Site Visit Slides UPS B230.pdf
PDF 154 KB Posted
- Attached to
- B230 Uninterrupted Power System (UPS) Federal contract opportunity
- Solicitation number
- W50S8U-21-Q-0008
- Issued by
- Department of the Army National Guard
About this file
This combined synopsis and solicitation requests quotes for an uninterrupted power system and related preventative maintenance services at an Oklahoma Air National Guard facility. Small businesses are invited to provide quotes to replace the current UPS, conduct a site survey to evaluate capabilities, engineer replacement options, and provide user training, preventative inspections, and emergency support. Quotes are due by 27 September 2022 and shall be submitted electronically to 138.FW.MSC@us.af.mil. The base period of performance for UPS installation is 90 days from award, and maintenance option years run consecutively thereafter. Evaluation will consider technical compliance, price, and past performance.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pre-Bid RFI B230 UPS 09-23-2021.pdf | ||
| UPS 230 As Built A107(a).pdf | ||
| Pre-Bid RFI B230 UPS 09-21-2021.pdf | ||
| UPS230 Sign In Sheet_Redacted.pdf | ||
| UPS B230 Site Visit Minutes.pdf | ||
| 21-Q-0008 UPS 230 Updated 30 August 2021.pdf | ||
| 1. Bldg 230 UPS SOW.pdf | ||
| 21-Q-0008 UPS 230 Combo.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B230 Uninterrupted Power System
AT TULSA ANG BASE, OK
Pre-Quote Conference 14 September 2021
138 MSC, TULSA ANG BASE, OK
INTRODUCTION
SMSgt Amanda Lonsdale – Contracting Officer
MSgt David Hugueley – Contract Specialist
SMSgt John Mackey– Technical Representative
SYNOPSIS
•B230 UPS at Tulsa Air National Guard Base, OK.
W50S8U-21-Q-0008 •A firm-fixed price contract will be awarded.
•Award is set aside for small businesses (NAICS – 335999) •Small Business Size Standard is 500 Employees The contract will be awarded based on (i) technical capability of the item offered to meet the Government requirement; (ii) price; (iii) past performance Technical and past performance, when combined, are approximately equal to price.
See FAR 52.212-2
SOLICITATION, PLANS
& SPECIFICATIONS
• On the web: www.sam.gov/
- Solicitation
– Questions & Answers document
– Pre-Quote presentation
– Amendments
• check regularly & refresh web page http://www.sam.gov/
RFQ
• This is a Request for Quotes where quotes will be e-mailed to 138.FW.MSC@us.af.mil mailto:138.FW.MSC@us.af.mil
WHAT IS THE CONTRACT
PERIOD
Deliver installed product and service within 90 calendar days after date of contract
Due to current supply chain issues nationwide, if your period will be longer than 90 days please let us know in advance and include that in your quote.
QUOTE PACKAGE IN ACCORDANCE WITH
Combined Synopsis/Solicitation
• Can provide quote on standard commercial quote format used by company.
• The quoter must have entered current and complete data within the past year in Online Representations and Certifications at https://www.sam.gov see 52.204-8 in solicitation
Make sure to fill out provisions 52.204-24 and 52.204-26
• ALERT: If you are registering a new entity in SAM.gov, you must provide an original, signed notarized letter stating that you are the authorized Entity Administrator before your registration will be activated.
QUOTE PACKAGE IN ACCORDANCE WITH
Combined Synopsis/Solicitation
• ALL ITEMS ON THE PREVIOUS SLIDES ARE
IN THE SOLICITATION INSTRUCTIONS. IT
IS THE RESPONSIBILITY OF THE QUOTER
TO MAKE SURE THAT THEIR QUOTE
CONFORMS TO THE RFQ REQUIREMENTS.
Quote DUE DATES
• W50S8U-21-Q-0008 - Quotes are due by the date on the sam.gov solicitation Currently set to 1100 hours on 27 September.
• Quotation must be signed by officer of your company
IMPORTANT REMINDERS
•Questions concerning these project must be received by 7 business days prior to the date/time listed on the official sam.gov solicitation
HELPFUL WEBSITES
https://www.sam.gov https://www.aptac-us.org
HOW QUESTIONS WILL BE
HANDLED
• Questions must be submitted in writing only via email to:
138.fw.msc@us.af.mil
• DO NOT CALL TECHNICAL PERSONNEL THIS WILL
DELAY GETTING AN ANSWER AND COULD RESULT
IN DISQUALIFICATION
mailto:138.fw.msc@us.af.mil
ANSWERS TO QUESTIONS
• All questions, on a non-attribution basis, and the answers will be posted to the web site https://www.sam.gov
• If necessary addendums, issued by an amendment, will also be posted
• Check web site regularly and don’t forget to refresh web page!!
IMPORTANT
QUOTERS ARE STRONGLY
CAUTIONED TO CAREFULLY
READ THE REQUIREMENTS OF
THE SOLICITATION AND
COMPLY ACCORDINGLY
Questions ???
Site Visit Follows This Briefing
| �B230 Uninterrupted Power System� AT TULSA ANG BASE, OK |
| INTRODUCTION |
| SYNOPSIS |
| SOLICITATION, PLANS�& SPECIFICATIONS |
| RFQ |
| WHAT IS THE CONTRACT PERIOD |
| QUOTE PACKAGE IN ACCORDANCE WITH Combined Synopsis/Solicitation |
| QUOTE PACKAGE IN ACCORDANCE WITH Combined Synopsis/Solicitation |
| Quote DUE DATES |
| IMPORTANT REMINDERS� |
| HELPFUL WEBSITES |
| HOW QUESTIONS WILL BE HANDLED |
| ANSWERS TO QUESTIONS |
| IMPORTANT |
| Questions ??? |
File details come from the government source that posted it. Updated .