RFI 02_Material Submittals List.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Communications Server Room Renovation
Solicitation number
W50S8R-24-B-0001
Issued by

About this file

This document is a Schedule of Material Submittals for a federal contract opportunity related to repairing the Communications Server Room HVAC at the 179th Cyberspace Wing in Mansfield, Ohio. The contract number is PBXP 202107. The Schedule lists various submittal requirements for items such as the project schedule, closeout documents, construction waste management, concrete, doors, insulation, gypsum board, ceilings, flooring, painting, HVAC, electrical systems, and more. It specifies the required number of copies and the contract specification reference for each submittal.

The related federal contract opportunity is for the Communications Server Room Renovation project, with Solicitation Number W50S8R-24-B-0001. This is a small business set-aside with a NAICS code of 236220 and a magnitude between $500,000 and $1,000,000. The bid opening is scheduled for May 16, 2024. Interested contractors must be registered in the System for Award Management (SAM) and all questions must be submitted using the provided template. The project site is located at the 179th Cyberspace Wing in Mansfield, Ohio.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIAL SUBMITTALS

CONTRACT NUMBER:PROJECT NUMBER:PBXP 202107
Project: Repair Comm Server Room HVAC
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR

ITEM NUMBER OR DESCRIPTION OF ITEM CONTRACT SPECIFICATION REFERENCE NUMBER OR PAGE REQD # OF COPIES REQUIRED DATE/TIME OF SUBMITTALS AFTER AWARD BRIEF OR AT PRECONFERENCE DATE PACKAGE RECEIVED DATE FORWARD TO BCE DATE FORWARD TO LGC DATE CONTRACTOR NOTIFIED OF APPROVAL / DISAPPROVAL

General Requirements
Project Schedule01 30 00 2.024
General Requirements
Submittals Schedule01 30 00 2.034
CloseOut Requirements - O&M Manuals01 70 00 6.012
CloseOut Requirements - Warranty Documentation01 70 00 6.021
CloseOut Requirements - Project Record Drawings, Shop Drawings and Specifications01 70 00 6.03 A.1
Real Property Cost Information01 70 00 6.03 B.1
Construction Waste Management -Construction Waste Management Plan01 74 19 1.3.14
Construction Waste Management - Construction and Demolition Debris Reporting Form01 74 19 1.3.24
Construction Waste Management - Final Construction Waste Diversion Report01 74 19 1.3.34
Demolition - Demolition Plan02 41 00 1.44
Cast-In-Place Concrete - Equipment Shop Pad Drawings, Manufacturer Literature & Mix Design03 30 53 1.4 A,B,C4
Hollow Metal Doors - Shop Drawings08 11 13 7.4B4
Hollow Metal Doors - Manufacturer Literature08 11 13 7.4B4
Thermal Insulation - Manufacturers Literature and Data07 21 13 4.4C4
Thermal Insulation - Sustainable Construction Submittals07 21 13 4.4D4
Subsurface Preparation - Product Data09 05 16 1.2C4
Subsurface Preparation - Test Report09 05 16 1.2D4
Gypsum Board - Manufacturers Literature and Data09 29 00 1.4B4
Gypsum Board - Test Results09 29 00 1.4E4
Gypsum Board - Certificates09 29 00 1.4F4
Acoustical Ceilings - Manufacturers Literature and Data09 51 00 1.5C4
Acoustical Ceilings - Samples09 51 00 1.5D4
Acoustical Ceilings - Sustsainable Construction Submittals09 51 00 1.5E4
Acoustical Ceilings - Certificates09 51 00 1.5F4
Resilient Base - Manufacturers Literature and Data09 65 13 1.4B4
Resilient Base - Samples09 65 13 1.4C4
Resilient Base - Sustsainable Construction Submittals09 65 13 1.4D4
Access Flooring - Panel Sample09 69 00 1.4C4
Access Flooring - Shop Drawings09 69 00 1.4D4
Access Flooring - Manufacturer's Literature09 69 00 1.4E4
Access Flooring - Nanufacturers and Installers Qualifications.09 69 00 1.4H & I4
Painting - Sustainable Design Submittals - VOC09 91 00 1.3B4
Painting - Manufacturers Literature and Data09 91 00 1.3D4
Painting - Manufacturers Certificates09 91 00 1.3F4
Dry-Pipe Sprinkler - Manufacturer Data Sheet Sprinklers21 13 16 1.4A4
Plumbing Insulation - Manufacturers Literature and Data22 07 11 1.4C4
Refrigerant Piping - Shop Drawings23 23 00 1.4B4
Refrigerant Piping - Certifications23 23 00 1.4D4
CRAC Systems - Shop Drawings, Manufacturer Data & O&M Manuals for each CRAC system23 81 20 1.34
Air Coils-Manufacturer's Literature and Data23 82 16 1.4C4
Air Coils-Installation & O&M Manuals23 82 16 1.4D4
Air Coils-AHRI Certification23 82 16 1.4E4
Low Voltage Power Conductors - Shop Drawings26 05 19 1.4A4
Grounding and Bonding - Shop Drawings26 05 26 1.4A4
Raceway and Boxes - Shop Drawings26 05 33 1.4A 14
Raceway and Boxes - Certifications26 05 33 1.4A 24
Distribution Switchboards-Shop Drawings (Only for new devices added)26 24 13 1.5 A14
Distribution Switchboards-O&M Manuals (Only for new devices added)26 24 13 1.5 A24
Distribution Switchboards-Certifications (Only for new devices added)26 24 13 1.5 A34
Panelboards-Shop Drawings26 24 16 1.4 A14
Panelboards-O&M Manuals26 24 16 1.4 A24
Panelboards-Certifications26 24 16 1.4 A34
Motor Control Centers-Shop Drawings (Only for new devices added)26 24 19 1.5 A14
Motor Control Centers-O&M Manuals (Only for new devices added)26 24 19 1.5 A24
Motor Control Centers-Certifications (Only for new devices added)26 24 19 1.5 A34
Wiring Devices - Shop Drawings26 27 26 1.4A 14
Wiring Devices - Operations and Maintenance Manuals26 27 26 1.4A 24
Wiring Devices - Certifications26 27 26 1.4A 34
Enclosed Switches and Circuit Breakers - Shop Drawings26 29 21 1.4A 14
Enclosed Switches and Circuit Breakers - Operations and Maintenance Manuals26 29 21 1.4A 24
Enclosed Switches and Circuit Breakers - Certifications26 29 21 1.4A 34
4
4
4
THIS LIST IS NOT ALL CONCLUSIVE AND DOES NOT RELIEVE THE CONTRACTOR OF OTHER
SUBMITTAL REQUIREMENTS AS LISTED IN THE SPECIFICATIONS AND DRAWINGS.

AGOH FORM 437-7 (REV MAR 2011)