and program and construction management organization formed by the joining of two established AECOM companies—Daniel, Mann, Johnson, & Mendenhall
(DMJM), and Holmes & Narver, Inc. (H+N). For more than 60 years, these two companies have shaped the environments in which we live and work, from the high-rise buildings that identify the skylines of the world’s most prominent cities, to the high-tech, science, education, and research facilities that help defi ne our future way of life.
In developing this Guide, HSMM has also received input from key parties involved in the WVANG.
The Base Supply/State Headquarters Building for the Nevada Air Guard uses natural lighting, covered building connections and simple roof forms to create a base theme.
AIR NATIONAL GUARD DESIGN GUIDE
DMJMH+N 1.6
Chapter 10 outlines specifi c standards and guidelines to be considered in designing the building systems, such as structural, plumbing, and electrical.
Chapter 11 outlines specifi c standards and recommendations to be followed in the hardscape elements of the site design as well as the criteria for site utilities.
Chapter 12 outlines specifi c standards and recommendations to be followed in the landscape design.
Chapter 13 provides specifi cations, outlining technical standards and criteria to be followed in all areas of the project.
Chapter 14 sets consistent requirements for the various A/E fi rm deliverables, including CADD standards, specifi cations and cost estimates.
Design Guide Organization
This Guide is organized in chapters, that when combined, provide the A/E fi rms with the information and tools necessary to provide a successful design solution.
Chapters 1 and 2 provide the history and background on the project, culminating in a conceptual master plan that shows the overall organization and locations of buildings, parking lots and street circulation.
Chapter 3 outlines the governing codes to be followed as well as the regulatory authorities that have jurisdiction over the project.
Chapter 4 provides specifi c recommendations for the design process to be followed by the A/E fi rms to ensure continuity of design.
Chapter 5 outlines specifi c standards and guidelines to be considered in site planning and building orientation issues.
Chapter 6 outlines specifi c standards and recommendations to be followed in the site utility design.
Chapter 7 outlines specifi c standards and guidelines to be considered in designing the building exteriors.
This chapter identifi es acceptable materials and colors to be used in the project. It also provides concepts of assemblies that present a unique image for 167th facilities.
Chapter 8 provides graphics and outlines standards and recommendations to be followed in designing interior and exterior building signage.
Chapter 9 outlines specifi c standards and guidelines to be considered in designing the building interiors, including furniture, lighting, and fi nishes.
January 2003 1.7
AIR NATIONAL GUARD DESIGN GUIDE
DMJMH+N 1.8
HSMM has recently developed a new master plan for the 167th Airlift Wing. The fi nal Master Plan is a stand-alone document, but key elements have been integrated into this Guide. The Master Plan is the baseline document for placement of roads, buildings, and the fl ightline. While it establishes fundamental relationships between these elements, development and alteration is expected as the building designs move forward. It is anticipated that individual parcels for each building will be refi ned in terms of building footprint, entry points, placement of parking, and landscape design. However, unless directed otherwise by the base, the overall site organization concepts relative to building setbacks, vehicular circulation hierarchy, pedestrian zones, and landscape zones should be followed.
Boundaries
The existing site is being increased in area and the main entry relocated. The new entry is accessed from a more public road and will provide a more suitable vehicular interface between the base and the surrounding community.
Circulation Hierarchies
Site circulation falls into three categories- primary, secondary, and pedestrian. Primary site circulation is provided by the main access road to the main gate and then continues as a spine through the existing base. Secondary roadways provide access to the fl ightline as well as around the industrial facilities to the south. Both primary and secondary roadways shall receive sidewalks and landscaping. Refer to the
Site and Landscape Design chapters of this Guide for more details.
Pedestrian paths are planned to connect all buildings, and to provide pedestrian routes that are off of the roadways. These paths generally parallel the roadway system, and provide pedestrian circulation to all portions of the site.
