138 FW Overhead Garage Door Operator Replacement Federal contract opportunity
Solicitation number
W50S8U-23-Q-0001
Issued by
Department of the Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to 138 FW Overhead Garage Door Operator Replacement, newest first.
File Type Posted
Site Visit Slides Overhead Garage Door Operators -Amendment V2.pptx PPTX presentation
Site Visit_Redacted.pdf PDF
23-Q-0001-0004.pdf PDF
Pre-Quote RFI OH Door Operators 27Jun23.pdf PDF
Pre-Quote RFI OH Door Operators 22Jun23.pdf PDF
23-Q-0001-0001.pdf PDF
SOW- B025 and B329 Overhead Door Operator Replacement V4.pdf PDF
23-Q-0001-0002.pdf PDF
23-Q-0001-0003.pdf PDF
RFI Template Overhead Garage Door Operators.docx DOCX document
SOW- B025 and B329 Overhead Door Operator Replacement V3.pdf PDF
23-Q-0001.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MSA Phase 3 and Falcon Ave Concrete Repair

AT TULSA ANG BASE, OK

Site Visit/ Conference 21 June 2023

138 MSC, TULSA ANG BASE, OK

INTRODUCTION

CMSgt Amanda Lonsdale – Contracting Officer

MSgt Joshua Kingori – Contracting Specialist

Major Patrick Deering – Deputy Base Civil Engineer

SSgt Jayson Potteiger –Construction Manager

SYNOPSIS

MSA Phase 2 and Falcon Ave Concrete Repair at Tulsa Air National Guard Base, OK.

W50S8U-23-B-0002 Disclosure of magnitude is $250,000 and $500,000 IAW FAR 36.204(d) A firm-fixed price contract will be awarded.

Award is set aside for small businesses (NAICS – 237310) Small Business Size Standard is $45 Million The contract will be awarded based on price and price related factors.

If you need an additional site visit, send request to 138.FW.MSC@us.af.mil

SOLICITATION, PLANS

& SPECIFICATIONS

On the web: https://sam.gov/

- Solicitation Plans and Specifications Questions & Answers document Site Visit presentation Amendments check regularly & refresh web page

RFQ

In the request for quotation (RFQ), FAR Part 13, Quotations or offers shall be evaluated on the basis established in the solicitation.

Award is given to the lowest responsible offeror The Government anticipates making award without discussions

WHAT IS THE CONTRACT PERIOD

Construction period is 90 calendar days after receiving the Notice to Proceed

SOLICITATION PACKAGE IN ACCORDANCE WITH SECTION 00010 NOTES, NOTE 11

Offer, Standard Form (SF) 1442 front and back signed Section 00010 Line Items- all items must be priced Section 00600, Representations and Certifications, completed and return only additional certifications found in this section In addition, the offeror must have entered current and complete data within the past year in Online Representations and Certifications at https://www.sam.gov see 52.204-8 in solicitation Also please fill out the 52.204-24,25 and 26 ALERT: If you are registering a new entity in SAM.gov, you must provide an original, signed notarized letter stating that you are the authorized Entity Administrator before your registration will be activated.

SOLICITATION PACKAGE IN ACCORDANCE WITH SECTION 00010 NOTES, NOTE 11 - Continued When completing the “Offeror” portion of the SF 1442 (Blocks 14 – 20), an official having the authority to contractually bind the company must sign the SF 1442 in accordance with FAR 4.102. One copy of the SF1442 is required to have an original signature. Section 00010 Line Items- all items must be priced All amendments to the solicitation must be acknowledged.

Quotes can be emailed to the contracting office 138.FW.MSC@us.af.mil. E-mailed quotes must be in adobe acrobat (.pdf) format. Subject line to include “W50S8U-23-Q-0001”.

SOLICITATION PACKAGE IN ACCORDANCE WITH SECTION 00010 NOTES, NOTE 11 - Continued ALL ITEMS ON THE PREVIOUS SLIDES ARE IN THE SOLICITATION INSTRUCTIONS. IT IS THE RESPONSIBILITY OF THE BIDDER TO MAKE SURE THAT THEIR BID CONFORMS TO THE SOLICITATION.

QUOTES DUE DATES

W50S8U-23-Q-0001 - Quotes are due 2:00 P.M. (CST) 11 July 2023 Quote must be signed by officer of your company emailed to the contracting office 138.FW.MSC@us.af.mil, by due date. (account for technical, and email transmission time) Confirm Receipt

IMPORTANT REMINDERS

W50S8U-23-Q-0001 Questions concerning these project must be received by 1300hours (CST) on 21st June 2023.

submitted in writing only via email to:

138.fw.msc@us.af.mil DO NOT CALL TECHNICAL PERSONNEL THIS WILL DELAY GETTING AN ANSWER AND COULD RESULT IN DISQUALIFICATION Contractor must submit information listed in Section 00100 Notes, paragraph 3.2 in order to gain access to installation for dropping off bids. Delivery must allow for vehicle inspection time at gate.

Wage determination OK20230053 , Dated 06/02/2023, Building is applicable

ANSWERS TO QUESTIONS

All questions, on a non-attribution basis, and the answers will be posted to the web site https://www.sam.gov If necessary addendums, issued by an amendment, will also be posted Check web site regularly and don’t forget to refresh web page!!

IMPORTANT

OFFERORS ARE STRONGLY CAUTIONED TO CAREFULLY READ THE REQUIREMENTS OF THE SOLICITATION AND COMPLY ACCORDINGLY

HELPFUL WEBSITES

https://www.sam.gov Both the contracting opportunities and wage determinations modules https://www.aptac-us.org

Questions ???

Site Visit Follows This Briefing image1.wmf image2.wmf