Updated Attachment 2 Statement of Requirement - Door Hardware.pdf
PDF 210 KB Posted
- Attached to
- 179 CW Door Core and Hardware Replacement Federal contract opportunity
- Solicitation number
- W50S8R24R5040
About this file
This document is a Statement of Requirement for a Door Hardware Replacement project at the 179th Cyberspace Wing in Mansfield, Ohio. The contractor is required to replace the existing 6-pin door hardware with a new 7-pin BEST Access System CORMAX interchangeable mortise cylinder and lever hardware. Key requirements include providing a 7-pin key bitting chart, installing the new hardware, providing additional keys and key blanks, and turning in the existing 6-pin cores.
The related Federal Contract Opportunity W50S8R24R5040 is a Request for Quotation (RFQ) for the Door Core and Hardware Replacement project, issued as a 100% small business set-aside. Evaluation factors include technical acceptability, price, delivery/installation time, and supplier performance risk. The Government intends to award a single Firm Fixed Price contract to the offeror deemed responsible and providing the best value. Offers are due by 10:00 A.M. EST on September 16, 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Lever Set.jpg | JPG image | |
| Lever Mortise Plate_Latch.jpg | JPG image | |
| Mortise Cylinder Plate_Deadbolt_Latch.jpg | JPG image | |
| QUESTION AND ANSWER.pdf | ||
| Updated W50S8R24R5040 Combined Synopsis.pdf | ||
| Mortise Cylinder.jpg | JPG image | |
| Attachment 2 Statement of Requirement - Door Hardware.pdf | ||
| Attachment 1 Clauses and Provisions.pdf | ||
| W50S8R24R5040 Combined Synopsis.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
179th Cyberspace Wing
Mansfield angb ohio
1.0 PROJECT TITLE. Basewide Core and Hardware Replacement
2.0 CURRENT SITUATION: Update door hardware/cores/ key system from a six-pin to seven-pin system. The new system is to be compatible hardware with the existing Seven-pin BEST Access system CORMAX interchangeable mortise cylinder hardware.
3.0 STATEMENT OF REQUIREMENT: The contractor shall provide the Government with the following:
3.1 Provide Seven-pin key bitting chart for existing buildings and future expansion of 40 buildings.
3.1.1 Bitting system will include an all-base master key, an all-base control (core removal) key, individual building master key, and 30 bitting options per building.
3.1.2 Submit bitting charts to Contracting officer prior to the completion of work.
3.1.2.1 Complete list of all keys (e.g., AA01, BA02, etc.).
3.1.2.2 Complete list of all bitting cuts (e.g., AA01 – 5829152, BA02 – 7429634).
3.1.2.3 Tabulation showing which key fits which door.
3.2 Provide and install hardware and cores in existing doors:
3.2.1 Purchase compatible Seven-pin BEST Access system CORMAX interchangeable mortise cylinder and core. Do not stamp key number on core.
3.2.2 Purchase compatible Seven-pin BEST Access system CORMAX lever interchangeable hardware and cores. Do not stamp key number on core.
3.2.3 Provide seven additional keys for master keys and control keys for removable cores.
Stamp each key with appropriate key control symbol and “U.S. Property – Do Not Duplicate”. Do not place building or room number on key.
3.2.4 Provide four additional change keys for each interchangeable core. Stamp each key with appropriate key symbol and “U.S. Property – Do Not Duplicate”. Do not place building or room number on key.
3.2.5 Furnish a quantity of key blanks equal to 20 percent of the total number of change keys.
Stamp each key with “U.S. Property – Do Not Duplicate”.
3.2.6 Install new hardware to existing doors.
3.2.7 Color: Satin Stainless Steel
3.3 Contractor shall turn in existing six-pin cores to Base Civil Engineering.
3.4 Building map of replaced cylinder locations will be provided once project has been awarded.
4.0 The following will be required of all contractors (prime or sub) personnel who will require base access to perform services related to this requirement:
4.1 Base Access Clearance Process: completion and submission of Security Access Form, which is submitted for background check; clearance is required for base access approval (this is accomplished post-award).
4.2 Antiterrorism Training: See attachment related to antiterrorism training requirements (accomplished post-award).