Buildings and Adjacencies
The Master Plan locations for project buildings are based on a combination of operational and image criteria established by the WVANG. Therefore, the general building locations, arrangement of functions, and site adjacencies depicted should be preserved.
Currently, the buildings located closest to the new entry will be the Headquarters, Credit Union and
BX as they are used most by the public. The Credit
Union and BX are located outside the main gate in order to allow unsecured access to these facilities.
The fi nal design of building entries, adjacent plazas, and other outdoor pedestrian areas should be coordinated with the building’s functional design as well as the overall Master Plan pedestrian circulation routes.
167th Airlift Wing, Martinsburg, West Virginia
January 2003 2.1
M A S T E R P L A N
DMJMH+N 2.2
Design Constraints
The Master Plan is in conformance with all known design constraints. Those constraints include Force
Protection issues, which have been identifi ed in the new Master Plan. These constraints must be adhered to as the individual building designs are carried forward.
Topographical constraints on the proposed site include sharp elevation changes between the airfi eld and the site entry. In some cases, it may be necessary to design buildings that are integrated into the slope.
Other constraints will likely emerge in working sessions with the building users. Additional constraints may include the following:
• Potential fl ight guidance systems interference problems associated with building surfaces parallel to the runway.
• 15240 mm (50’-0”) minimum separation between buildings and future facilities or additions.
• Proximity/dispersion of parking to facilities.
• Walking distances from peripheral facilities to the central dining/headquarters facility.
January 2003 2.3
DMJMH+N 2.4
Codes and Local Authorities
The design team shall adhere the following applicable codes and regulations in design of the WVANG facilities. Detailed code listings are provided in
Division I of the Outline Specifi cations chapter of the
Design Guide.
• Primary Codes include the current edition of
BOCA, Standard Plumbing Code (with local amendments), National Electrical Code, Standard
Gas Code, Standard Mechanical Code, and FAA design criteria.
• The A/E fi rms shall follow the Air National
Guard Tabs D & E and the ANG and Air Force
Engineering Technical Letters (ETLs.) In those cases where Tabs D & E and the ETLs confl ict with other codes, Tabs D & E and the ETLs shall govern.
• ANGETL 00-1 ANG Force Protection Planning and Design Standards references the July 2002 edition of the UFC 4-010-01 DoD Minimum
Antiterrorism Standards for Buildings. In addition, Air Force Manual 32-1071 on Security
Engineering shall be followed.
• Utility services shall conform to and coordinate with the standards of the local utility company.
Security: Force Protection It is a requirement that all Air National Guard
Installations be evaluated for security by applying the Force Protection Guide Standards, authored by the U.S. Air Force. These standards evaluate a given base against a threat assessment, which is determined by the individual base. The base is then evaluated against three categories:
• Comprehensive Planning
• Facility Site Design
• Building Systems
Comprehensive Planning deals with site selection and site organization, which is addressed in the Master
Plan. Facility Site Design addresses individual buildings, building orientation, roadways, landscape and utilities. Building Systems expands upon individual building design criteria, and includes building envelopes, building form, doorways, roofs, and mechanical, electrical, and structural systems.
The A/E teams shall become fully aware of the requirements outlined in the most recent Force
Protection Guidelines and shall integrate them into the design process. In addition, the A/E’s will need to work with the WVANG to prioritize requirements within the Force Protection Guide that are not fully in agreement with other portions of the Force Protection
Guide or with this Guide.
Sustainable Design
This project shall follow the U.S. Army Corps of
Engineers requirements for Sustainable Design
(ETL 1110-3-491 “Sustainable Design for Military
Facilities”) and the CABO Model Energy Code (1992 ed.). In addition, it is encouraged that buildings meet
LEED certifi cation standards. Key sustainable issues are described in the following:
Implementation
• Introduce sustainable strategies into the design process early. Incorporate and clearly state target requirements in the project construction documents.
• Use life cycle cost analysis in the development process.
