Pre-Quote RFI OH Door Operators 27Jun23.pdf

PDF 109 KB Posted

Attached to
138 FW Overhead Garage Door Operator Replacement Federal contract opportunity
Solicitation number
W50S8U-23-Q-0001
Issued by
Department of the Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to 138 FW Overhead Garage Door Operator Replacement, newest first.
File Type Posted
Site Visit Slides Overhead Garage Door Operators -Amendment V2.pptx PPTX presentation
Site Visit_Redacted.pdf PDF
Site Visit Slides Overhead Garage Door Operators -Amendment V2.pptx PPTX presentation
23-Q-0001-0004.pdf PDF
Pre-Quote RFI OH Door Operators 22Jun23.pdf PDF
23-Q-0001-0001.pdf PDF
SOW- B025 and B329 Overhead Door Operator Replacement V4.pdf PDF
23-Q-0001-0002.pdf PDF
23-Q-0001-0003.pdf PDF
RFI Template Overhead Garage Door Operators.docx DOCX document
SOW- B025 and B329 Overhead Door Operator Replacement V3.pdf PDF
23-Q-0001.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: RFI No. RFI QUESTION GOVERNMENT RESPONSE

6/20/2023 1 Due to the very limited clearance on building 025, can we come out and perform a dry fit where we confirm the openers we are supplying will fit in the limited spacing?

Yes, email the 138th contracting office to schedule the dry fit.

Explain the following: pre or post contract award, timing, and any other pertinent information regarding the dry fit.

6/20/2023 2 Upon inspection we saw multiple doors with frayed cables and worn-out hinges, rollers, etc. Should these be included in the scope of work to be replaced?

The contractor shall install all associated parts necessary to provide a fully functional finished product.

6/20/2023 3 Who will be responsible for shutting off power to the garage door openers on the day of installation? Most doors we saw had shut off switches but in the event we find one that doesn’t, how will that affect our workday?

The 138th will shut off power if and when necessary. The contractor shall verify ahead of time if power needs to be shut off and coordinate this through the 138th project manager.

6/20/2023 4 Will extensions to the POP be granted due to weather delays?

Yes, extensions to POP will be granted in the case of weather delays.

6/20/2023 5 Will the Government provide bathroom facilities for Contractor, or will porta-potties need to be considered in our bid?

Contractors are responsible for providing their own bathroom facilities on site.

6/20/2023 6

Will the Government be providing access to any utilities to the Contractor for performance of work - the breakers that kill power to the existing motors before we can remove them?

Yes, access to the breakers for existing motors will be granted.

Please coordinate with the project manager before initial shutoff to allow communication to those possibly effected by the lack of power

6/20/2023 7

May the Contractor invoice for materials upon purchase and submission of purchase order? If not, may the Contractor invoice for materials upon arrival of materials to job site?

Contractor may invoice for approved materials once they are onsite.

Pre-Quote RFI Log for OH Door Operators

6/23/2023 8

On sheet SHTNO- 10 doors labeled S, it says replace openers with chain auxiliary chain. It requests 1/3hp and 110v. The question is: Those are large heavy doors so it is not recommended to do anything less than 1/2hp, and has it been verified that it is in fact 110V? The power disconnects up near the existing operators are more consistent with 3 phase power which is typically 230/460. I have a hard time believing the existing openers are 110V, but maybe you are running all new power out there and changing it to 110V? Fairly confident someone only checked the one door in room 113 that is not listed for replacement and assumed the rest of them are 110v like that one is.

That is correct, the contract asks for minimum 1/3 hp and 110v.

The voltage has been checked by 138th personnel. With that being said, contractor shall verify voltage as well.

6/23/2023 9

Sheet SHTNO-All doors labeled as S to replace tension wires and springs on all doors. To verify that you want to replace both cables and a pair of torsion springs on each door? Do you have a measurement of the springs that are on those doors? Wire size, length, diameter, and diameter of the shaft?

Correct, replace exisiting cables and torsion springs on each door.

Contractor shall verify measurement of springs on the doors listed.

If another site visit is needed, contact the 138th Contracting office for scheduling.

6/23/2023 10

Sheet SHTNO- In room 112, that existing operator is an explosion resistant opener. It is an entirely different opener than anywhere else in that building. Does room 112 need to be replaced with a new explosion resistant opener or has that room been repurposed since its original conception and can now have a standard opener that we are putting on the other 9 doors listed S?

No, room 112 does not need to be replaced with a new explosion resistant opener. The room has been repurposed and can have a standard opener.

6/23/2023 11

Sheet B329 they have door 1 listed as replace with new matching door: By matching are you requiring the same brand and model as existing or can it be a door with equal or greater specs?

The door must be replaced with equal or greater specs. Door one does not have to match brand and model of existing, matching is referring to the appearance/color.

6/23/2023 12

Sheet B329 doors 2-5-demo safety edges back to source and install new safety eyes/motion sensors. Do you want photo eyes and motion sensors? Motion sensors are where motion is detected and it automatically opens the door.

Safety eyes are when the door is coming down, it will reverse when they are crossed.

With the removal of the existing safety edges, there will be a need for new safety sensors. The contractor shall install a new safety

6/23/2023 13

Is there a preferred format for the proposal?

We have posted as a request for quote - there is one line item that needs to be priced - use the SF 1442 titled W50S8U-23-Q-0001 also you need to acknowledge all amendments.

Sheet1

File details come from the government source that posted it. Updated .