This document is an Attachment 2 - Statement of Requirement for a federal contract opportunity related to a Basewide Core and Hardware Replacement project for the 179th Cyberspace Wing of the Department of the Air Force.
The contractor is required to provide a seven-pin key bitting chart for the existing buildings and future expansion, install compatible seven-pin BEST Access system CORMAX interchangeable mortise cylinder and core hardware, provide additional keys and key blanks, and install the new hardware on existing doors. The contractor must also turn in the existing six-pin cores to the Base Civil Engineering. A site visit is highly encouraged, but not required. The contract will be awarded as a Firm Fixed Price contract to the responsible offeror providing the best value based on technical acceptability, price, delivery, and supplier performance risk assessment. Offers are due by 10:00 A.M. EST on September 16, 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Mortise Cylinder Plate_Deadbolt_Latch.jpg | JPG image | |
| QUESTION AND ANSWER.pdf | ||
| Updated W50S8R24R5040 Combined Synopsis.pdf | ||
| Mortise Cylinder.jpg | JPG image | |
| Updated Attachment 2 Statement of Requirement - Door Hardware.pdf | ||
| Lever Set.jpg | JPG image | |
| Lever Mortise Plate_Latch.jpg | JPG image | |
| W50S8R24R5040 Combined Synopsis.pdf | ||
| Attachment 1 Clauses and Provisions.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
179th Cyberspace Wing
Mansfield angb ohio
1.0 PROJECT TITLE. Basewide Core and Hardware Replacement
2.0 CURRENT SITUATION: Update door hardware/cores/ key system from a six-pin to seven-pin system. The new system is to be compatible hardware with the existing Seven-pin BEST Access system CORMAX interchangeable mortise cylinder hardware.
3.0 STATEMENT OF REQUIREMENT: The contractor shall provide the Government with the following:
3.1 Provide Seven-pin key bitting chart for existing buildings and future expansion of 40 buildings.
3.1.1 Bitting system will include an all-base master key, an all-base control (core removal) key, individual building master key, and 30 bitting options per building.
3.1.2 Submit bitting charts to Contracting officer prior to the completion of work.
3.1.2.1 Complete list of all keys (e.g., AA01, BA02, etc.).
3.1.2.2 Complete list of all bitting cuts (e.g., AA01 – 5829152, BA02 – 7429634).
3.1.2.3 Tabulation showing which key fits which door.
3.2 Provide and install hardware and cores in existing doors:
3.2.1 Purchase compatible Seven-pin BEST Access system CORMAX interchangeable mortise cylinder and core. Do not stamp key number on core.
3.2.2 Purchase compatible Seven-pin BEST Access system CORMAX lever interchangeable hardware and cores. Do not stamp key number on core.
3.2.3 Provide seven additional keys for master keys and control keys for removable cores.
Stamp each key with appropriate key control symbol and “U.S. Property – Do Not Duplicate”. Do not place building or room number on key.
3.2.4 Provide four additional change keys for each interchangeable core. Stamp each key with appropriate key symbol and “U.S. Property – Do Not Duplicate”. Do not place building or room number on key.
3.2.5 Furnish a quantity of key blanks equal to 20 percent of the total number of change keys.
Stamp each key with “U.S. Property – Do Not Duplicate”.
3.2.6 Install new hardware to existing doors.
3.2.7 Color: Satin Stainless Steel
3.3 Contractor shall turn in existing six-pin cores to Base Civil Engineering.
3.4 Building map of replaced cylinder locations will be provided once project has been awarded.
4.0 The following will be required of all contractors (prime or sub) personnel who will require base access to perform services related to this requirement:
4.1 Base Access Clearance Process: completion and submission of Security Access Form, which is submitted for background check; clearance is required for base access approval (this is accomplished post-award).
4.2 Antiterrorism Training: See attachment related to antiterrorism training requirements (accomplished post-award).
5.0 Site Visit: while site visit is not required, it is highly encouraged, due to the requirements of this project. Contractor’s who plan to bid on this project, but not attend site visit, should note the following provision applicable to this solicitation: FAR 52.237-1, Site Visit.