• Incorporate fl exible design to reduce the waste generated from future remodeling.
167th Airlift Wing, Martinsburg, West Virginia
January 2003 3.1
G O V E R N I N G D E S I G N C O D E S
A N D C R I T E R I A
• Provide consumer operating and maintenance information for best performance in this project through careful planning, specifi cation, metering, job site management, and lab supervision.
Resource Effi ciency
• Minimize the amount of energy required during construction and operation by using resource effi cient construction techniques, building systems (including HVAC, electrical, water, lighting, heat-pumps and boilers), insulation, fi xtures, appliances, and controls.
• Optimize building performance and system control strategies (e.g. use occupancy sensors and air quality alarms).
• Comply with requirements for roof and wall insulation values, as well as shading coeffi cients for glazing in a building insulation assessment, according to the CABO Model Energy Code or
TAB D, whichever is more stringent.
• Employ solar and other renewable energy sources where feasible.
• Conserve water with systems that reduce consumption and recycle water through reclamation and treatment systems.
• Improve water quality when needed; (e.g.
eliminate lead-bearing products in potable water systems)
• Maximize the reduction, reuse, recycling, or composting of waste and scrap materials.
• Minimize waste, spillage, pilferage, spoil and misuse of building materials.
• Establish waste treatment and recycling centers.
Indoor Environmental Quality
• Supply adequate levels of ventilation and outside air.
• Provide a healthy environment by reducing or eliminating the use or release of toxins and pollutants during building construction or operation.
• Use low VOC paints, sealants, adhesives and other materials.
• Reduce indoor levels of Radon gas and formaldehyde emissions by following industry and USEPA guidelines on indoor environmental quality.
• Provide thermal comfort with a maximum degree of personal control over temperature and humidity (see EMCS in Building Systems chapter for more information).
• Control noise through sound absorbing material and equipment isolation.
• Control disturbing odors through contaminant isolation and careful selection of cleaning products.
• Enhance lighting quality by integrating natural and artifi cial lighting.
Transportation
• Install showers for use by bikers and walkers.
• Provide bike parking places at each building.
New Buildings
• Use site planning that maximizes solar energy, utilizes natural light and minimizes storm water runoff.
• The location of rooms within a building should be determined with consideration given to the amount of heat generated by activities or lost because of the room’s location. Spaces which are not occupied a great deal of the time, such as corridors, wall closets, mechanical equipment rooms, laundries and garages, can be kept at lower temperatures, and placed on the north wall of the building where feasible.
• South-facing courtyards can be used to create protected outdoor spaces, giving the site a more favorable microclimate for year-round activities.
• Use the design of the building to act as an effi cient solar collector during cold winter months and as a cooling chamber during periods of hot weather.
• Use planting to assist the building. Every type of tree, shrub and ground cover affects the thermal response of a building.
AIR NATIONAL GUARD DESIGN GUIDE
DMJMH+N 3.2
• The increased use of interior natural light can reduce energy usage. Refl ective surfaces can be used to increase interior light levels.
• Natural ventilation of new buildings will promote passive cooling in the summer. To facilitate the exhaust of warm air, dampered vents should be located at high points in the building. If natural thermal pressure is not enough to produce adequate ventilation, fans can be used to assist. Attic fans will more quickly remove hot air that accumulates during the day.
Buildings may act as large ducts and should be designed with options for through-ventilation to occur by catching breezes from the west-northwest.
• Develop service yard and parking lot layouts to minimize the amount of paved surfaces.
January 2003 3.3
DMJMH+N 3.4
Architectural Teams/Building Design
Though the Guide is intended to provide architectural and engineering design fi rms with specifi c direction on the design of their respective facilities, it is also intended to allow the architects interpretive freedom in the development of their design solutions. This freedom is in potential confl ict with the overall project goal of producing a cohesive architectural design with the standardization of materials, construction techniques, and fi nishes for the entire site and facilities, not just the end products of each architectural/engineering team. This goal is especially important as the distribution of the building projects may be random, and a group of buildings may be designed by different architectural/engineering fi rms.
In order to ensure a cohesive look of the overall facility designs, ANG/CEC Headquarters will have fi nal design approval of the building designs. It is also noted that compliance with the guide may not necessarily ensure approval of the given solution if it is not in harmony with the designs of facilities for the balance of the project. Firms are encouraged to engage the WVANG at the earliest possible phases of development of their design concept. If two or more architectural/engineering fi rms are assigned projects concurrently, they will be required to engage in dialog with each other. This will be especially important if their respective projects are in close proximity to each other.
Project Books
All facilities, site work, and infrastructure components of the project will have Project Books
(Tabs A and B) prepared for the use of the design team. These will likely be prepared by the Base
Civil Engineering offi ce of the WVANG, or by other architectural/engineering fi rms. These documents include detailed programming information for a given facility. They detail space requirements, internal building functional areas and critical functional adjacencies. These books are key documents, as they validate the allowable areas for a given facility according to the government “category code” space allocation system.
Though these documents are extremely useful in terms of raw data, they should not be seen as a substitute for the architect’s normal programming and client familiarization activities. This is especially true of the space adjacency diagrams within the Project Book (Tab A). Though many of these relationships are fi xed and cannot be changed, many others are subject to revision based on specifi c functional requirements and operational procedures. In order for a given design fi rm to fully understand these specifi c user requirements, the design fi rms are required to meet with and observe the individual users’ operations during both the usual daily operation and a typical weekend training exercise. These monthly activities will show the full unit population utilizing existing facilities, and will enable the design fi rms to understand both functional and space requirements in greater detail.
167th Airlift Wing, Martinsburg, West Virginia
January 2003 4.1
C O O R D I N A T I O N A N D
P R O J E C T A P P R O A C H D E S I G N P R O C E S S R E C O M M E N D A T I O N S
Project books are formed by combining all Tabs: A, B, C, D, E (Design Guide), F, G and other Tabs as referenced. The A/E fi rms shall use this Design Guide
(Tab E), in combination with the others.
Tab A - Space Criteria
Tab B - Site Description
Tab C - Design Objectives & Procedures ANG ETL 94
Tab D - ANG Design Policy ANG ETL 01-1
Tab E - Design Guide
Tab F - Site Parcels
Tab G - As Assigned
The Design Guide (Tab E) provides a level of quality, standardization, and aesthetic standards. In those instances where the Design Guide and the remaining
Tabs are in confl ict, the A/E fi rms should seek clarifi cation from WVANG and the contracting offi cer.
Engineering
The requirement that the architectural component of the project be unifi ed is equally important when considering the engineering element of the total project. As with the architecture, it is required that the various civil, structural, mechanical/fi re protection/ plumbing & electrical consultants or in-house members of the architectural fi rms interface with the Base Civil
Engineering (BCE) offi ce at the beginning of the project. Though guidance is provided in this Design
Guide, these meetings will help to ensure that teams are producing designs that are compatible with base standards. The Outline Specifi cation of the Design
Guide sets the general groundwork to establish this uniformity and standardization. However, as with the architectural design, opportunities exist for interpretation, and it remains a requirement that the various engineering approaches to facilities be consistent and unifi ed. This is especially important in the areas of equipment specifi cation and building systems.
Site Parcels/Match Lines
Each individual project will have a boundary established in the Statement of Work or Contract
Requirements Conference (CRC). For stand-alone projects, the BCE shall provide accurate existing site condition maps indicating current utilities and buildings. In those instances where this information is not available, the scope of survey work for the project will be expanded to include this information.
In addition, the scope of such survey work will extend 6096 mm (20’-0”) minimum beyond the project boundary established in the Statement of
Work or CRC. The purpose of this overlap is to insure adequate coordination with the surrounding site conditions.
In those instances where A/E fi rm is working on a site adjacent to a site being worked on by another A/E fi rm, traditional “match lines” of each respective
A/E’s site shall overlap the adjacent parcel by a minimum of 6096 mm (20’-0). In the case where an A/E is working on a site adjacent to a recently designed and constructed project, the match line of the new work shall extend 6096 mm (20’-0”) into the recently completed adjacent project. The base map for this overlap into the adjacent project shall be the as-built drawings.
Common Specifi cations & Graphics
The A/E fi rms providing services to the WVANG will be required to use the same specifi cations and graphics on their projects. Outline specifi cations and document standards are provided in detail, in
Chapters 13 and 14 of this Guide. These are outline specifi cations only with a focus on quality and systems. Actual common specifi cations and document standards will need to be developed by the A/E fi rms in coordination with the ANG.
AIR NATIONAL GUARD DESIGN GUIDE
DMJMH+N 4.2
Procurement/Standardization
Use of common systems and components will benefi t the WVANG in terms of long-term maintenance costs and consistency of systems and components.
However, use of common design standards and specifi cations does not ensure total consistency from building to building or general contractor to general contractor. In order to bring a higher level of consistency and standardization to the overall project, A/E fi rms shall work with the WVANG in establishing the allowable level of specifi city in the contract drawings and specifi cations. This level of specifi city must be determined by the contracting authorities and the applicable rules and regulations that the procurement process will allow. For example, A/E fi rms should seek guidance as to the policy on substitutions as well as vendor specifi c specifi cations.
Certain key elements on WVANG projects must be provided by a single manufacturer. These items include the following:
• Locks
• EMCS Systems
• Fire Alarm Systems
• Systems Furniture
• IDS / Security Systems
The Base Civil Engineering offi ce will provide acceptable manufacturers for all key components.
January 2003 4.3
DMJMH+N 4.4
Context
Martinsburg- Berkeley County
Berkeley County is the second oldest county in West
Virginia. Created in 1772 from the northern third of
Frederick County Virginia and named for Norbourne
Berkeley, (Baron Boutetort) Colonial Governor of
Virginia from 1768 to 1770.
Martinsburg, the county seat, was founded in 1778, by General Adam Stephen who named it in honor of
Colonel Thomas Bryan Martin, a nephew of Lord
Fairfax. It was incorporated by act of the legislature on March 30, 1868.
Martinsburg is situated along the old Cumberland
Trail which was a major route during the 1700’s and
1800’s to points west and changed hands several times during the Civil War. Harpers Ferry, which is famous for John Brown’s attempted taking of the
Federal Arsenal, lies only minutes from Martinsburg.
There are many Historical Landmarks within a 30 minute driving distance such as Antietam Battle
Field in Sharpsburg, Maryland, Shepherdstown, West Virginia, the testing ground for the steamboat by James Rumsey, and Front Royal, Virginia which is famous for the Blue Ridge Mountains and Skyline
Drive.
New industries locating here, teamed with established industries, indicate that Martinsburg- Berkeley
County area is on the threshold of its greatest era. City of Martinsburg
167th Airlift Wing, Martinsburg, West Virginia
January 2003 5.1
S I T E P L A N N I N G
Environmental Issues
The WVANG site has natural and man- made environmental conditions to be considered. In addition to the standard climatic information provided in the master plan, the A/E teams must design for the site’s specifi c micro climate. Of particular concern are snow loads both in terms of roofi ng construction and the placement of the snow once it falls from the roof. Shading and orientation issues will be important in planning and building design as ice can form to the North for extended periods of time. Rainfall can be very heavy making proper roof drainage and storm water discharge essential.
Man-made environmental concerns include noise generated by the runway and how this will effect the base’s neighbors.
Landscape features include a considerable grade differential. A high point near the new gate slopes considerably to the fl ight line.
Functional Relationships
Master Plan Level
As noted previously, the Master Plan establishes key building adjacencies as well as the primary layout for streets and site infrastructure. These relationships should be considered when fi nalizing the overall site organization. Building footprints and adjacent parking areas are expected to be modifi ed as the designs evolve.
Building Level/Project Books
The individual building project books (Tabs A &
B) will provide A/E fi rms with programming data as well as guidance on key adjacencies within a given building. This will serve as a baseline in the development of conceptual design. This effort should be complemented by the A/E’s meeting with the individual building user groups in order to better understand the basis (and potential fl exibility) of the programmed areas and adjacencies.
Existing Site Preservations
At the present time, the existing site does not contain any known historic, archeological, or other signifi cant items that must be preserved as part of the expansion.
Certain WVANG artifacts such as stationary aircraft, will be preserved and reused. The A/E fi rms should verify with the WVANG if other artifacts exist for reuse such as either lobby exhibits or site design components.
Apron and Runway
Taxiway Setbacks and Height Restrictions
The A/E teams shall be aware of clearances and setbacks that must be maintained in terms of buildings/obstacles in relation to the runway, as well as minimum clearances between aircraft, for taxiways, and aircraft and adjacent buildings.
Additional information is available from the master plan study regarding height limitations and setbacks in the areas adjacent to the WVANG fl ight line. The
A/E teams shall become fully aware of the apron and runway/taxiway setbacks as well as building and obstacle height restrictions as part of the design process. Any deviations from the Master Plan layout in relation to the setbacks and clearances shall be reviewed with WVANG to ensure conformance with both Air Force and Federal Aviation Authority criteria.
Flightline/Apron Access
Entry points for both vehicles and personnel will be required along the secure perimeter fence adjacent to the fl ightline. The fl ightline area should be entirely secure. To the extent possible, the buildings that face the fl ightline should be used to form a large portion of the secure perimeter, with additional fencing running between the buildings.
Fencing adjacent to the fl ightline should not be solid, and sight lines onto and through the secure perimeter to the fl ightline are to be maximized. The A/E fi rms and their civil engineers will need to coordinate with
AIR NATIONAL GUARD DESIGN GUIDE
DMJMH+N 5.2
the individual building users adjacent to the fl ightline to determine the exact quantity and location of access points to the fl ightline (These access points must all be coordinated with MSCAA/FAA requirements.)
This includes access points through the secure perimeter fencing as well as entry points to the fl ightline through the buildings facing the fl ightline.
Environmental Issues
Open Space
Open space that exists on the site is to be fully developed as opposed to being left empty. All undeveloped land is to be graded, developed for drainage, and have natural grass. Development solutions must eliminate Foreign Object Damage
(FOD) and dust migrating to the airfi eld. The overall landscape design must allow for infi ll of open areas.
See the Landscape Design chapter for more detailed requirements of the site’s open spaces.
Stormwater Runoff
As is standard practice in the industry, a Storm Water
Pollution Prevention Plan (SWPPP) will be required to ensure that all construction activity will conform to the requirements of the Regional Water Quality
Control Board. The SWPPP will incorporate the requirements drawn from both adjacent cities as well as other sources, based on the requirements of the particular project. Mitigations to be implemented shall include, but are not limited to, the following:
• Inlet protection for all inlets draining constructions areas.
• Silt fencing and/or fi ber rolls to prevent sediment from leaving the site in storm runoff.
• Cover stockpiled material and direct storm runoff around stockpiles.
• Designated wash down areas to remove excess soil from equipment prior to leaving the site.
• Stabilized construction entrances.
• Regular sweeping of adjacent streets.
• A monitoring program to ensure that all requirements are implemented.
Silt Fencing
In order to eliminate the environmental impact of base grading and construction projects, silt fencing shall be employed in order to prevent the migration of suspended soil particles into the storm water system.
An economical sediment control fabric fence may be temporarily installed (wood staked) at the perimeter of the project site (or where the base storm water course comes in contact with…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .